Other: A01658, Submits Addl Info Re Independence of Four Channels of Reactor Protection & Engineered Safeguards Actuation Sys Measurement Logic,In Response to NRC, ML17212B541, ML18047A273, ML20009C700, ML20009D105, ML20050Q900, ML20054C030, ML20054C820, ML20054C988, ML20054C994
|
MONTHYEARML18046B4081977-06-28028 June 1977 Safety Evaluation Supporting Amend 15 to License DPR-67. Calvert Cliffs Sample Tech Specs Re Reactor Protection Sys & Engineered Safety Features Actuation Sys Encl Project stage: Approval ML20003G0471978-09-12012 September 1978 Summary of 780802 Meeting W/Utils & C-E Re Length of Time Single Failed Reactor Protection Sys Channel Should Be Bypassed Before Requiring Tripping Project stage: Meeting ML20238E6041978-09-15015 September 1978 Forwards Ltrs to Utils Documenting NRC Position Presented at 780802 Meeting & Requesting That STS Allowing Limited Reactor Protection Sys Channel Bypass Be Proposed Project stage: Meeting ML20238E6971978-09-30030 September 1978 Sumarizes 780802 Meeting W/Utils & C-E in Bethesda,Md Re Action Requirements in Event of Reactor Protection Sys Channel Inoperability.Meeting Held to Clarify NRC Position on Subj as Presented in .W/O Encls Project stage: Meeting ML20238E6521978-09-30030 September 1978 Sumarizes 780802 Meeting W/Utils & C-E in Bethesda,Md Re Action Requirements in Event of Reactor Protection Sys Channel Inoperability.Meeting Held to Clarify NRC Position on Subj as Presented in .W/O Encls Project stage: Meeting ML20238E6441978-09-30030 September 1978 Sumarizes 780802 Meeting W/Utils & C-E in Bethesda,Md Re Action Requirements in Event of Reactor Protection Sys Channel Inoperability.Meeting Held to Clarify NRC Position on Subj as Presented in .W/O Encls Project stage: Meeting ML20238E7021978-09-30030 September 1978 Sumarizes 780802 Meeting W/Utils & C-E in Bethesda,Md Re Action Requirements in Event of Reactor Protection Sys Channel Inoperability.Meeting Held to Clarify NRC Position on Subj as Presented in .W/O Encls Project stage: Meeting ML18046A5781981-04-16016 April 1981 Requests Results within 90 Days Re Review of Reactor Protection & Engineered Safety Features Actuation Sys Channel Operability.Application for License Amend Re Tech Specs Change May Be Substituted for Review Project stage: Approval ML20003G6471981-04-16016 April 1981 Requests Results within 90 Days Re Review of Reactor Protection & Engineered Safety Features Actuation Sys Channel Operability.Application for License Amend Re Tech Specs Change May Be Substituted for Review Project stage: Approval ML20009C7001981-07-15015 July 1981 Advises That Verification Results Re Adequacy of Physical & Electrical Separation & Independence of Reactor Protection Sys Instrument Channels & Engineered Safety Features Actuation Sys Subsystems Expected by End of 1982 Outage Project stage: Other ML20009D1021981-07-21021 July 1981 Application for Amend to License DPR-40 to Upgrade Provisions Re Operation W/Tripped or Bypassed Reactor Protection or Emergency Safeguards Feature Channel Project stage: Request ML20009D0991981-07-22022 July 1981 Forwards Application for Amend to License DPR-40 & Proposed Tech Specs.Amend Upgrades Provisions Re Operation W/Tripped or Bypassed Reactor Protection or Emergency Safeguards Feature Channel.Certificate of Svc Encl Project stage: Request ML20009D1051981-07-22022 July 1981 Proposed Tech Specs Upgrading Provisions Re Operation W/ Tripped or Bypassed Reactor Protection or Emergency Safeguards Feature Channel Project stage: Other ML18046A8251981-07-27027 July 1981 Informs That Applicant Will Submit Application for Tech Spec Changes by 810915 Re Reactor Protection Sys Inoperable Channel Condition.Documentation of Design Similarities to St Lucie & Calvert Cliffs Complete Project stage: Request A01658, Submits Addl Info Re Independence of Four Channels of Reactor Protection & Engineered Safeguards Actuation Sys Measurement Logic,In Response to NRC1981-10-23023 October 1981 Submits Addl Info Re Independence of Four Channels of Reactor Protection & Engineered Safeguards Actuation Sys Measurement Logic,In Response to NRC Project stage: Other ML20050Q9001982-03-31031 March 1982 Informs of Modified Staff Position on Length of Time Reactor Protection Sys or ESF Actuation Sys Channel May Be Bypassed. San Onofre Unit 2 Tech Spec & Design Criteria Encl Project stage: Other ML20054C8201982-03-31031 March 1982 Provides Options for Licensees Which Would Allow Flexibility in Performing Maint & Testing of Inoperable Channels,Per .San Onofre Proof & Review Tech Specs Encl Project stage: Other ML20054C9941982-03-31031 March 1982 Informs of Modified Position on Length of Time Reactor Protection Sys or ESF Actuation Sys Channel May Be Bypassed. Proposed Tech Specs Encl Project stage: Other ML18047A2731982-03-31031 March 1982 Forwards Proof & Review Copy of Tech Specs,Incorporating Changes to Permit 48-h Bypass of Reactor Protection Sys & ESF Actuation Sys Inoperable Channel.Design Criteria Permitting Bypass for Indefinite Period Encl Project stage: Other ML20054C0301982-03-31031 March 1982 Forwards Proof & Review Copy of Tech Specs,Incorporating Changes to Permit 48-hr Bypass of Reactor Protection Sys & ESF Actuation Sys Inoperable Channel.Design Criteria Permitting Bypass for Indefinite Period Encl Project stage: Other ML20054C9881982-03-31031 March 1982 Advises That NRC Position Modified Re Reactor Protection Sys & ESF Actuation Sys.Proposed Tech Specs Encl Project stage: Other ML17212B5411982-03-31031 March 1982 Informs of Modified Position on Length of Time Reactor Protection Sys or ESF Actuation Sys Channel May Be Bypassed. Proposed Tech Specs Encl Project stage: Other 1981-04-16
[Table View] |
Text
\\'..
~*
--,'-~-
.,;.----* APR 16 iOOa As you know, our staff conducted an on-site RPS review at the Calvert Cliffs and St. Lucie units. A copy of the resultant Safety Evaluation for St. Lucie, presenting the finding of the RPS review (pages 3 to 5),
is provided for your information as Enclosure 2.
Our conclusion was that allowing indefinite bypass of one of the four RPS is not justified, hut since the four channel CE_ system does have some independence, bypassing for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during testing or maintenance of one RPS channel is justified.
As an alternative to the requested review of RPS and ESFAS channel separation, we will consider issuance of the Calvert Cliffs and St. Lucie type TS for your RPS and ESFAS if you provide an application including documentatfon ofdesign similarity to those of Calvert Cliffs arid St.
Lucie.
Enclostire 3 provides sample TS for your use.
Any such application should be submitted within the same 90 days of your receipt of this letter.
If your have questions on this subject, please contact your NRC Project Manager.
Enclosures:
- 1. Minutes of meeting
- 2. Safety Evaluation for St. Lucie
- 3. Calvert Cliffs TS cc:
See next page
~
~
NRC PDR L PDR NSIC TERA ORB#3 Rdg DEisenhut OELD I &E ( 3) 810428 0 '\\°;
ORB#S Rdg ( 5)
RAClark PMKreutzer (3)
ACRS ( 10)
JHeltemes Gray File Sincerely,
!Original signed by; Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing
-'~----
'":::::: f.~~!~~~~::: :
- ~~AC.'h~ 1--~~~-~~-..-... *.*.* ~::: ::: : g_~~~:d : : : :: : ::: : :: : : : :: : : : : :: : : : : : : ::::::: :: : ::
- DATE~~~-! **._!.~-~.... *
- l.l(r..l.?.1... ******,.. /..).~.1..........t.(~;.aJ.......... *.. **** ** * ** *** *** *** ****** **** **** *****
- NRcFoRM31s1101so1NRcM~2.oio OFFICIAL RECORD-COPY-
- usGPcl
- 10so=329~824