MONTHYEARML18066A6641999-09-30030 September 1999 Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065B0331996-10-25025 October 1996 Proposed Tech Specs Change Request,Revising Administrative Controls Sections of Plant TS ML18065B0171996-10-18018 October 1996 Proposed Tech Specs,Providing Info Necessary for Completion of Review & Approval Process Re Writting Commitment Be Made That Description of Palisades Operating Requirements Manual Will Be Added to FSAR ML18065A9551996-10-0202 October 1996 Proposed Tech Specs 4.6.1 Re Safety Injection sys,4.6.2 Re Containment Spray sys,4.6.3 Re Pumps & 4.6.4 Re Valves ML18065A9111996-09-0404 September 1996 Proposed Tech Specs 3.7, Electrical Power Systems. ML20117K9581996-09-0303 September 1996 Proposed Tech Specs,Revising Administrative Control & Resolution of NRC Comments ML18065A8631996-08-14014 August 1996 Proposed TS Table 4.3.2 Re Miscellaneous Surveillance Items ML18065A5861996-03-29029 March 1996 Proposed Tech Specs,Upgrading Plant TS & Bases to Emulate STS for Combustion Engineering Plants,NUREG-1432,Rev 1 ML18065A4911996-02-0606 February 1996 Proposed Tech Specs Re Removal of cross-train Testing Requirements from LCO Action Statements ML18065A4411996-01-18018 January 1996 Proposed Tech Specs Allowing Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas ML18065A4361996-01-18018 January 1996 Proposed Tech Specs Re Primary Coolant Pump Flywheel Insps ML18065A4111996-01-10010 January 1996 Proposed Tech Specs,Requesting Exemption from 10CFR50 App J & TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3841996-01-0505 January 1996 Proposed Tech Specs,Revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3771995-12-27027 December 1995 Proposed Tech Specs,Rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3481995-12-11011 December 1995 Proposed Tech Specs,Revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 of TS Relocating in CPC Quality Program Description ML18065A3341995-12-0606 December 1995 Proposed Tech Specs,Relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1761995-10-17017 October 1995 Proposed Tech Specs,Changing Pressurizer Cooldown Limit from 100 to 200 F/H,Adding Word Shall to TS 3.1.2c,adding Average Hourly to Column Headings in TS 3.1.2c & Removing Action 3.3.3C from Page 3-31 to 3-30 ML18065A1241995-09-21021 September 1995 Proposed Tech Specs Re Diesel Generator Testing ML18064A8411995-07-0505 July 1995 Proposed Tech Specs,Deleting Section 6.4, Training, & Revising Sections 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7611995-05-0101 May 1995 Proposed Tech Specs Re Requirements for Periodic DG Peak Load Tests ML18064A7331995-04-27027 April 1995 Revised Proposed Ts,Consisting of Changes to Basis in First Paragraph of Page 3-2 & Rev to List of Approved Methodology Repts ML18064A7361995-04-27027 April 1995 Proposed Tech Specs,Supporting Action Statements for Inoperable Safety Valves in Proposed Specs 3.1.7 of TS Change Request of 950103 ML18064A6631995-03-30030 March 1995 Proposed Tech Specs for One Time Surveillance Deferment ML18064A6691995-03-24024 March 1995 Proposed TS Re pressure-temp Limits ML18064A6221995-02-20020 February 1995 Proposed TS Figure 3-4, LTOP Setpoint Limit. 1999-09-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18066A6641999-09-30030 September 1999 Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18066A1841998-06-10010 June 1998 Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period. ML18068A3451998-04-29029 April 1998 Rev 9 to EI-9, Offsite Radiological Monitoring. ML18068A3441998-04-28028 April 1998 Rev 3 to EI-6.6, Gamma E Determination. ML18065B2271998-04-21021 April 1998 Reactor Vessel Neutron Fluence Methodology. ML20217C3101998-03-24024 March 1998 Palisades,Review of Actual Fluence Determination ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18065B2021998-03-10010 March 1998 Rev 7 to Relocated TS Per GL 89-09. ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML20197G3851997-12-17017 December 1997 Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan ML18065B2321997-10-24024 October 1997 Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18067A5151997-02-11011 February 1997 Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18065B2011996-12-24024 December 1996 Rev 11 to Offsite Dose Calculation Manual. ML18065B0861996-11-27027 November 1996 Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. ML20134P4071996-11-19019 November 1996 Suitability,Training & Qualification Plan, Rev 16 ML20137G3871996-10-29029 October 1996 Rev 6 to Relocated TS Per NRC GL 89-09 ML18065B0331996-10-25025 October 1996 Proposed Tech Specs Change Request,Revising Administrative Controls Sections of Plant TS ML18065B0171996-10-18018 October 1996 Proposed Tech Specs,Providing Info Necessary for Completion of Review & Approval Process Re Writting Commitment Be Made That Description of Palisades Operating Requirements Manual Will Be Added to FSAR ML18065A9551996-10-0202 October 1996 Proposed Tech Specs 4.6.1 Re Safety Injection sys,4.6.2 Re Containment Spray sys,4.6.3 Re Pumps & 4.6.4 Re Valves ML18065A9111996-09-0404 September 1996 Proposed Tech Specs 3.7, Electrical Power Systems. ML20117K9581996-09-0303 September 1996 Proposed Tech Specs,Revising Administrative Control & Resolution of NRC Comments ML18065A8631996-08-14014 August 1996 Proposed TS Table 4.3.2 Re Miscellaneous Surveillance Items ML18065A7661996-06-10010 June 1996 Expired Temporary Change O-96-044 to Rev 17 to SOP-17A, Clean Radwaste Sys. ML18065A7651996-06-10010 June 1996 Cancelled Tcn O-96-045 to Rev 17 to SOP-17B, Dirty Radwaste Sys. ML18065A5861996-03-29029 March 1996 Proposed Tech Specs,Upgrading Plant TS & Bases to Emulate STS for Combustion Engineering Plants,NUREG-1432,Rev 1 ML18065A8021996-02-21021 February 1996 Rev 2 to EM-09-13, ISI Pressure Testing Program. ML20137G3631996-02-16016 February 1996 Rev 10 to Offsite Dose Calculation Manual 1999-09-30
[Table view] |
Text
~*
Consumers Power Company PALISADES PLANT TECHNICAL SPECIFICATION CHANGE REQUEST PROPOSED PAGES 5 Pages
- 3. 8. REFUELING OPERATIONS C.gontd)
- g. During reactor vessel head removal and while refueling operations are being performed in the reactor, the refueling boron concentra-tion shall be maintained in the primary coolant system and shall be checked by sampling on each shift.
- h. Direct communication between personnel in the control room and at the refueling machine shall be available whenever changes in core geometry are taking place.
- 3. 8. 2 If any of the conditions in 3 .'8 .1 are not met, all refueling operations shall cease immediately, work shall be initiated to satisfy the required conditions and no operations that may change the reactivity of the core shall be made.
3.8.3 Refueling operation shall not be initiated before the reactor core has decayed for a minimum of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> if the reactor has been operated at power levels in excess of 2% rated power.
j.8.4 The ventilation system and charcoal filter in the fuel storage building shall*be operating whenever irradiated fuel which has decayed less than 30 days is being handled by either. of the following operations:.
- a. Refueling operation with the equipment door open, or
- b. Fuel handling in the fuel storage building.
If both fans are unavailable, any fuel movements in progress shall be completed and further fuel movements over the spent fuel storage pool shall be terminated until one fan is returned to service.
3.8.5 When spent fuel which has decayed less than one year is placed in the tilt pit storage racks, the bulk water temperature in the tilt pit storage area must be monitored continuously to assure that the water temperature does not exceed 150°F. Monitoring will continue for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after any addition of fuel to the main pool or the tilt pit or when a failure of the spent fuel pool cooling system occurs.
Basis The equipment and general procedures to be utilized during refueling are discussed in the FSAR. Detailed instructions, the above specifica-tions, and the design of the fuel handling equipment incorporating built-in.interlQcks .and. safety features provide assurance that no incident could occur during. the refueling operations that would result in a hazard to public health and safety.(1) Whenever changes are not being made in core geometry, one flux monitor is sufficient. This nu0482-0296b-43-142 3-47 Proposed
- 3. 13 __ CONTAINMENT BUILDING AND FUEL STORAGE BUILDING CRANES Applicability Applies to the use of _cranes over the primary coolant system and the spent fuel storage pool. I-Objective To specify restrictirins on the use of the overhead cranes in the Con-tainment Building and the Fuel Storage Building.
Specifications
- a. The containment polar crane shall not be used to transport loads -
over the primary coolant system if the temperature of the coolant or steam in the pressurizer exceeds 225°F.
- b. The fuel storpge building crane shall not be used to move material past the fuel storage pool unless the crane interlocks are operable or they are bypassed and the crane is under administrative control of a supervisor.
- c. The fuel storage building ventilation shall be operating and discharging through the HEPA and charcoal adsorbers during crane operation with loads in excess of 1300'pounds over the fuel storage pool when irradiated fuel which has decayed less than 90 days is in the spent fuel storage pool. If both fans are inoperable, any crane operations shall be completed and further crane operation with loads in excess of 1300 pounds over the spent fuel storage pool shall be terminated until one fan is returned to service.
Basis Loads are not to be allowed over the pressurized primary coolant system to preclude dropping objects which could rupture-the boundary of the primary coolant system allowing loss of coolant and overheating of the core. (1)
The fuel storage building crane is provided with a system of trolley and bridge electrical interlocks that will normally prevent th~ trolley from moving over the storage pool.(2) This minimizes the possibility of dropping an object on the irradiated fuel stored in the pool and resulting in the release of radioactive products. The interlocks may
-- be -bypassed under strict administrative control .to allow required movement of fuel and material over and to the east of the pool. The crane can be used over the equipment hatches located in the north and south ends of the Fuel Storage Building without the interlocks operable since a load, even if dropped) could not fall into the storage pool.
nu0482-0296c-43-142 3-69 Proposed
Table 4.2.3 HEPA FILTER AND CHARCOAL ADSORBER SYSTEMS Control Room Ventilation and Isolation System (Rated flow: 765 cfm) Fuel Storage Area HEPA/Charcoal Exhaust System (Rated flow: 10,000 cfm, two fans or 7300 cfm, one fan).
The filters in each of the above systems shall be demonstrated operable:
- a. At least once per 31 days by initiating, from the Control Room, flow through the HEPA filter and charcoal adsorbers and verifying that the system operates for at least 15 minutes.
- b. At least o~ce per refueling cycle or (1) after any structural maintenance on the HEPA filter or charcoal adsorber*housings, or (2) following major painting, fire or chemical release in any ventilation zone communicating with the system when the HEPA Filter or charcoal adsorbers. are in operation by:
- 1. Verifying within 31 days after removal that a laboratory analysis of) a representative carbon sample obtained in accordance with
- ~Regulatory Position C.6.b. of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory
. Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978 except that the Fuel Storage Area shall have a methy iodide limit of 94% instead of 99%, or replacing with charcoal adsorbers meeting the specifications of Regulatory Guide 1.52, Position C.6.a, Revision 2, March 1978.
- 2. Verifying that the HEPA filter bank removes greater than or equal to 99% of the DOP when they are tested in-place in accordance with ANSI N510-1975 while operating the system at its rated flow
+/- 20%.
- 3. Verifying that the charcoal absorber removes greater than or equal to 99% of a hydrogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 while operating the system at its rated flow +/- 20%.
nu0482-0296f-43-13 4-15c Proposed
Table 4.2.3 (Contd)
HEPA FILTER AND CHARCOAL ADSORBER SYSTEMS
- c. At least once per refueling cycle by:
- 1. Verifying that the pressure drop across the combined HEPA filter and charcoal adsorber bank is less than (6) inches Water Gauge while opera,ting the system.
- 2. Verifying that on a containment high-pressure and high-radiation test signal, the system automatically switches into a recirculating mode of operation with flow through the HEPA filter and charcoal adsorber bank. (Control Room ventilation only.)
- 3. Verifying that the system maintains the Control Room at a !
positive-pressure of greater than or equal to 0 .10 inch WG 1*
relative to the viewing gallery (dPIC 1834) during system operation. (Control Room ventilation only.) J II
- 4. Verifying that with the ventilation system exhausting through the j HEPA/Charcoal Filters at its rated flow +/- 20%, the bypass flow through damper 1893 is less than 1% of total flow. (Fuel Storage Area only.)
- d. After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> (see Note 1) of charcoal adsorber operation by:
Verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b. of Regulatory Guide 1.52 Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978 except that the Fuel Storage Area shall have a methy iodide limit of 94% instead of 99%,
or replacing with charcoal.adsorbers meeting the specifications of Regulatory Guide 1.52, Position C.6., Revision 2, March 1978.
- e. After each complete or partial replacement of a HEPA filter bank by:
Verifying that the HEPA filter bank removes greater than or equal to 99% of the DOP when they are tested in-place* in accordance with ANSI N510-1975 while operating the system at its rated flow +/- 20%.
Note 1. Should the 720-hour limitation occur during a plant operation requiring the use of the HEPA filter and charcoal adsorber - such as during a refueling - testing may be delayed until the cornpletion*of the plant operation or up to 1,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of filter operation whichever occurs first.
nu0482-0296f-43-142 4-15d Proposed
A
~ . '
Table 4.2.3 (Contd)
HEPA Filter and Charcoal Adsorber Systems
- f. After each complete or partial ~eplacement of a charcoal adsorber bank by: I.
Verifying that the charcoal adsorber removes greater than or equal to 99% of.a hydrogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI NSl0-1975 while operating the system at its rated flow +/- 20%.
- g. Verify that the Control Room temperature is < 120°F once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the temperature in the Control Room reaches 105°F.