JUL 16 l986
Docket Nos.
50-220
50-410
Niagara
Mohawk Power Corporation
ATTN:
Mr. C.
V. Mangan
Senior Vice President
300 Erie Boulevard West
Syracuse,
13202
Gentlemen:
Subject:
Combined Inspection
Nos. 50-220/86-08
an
50-410/86-19
A routine radiological controls inspection
was conducted
by Mr.
R.
L. Nimitz
of this office on May 19-23,
1986 at the Nine Mile Point Nuclear Station,
Units
1 and 2.
The findings of the inspection
were discussed
with Mr . T. Perkins.
The inspection of Unit
1 and Unit 2 covered:
previous findings; radiological
controls for the outage;
ALARA; preoperational
testing;
and worker concerns.
One violation of NRC requirements
in the area of instruction of workers was
identified.
Please
reply to this matter in accordance
with the enclosed
Appendix A.
Our review of the circumstances
surrounding this violation in-
dicates that it occurred primarily because
of insufficent oversight
and control
of contractors.
In your reply to this violation, please
describe
the action
you have taken or plan to take to improve oversight
and control,
and communi-
cations with contractors.
Our inspector also reviewed the establishment
and implementation of long term
corrective actions for a violation previously identified by your staff.
This
violation involved failure to perform contamination
surveys prior to grinding
on highly contaminated
components.
Our review of this violation indicates that
inadequate
corrective actions
were taken to prevent recurrence.
The inade-
quacies
are described
in the enclosed
reports
Since all tests for non-issuance
of a violation,
as described
in 10 CFR Part 2 Appendix C, were not met, this
violation is included in the enclosed
Appendix A.
Please
reply to this matter
in accordance
with Appendix A.
The replies
requested
by the letter are not subject to clearance
by the Office
of Management
and Budget under the Paperwork
Reduction Act of 1980,
PL 96-511.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Document
Room.
ab07240144
Sb071b
ADOCK 05000220
8
OFFICIAL RECORD
COPY
CIR
NMP 86-08/19 - 0001.0.0
07/15/86
Niagara
Mohawk Power
Corporation
Your cooperation with us in this matter is appreciated.
Sincerely,
0<<4 >~.wa7
4 e. ~ c
w<~Dj ~
Tho as T. Martin
Director
ivision of Radiation Safety
and Safeguards
Enclosure:
1. Appendix A, Notice of Violation
2.
Combined
NRC Region I Inspection
Report Nos.
50-220/86-08
50-410/86-19
cc w/encl:
T.
E.
Lempges,
Vice President,
Nuclear Generation
J.
A. Perry,
Vice President,
Quality Assurance
T. Perkins,
General
Superintendent,
Nuclear Generation
W. Hansen,
Manager of Quality Assurance
T.
Roman, Station Superintendent
J. Aldrich, Supervisor,
Operations
W. Drews, Technical
Superintendent
O.
Quamme,
NMP-2 Project Director
C.
Beckham,
QA Manager
R.
B. Abbott, Station Superintendent
Troy B. Conner, Jr.
Esquire
John
W. Keib, Esquire
Director,
Power Division
Public Document
Room (POR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
bcc w/encl:
Region I Docket
Room (w/concurrences)
Management Assistant
DRMA (w/o encl)
ORP Section Chief
RI:DRSS
Kaminski/mm
7/iY /86
RI:DRSS
7/IQ /86
RI:ORSS
Shanbaky
7/i EI86
RI: DRSS
e 1 l a<tv .~
~~5
7//686
OFFICIAL RECORD
COPY
CIR NMP 86-08/19 - 0002.0.0
07/15/86
0