Expresses NRC Concerns Re Completeness & Timeliness of Util Responses to Requests for Addl Info Concerning License Amend Request for Power Uprate & Impact on Schedule for Review
ML18039A380
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/09/1998
From: Raghavan L
NRC (Affiliation Not Assigned)
To: Crane C
TENNESSEE VALLEY AUTHORITY
References
TAC-M99711, TAC-M99712, NUDOCS 9806150006
Download: ML18039A380 (6)


Text

~~ ~9,8 RE00 se I

a tlO I

C th0 gO

++*++

UNITED STATES NUCLEAR REGULATORY COIVIMISSION WASHINGTON, D.C. 205554001 June 9, 1998 Mr. C. M. Crane Site Vice President Browns Ferry Nuclear Plant Post Office Box 2000 (PAB 1E)

Decatur, Alabama 35609-2000

SUBJECT:

BROWNS FERRY PLANT UNITS 2 AND 3 - RESPONSES TO REQUEST FOR ADDITIONALINFORMATIONREGARDING TECHNICALSPECIFICATION CHANGE TS-384 REQUEST FOR LICENSE AMENDMENTFOR POWER UPRATE OPERATION (TAC NOS. M99711 AND M99712)

Dear Mr. Crane:

The purpose of this letter is to express our concerns regarding the completeness and timeliness of your responses to our requests for additional information (RAI) relating to your license amendment request for power uprate, and the impact on the schedule for our review.

By letter dated October 1, 1997, Tennessee Valley Authority (TVA)proposed revisions to the Browns Ferry Nuclear Plant, Units 2 and 3 Technical Specifications (TS) to permit operation of the units at the uprated power level of 3458 MWt. Based on its review, the staff issued several RAls and requested your response to them by specified dates such that our reviews could be completed consistent with your schedule.

We find that certain of your responses have not been timely, and several issues and analyses in support of your license amendment are incomplete.

For example:

1.

You responded to our February 18, 1998 RAI on April 1, and May 1,1998, instead of by March 15, 1998.

5.

Your original submittal of October 1, 1997, and subsequent letters of March 16, and May 20, 1998, indicate that TVAhas not yet completed the Environmental Qualification (EQ) of electrical equipment portion of the power uprate analysis.

We understand that this analysis is expected to be completed by the end of June 1998.

TVAletter of March 16, 1998 indicates that the post accident containment temperature has increased from 322'F to 336'F. Containment integrity has not been demonstrated for the increased temperature.

TVAletter of March 16, 1998 proposed additional TS changes in support of the power uprate that were not 'ncluded in the previous submittals.

In a telephone conversation on May 28, 1998, TVAindicated that its October 1, 1997 submittal may include incorrect data relating to the design basis rod drop accident.

980hi50006 980609 PDR aDOCX 0S000260

.P PDR

+@ 8M Ciao lfilFR Peer

C.M. Crane In a telephone conversation with your staff on May 28, 1998, we discussed our concerns and reiterated the need for providing complete documentation in support of your license amendment request.

The complex nature of power uprate and other license amendment requests (e.g.,

conversion to improved standard technical specifications) and your plans to implement them during the upcoming outage in November 1998 present a challenge to our resources.

Therefore, it is imperative that you provide quality and comprehensive submittals, and timely responses to our RAIs such that we can complete our review of your requests consistent with your schedule.

We find that your schedule for completing supporting documentation (i.e., Items 3, 4, 5, and 6 above) may not permit completion of our review consistent with your requested approval of the license amendment by July 1, 1998 for Unit 3, and reflects a need to improve your planning of licensing submittals.

We request that you implement appropriate corrective actions to improve your performance in planning your licensing activities.

, Ifyou have any questions, please write or call me at (301) 415-1471.

Sincerely, (Original Signed By)

L. Raghavan, Senior Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page Docket No. 50-260, 50-296 DIS RIBUTION'UBLIC Browns Ferry r/f JCalvo LPlisco, Rll FHebdon

-Bocket*File BBo ger JZwolinski OGC ACRS PKang PShemanski BClayton ADeAgazio

JJaudon, Rll LRaghavan OFC NAME DATE PDIl-3/PM LRaghavan:c

/

/98 P Dll-3/LA BClayto

&/ 9'98 PDII-3/D FHebdon I g I98

/

/98 OFFICIAL RECORD COPY DOCUMENT NAME: G:\\BFN>99711.ltr c:$99711hconcern.ltr

V I*

Mr. O. J. Zeringue Tennessee. Valley Authority BROWNS FERRY NUCLEAR PLANT CC:

Mr. J. A. Scalice, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Jack A. Bailey, Vice President Engineering 8 Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. C. M. Crane, Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 General Counsel Tennessee Valley Authority ET 10H 400 West Summit Hill Drive Knoxville, TN 37902 Mr. Raul R. Baron, General Manager Nuclear Assurance Tennessee Valley Authority 4J Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. Karl W. Singer, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Mark J. Burzynski, Managar Nuclear Licensing Tennessee Valley Authority 4J Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. Timothy E. Abney, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 37402-2801 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW., Suite 23T85 Atlanta, GA 30303-3415

. Mr. Leonard D. Wert Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant I0833 Shaw Road Athens, AL35611 State Health Officer Alabama Dept. of Public Health 434 Monroe Street Montgomery, AL 35130-170I Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611