ML18039A497

From kanterella
Jump to navigation Jump to search
Proposes Listed License Condition for Units 2 & 3 Power Uprate Based on 980828 Telcon Re Operator Training with NRC BFN Project Manager
ML18039A497
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/01/1998
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M99711, TAC-M99712, NUDOCS 9809100270
Download: ML18039A497 (10)


Text

4 ~

REGULA'l~ Y INFORMATION DISTRIBUTIOh SYSTEM (RIDS)

ACCESSION NBR':9809100270 DOC.DATE: 98/09/01 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260

.50-'2)6. Browns Ferry Nuclear Power Station, Unit 3, Tennessee 050002'96 AUTH. NAME AUTHOR AFFILIATION ABNEY,T.E.' Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Submits. listed proposed license condition for Units 2 E 3,

]per 980828 telcon w/NRC.

A DISTRIBUTION CODE: D030D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: TVA Facilities - Routine Correspondence T NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD2-3-PD DEAGAZIO,A INTERNAL: ACRS OGC/HDS3 RES/DE/SSEB/SES EXTERNAL: NOAC NRC PDR D

0

  • N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 0

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL

il ~ ~

4'

Tennessee Valley Authority. Post Office Box 2000. Decatur. Alabama 35609

'September 1, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of )Docket Nos. 50-260 Tennessee Valley Authority ) 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 2 AND 3 TECHNICAL SPECIFICATION (TS) NO. 384 REQUEST FOR LICENSE AMENDMENT FOR POWER UPRATE OPERAT ION r PROPOSED OPERAT ING LICENSE CONDITIONS (TAC NOS. M99711 AND M99712)

On March 30, 1998, NRC requested that TVA provide additional information concerning operator training with regard to the power uprate license amendment request. NRC requested that TVA propose a license condition and/or commitment that stipulates the following:

(a) Provide classroom and simulator training on all changes that effect operator performance caused by the power uprate modification. All training and the plant simulator will be modified, as necessary, to incorporate changes identified during the startup testing program.

(b) Complete simulator changes that are consistent with ANSI/ANS 3.5-1985. Simulator fidelity will be re-validated in accordance with ANSI/ANS 3.5-1985, Section 5.4.1, "Simulator Performance Testing."

Simulator revalidation will include comparison of individual simulated systems and components and 9809100220 98090i PDR ADOCK 05000260 V PDR

Ot U. S. Nuclear Regulatory Commission Page 2 September 1, 1998 simulated integrated plant steady state and transient performance with reference plant responses using. similar startup test procedures.

(c) Complete all control room and plant process computer system changes as a result of the power uprate.

(d) Modify operator training and the plant simulator, as required, to address all related issues and discrepancies that are identified during the startup testing'program.

By letter dated April 28, 1998, TVA provided additional information requested by NRC. Enclosure 2 to the April 28, 1998, letter provided the commitments requested by NRC.

Based on an August 28, 1998, telephone conversation regarding operator training with the NRC BFN Project Managery TVA proposes the following license condition for Units 2 and 3 power uprate:

"Classroom and simulator training on all power uprate related changes that affect operator performance will be conducted prior to operating at uprated conditions.

Simulator changes that are consistent with power uprate conditions will be made and simulator fidelity will be validated in accordance with ANSI/ANS 3.5-1985. Training and the plant simulator will be modified, as necessary to incorporate changes identified during startup testing."

TVA notes that changes to the plant simulator control room and simulator process computer have been completed.

4l p~

U. S. Nuclear Regulatory Commission Page 3 September 1, 1998 If you me have at (256) any questions, about this'hange, 729-2636.

please telephone I

Si cerely, T. E'. Abney Manager of 'L'nsing and Industr Affair cc: See page 4

II ~-

~X

U. S. Nuclear Regulatory Commission Page 4 September 1, 1998 cc: Harold O.. Christensen, Branch Chief U. S'. Nuclear Regulatory Commission Region II 61 Forsyth Street, S,. W.

Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens,. Alabama 3561'1 Mr. Albert W. De Agazio, Project Manager U.S. Nuclear Regulatory Commission One White Flint,. North 11555 Rockville Pike Rockville, Maryland 20852 Mr.. L. Raghavan, Project Manager U.,S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852