MONTHYEARRA-17-055, License Amendment Request to Implement BWRVIP-18, Revision 2-A2017-08-30030 August 2017 License Amendment Request to Implement BWRVIP-18, Revision 2-A Project stage: Request RA-17-084, Submittal of Relief Request for Extension of Torus Examinations in Accordance with 10 CFR 50.55a(z)(1)2017-12-19019 December 2017 Submittal of Relief Request for Extension of Torus Examinations in Accordance with 10 CFR 50.55a(z)(1) Project stage: Request ML18003A4122018-01-0303 January 2018 NRR E-mail Capture - for Your Action - RAI - Oyster Creek BWRVIP LAR (CAC No. MG0180; EPID No. L-LLA-2017-0304) Project stage: RAI RA-18-015, Withdrawal of Application to Revise Technical Specifications to Implement BWRVIP-18, Revision 2-A and Relief Request for Extension of Torus Examinations2018-02-15015 February 2018 Withdrawal of Application to Revise Technical Specifications to Implement BWRVIP-18, Revision 2-A and Relief Request for Extension of Torus Examinations Project stage: Withdrawal ML18047A4302018-03-16016 March 2018 FRN, Withdrawal of Request to Revise License Condition to Implement BWRVIP-18, Revision 2-A, BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines (CAC MG0180; EPID L-2017-LLA-0304) Project stage: Withdrawal ML18047A4272018-03-16016 March 2018 Letter, Withdrawal of Request to Revise License Condition to Implement BWRVIP-18, Revision 2-A, BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines (CAC MG0180; EPID L-2017-LLA-0304) Project stage: Withdrawal NRC-2018-0058, FRN, Withdrawal of Request to Revise License Condition to Implement BWRVIP-18, Revision 2-A, BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines (CAC MG0180; EPID L-2017-LLA-0304)2018-03-16016 March 2018 FRN, Withdrawal of Request to Revise License Condition to Implement BWRVIP-18, Revision 2-A, BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines (CAC MG0180; EPID L-2017-LLA-0304) Project stage: Withdrawal 2018-01-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ,
March 16, 2018 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION -WITHDRAWAL OF AMENDMENT RE: REVISION OF RENEWED FACILITY OPERATING LICENSE CONDITION 2.C.(5) FOR BWRVIP-18, REVISION 2-A (CAC NO. MG0180; EPID L-2017-LLA-0304)
Dear Mr. Hanson:
By application dated August 30, 2017 (Agencywide Documents Access and Management System {ADAMS) Accession No. ML17242A211 ), Exelon Generation Company, LLC (Exelon or the licensee), requested changes to Renewed Facility Operating License (FOL) No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek). Exelon requested an amendment to revise the Oyster Creek Renewed FOL license condition 2.C.(5) regarding the Electric Power Research lnstitute's technical report BWRVIP-18, "BWR [Boiling Water Reactor] Vessel and Internals Project, BWR Core Spray Internals inspection and Flaw Evaluation Guidelines,"
revision from 1999 to 2016.
Subsequently, by letter dated February 15, 2018 (ADAMS Accession No. ML18047A023), you withdrew the amendment request.
B. Hanson The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
. Lamb, Senior Project Manager cial Projects and Process Branch Di ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219
Enclosure:
Notice of Withdrawal cc: Listserv
ENCLOSURE FEDERAL REGISTER NOTICE
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-219; NRC-2018-0058]
Exelon Generation Company, LLC Oyster Creek Nuclear Generating Station Revision to License Condition 2.C.(5) Regarding BWRVIP-18 AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; withdrawal by applicant.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC to withdraw its application dated August 30, 2017, for a proposed amendment to Renewed Facility Operating License No. DPR-16. The proposed amendment would have revised License Condition 2.C.(5) regarding the Electric Power Research lnstitute's (EPRl's) technical report BWRVIP-18, "BWR [Boiling Water Reactor] Vessel and Internals Project, BWR Core Spray Internals inspection and Flaw Evaluation Guidelines," revision from December 2, 1999, to December 21, 2016.
DATES: March 21, 2018.
ADDRESSES: Please refer to Docket ID NRC 2018-0058 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
- Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0058. Address questions about NRC dockets to Jennifer Borges; telephone: 301-287-9127; e-mail: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONT ACT section of this document.
- NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/readinq-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: John G. Lamb, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-3100, e-mail: john.lamb@nrc.gov.
2
SUPPLEMENTARY INFORMATION:
The NRC has granted the request of Exelon Generation Company, LLC (the licensee) to withdraw its August 30, 2017, application (ADAMS Accession No. ML17242A211 ), for a proposed amendment to Renewed Facility Operating License No.
DPR-16 for the Oyster Creek Nuclear Generating Station, located in Ocean County, New Jersey.
The proposed amendment would have revised License Condition 2.C.(5) regarding EPRl's technical report BWRVIP-18, "BWR Vessel and Internals Project, BWR Core Spray Internals inspection and Flaw Evaluation Guidelines," revision from December 2, 1999, to December 21, 2016.
The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Registeron October 10, 2017 (82 FR 47037).
However, by letter dated February 15, 2018 (ADAMS Accession No. ML18047A023), the licensee requested to withdraw the proposed amendment.
Dated at Rockville, Maryland, this 161h day of March 2018.
For the Nuclear Regulatory Commission.
IRA/
John G. Lamb, Senior Project Manager, Special Projects and Process Branch, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
3
B. Hanson
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION-WITHDRAWAL OF AMENDMENT RE: REVISION OF RENEWED FACILITY OPERATING LICENSE CONDITION 2.C.(5) FOR BWRVIP-18, REVISION 2-A (CAC NO. MG0180; EPID L-2017-LLA-0304) DATED MARCH 16, 2018 DISTRIBUTION:
PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLspb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMOysterCreek Resource RidsRgn 1MailCenter Resource ADAMS Accession Nos. ML18047A427 FRN: ML18047A430 OFFICE NRR/DORL/LSPB/PM NRR/DORL/LSPB/LA NRR/DORL/LSPB/BC NRR/DORL/LSPB/PM NAME Jlamb JBurkhardt DBroaddus Jlamb DATE 02/20/2018 02/20/2018 03/14/2018 03/16/2018 OFFICIAL AGENCY RECORD