Text
t, i
~
April 30, 1986 Docket Nos.
50-, 259/260/296 Mr. S. A. White Manager of Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Mar ket Street Chattanooga, Tennessee 37401
Dear Mr. White:
DISTRIBUTION NRC-PDR Local PDR Gray File RBernero SNorris MGrotenhuis RClark ACRS (10)
BGrimes EJordan JPartlow HSmith SScott OELD The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions."
To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees'mplementation of approved regulatory improvements.
To assist me in developing this information for Browns Ferry Nuclear Plant, Units I, 2 and 3, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed/implemented or are expected to be completed.
For each requirement that has been completed, enter "completed" under the Status column and the date the item was completed.
For requirements that have not been completed/implemented, provide the projected date and enter "projected" under the Status column.
I do not expect or want a major effort made to obtain precise dates.
- Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented.
For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time.
For projected completions/implementations in 1986, use month and year.
Use year only for projections thereafter.
Please provide a response in the form of a marked up listing by May 31, 1986.
In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.
This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.
Sincerely,
Enclosure:
As stated arshall Gro en uis, Project Manager BWR Projec( Directorate ¹2 Division of BWR Licensing DBL:PD¹2 SAS roars 4/~0/86 DBL:PD¹2 DBL:PD~
MGrotenhuis RClar~
~ 4/8t /86 4/20/86 DBL:PD¹2 DJ4@0$ r 4$jy /86 cc w/enclosure:
See next x
page 8605080140 860430 PDR ADOCK 0500025%I P
0 H
'i>a E
1 t1r.
S.
A. I!hite Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3
CC:
II. S. Sanqer, Jr., Esouire General Counsel Tennessee Yalley Authority 400 Commerce Avenue E 11B 330 Knoxville, Tennessee 37902 t'Ir. Ron Rogers Tennessee Valley Authority 5N 130B Lookout Place Chattanooga, Tennessee 37402-2801
- Chairman, Limestone County Commission Post Office Box 188
- Athens, Alabama 35611 Ira L. meyers, tl.D.
State Health Officer State Department of Public Itealth State Office Buildinq Montgomery, Alabama 36130 Nr. K. I!. Hhitt E3A8 400 'Ilest Summit Hill Drive Tennessee Valley Authority Knoxville, Tennessee 37902 l'f. C. Bibb Site Director, BFNP Tennessee Valley Authority Post Office Box 2000
- Decatur, Alabama 35602 Resident Inspector U. S. Nuclear Reaulatory Commission Route 2, Box 311
- Athens, Alabama 35611 Vr. Donald L. 1!illiams, Jr.
Tennessee Valley Authority 400 Hest Summit tlill Drive, 1!10B85 Knoxville, Tennessee 37902 Robert L. Lewis, tianac,er, BFNP Tennessee Valley Authority Post Office Box 2000
- Decatur, Alabama 35602 Reqional Administrator, Region II U. S.
t/ucl.ear Regulatory Commission 101 Harietta Street, Suite 3100 Atlanta, Georaia 30303
!1r. Steven Roessler U. S. Nuclear Regulatory Commission Reactor Training Center Osborne Office Center, Suite 200 Chattanooga, Tennessee 37411
R-1208731-001 REGULATORY INFORHATI ON TRACKINGSYSTEM FAG IL I TY IMP L EHENTATI ON PAGE NO.:
35 03/31/86 FACILITY: BROWtts FERRY 1
PLANT LOCATION: 10 HI NH OF DECATUR'LA DOCKET ttUHBER:
050-00259 ARCH/ENGINEER -
J.
PAULK LICENSED POWER:
3293 MHT DESIGtt POHER:
1065 MltE ttSSS VEttDOR-'GE PROJECT HAttAGER-R.
CLARK BRANCH CHIEF:
D.
MULLER LIC. ASSISTANT:
S.
MPA TIT E LIC ACT COMPLETE LICENSEE STATUS
~DAT H08318 A-01 10 CFR 50.55 A(G) - ISI H08133 A-02 APPENDIX I ALARA H06869 A-03 SECURITY REVIEWS-MODIFIED AMEttDHENT PLAttS M08715 A-00 APPENDIX J CONTAINMEWT LEAK TESTING H07910 A-05 GE HARK I COWTAIttHEttT TECH SPECS-SHORT TERM H08560 A-06 RESPIRATORY PROTECTION SYSTEM H06905 A-08 ECCS EVALUATION-GENERIC PER 50.46 COMPLIANCE H11366 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE H10463 A-10 CONTINGENCY PLANttING H10655 A-11 GUARD TRAINING PLANS H10059 A-12 VITAL AREA ANALYSIS H1132%
A"16 10CFR 50.55 A(G) INSERVICE TESTING 08/30/83C 06/16/86 v
02/23/79C 10/20/84C 12/08/78C 10/11/79C 05/11/79C 02/06/81C 06/18/81C 06/15/81C 06/12/82C 06/20/86 H13122 A-15 QUALITY ASSURANCE REQUEST REGARDING DIESEL GENARAT 07/25/80C H13123 A-15 QUALITY ASSURANCE REQUEST REGARDING DIESEL GENARAT 07/25/80C M%3872 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTIONS TESTItlG 03/17/82C H51073 A-17 ItlSTRUHENTATIOtl TO FOLLOH THE COURSE OF AN ACCIDEN 06/27/86 H53353 H55953 A-19 RECOHBIttER CAPABILITY BHR HARK I H59072 A-20 10 CFR 50.62 OPERATING REACTOR REVIEHS H07881 B-01 DIESEL GENERATOR LOCKOUT A-18 TECH SPECS AFFECTED BY 50.72 AWD 50.73 (GL 83-63) 05/30/80Ci 06/18/86 12/31/86 07/15/82C
R-1208731-001 BROWNS FERRY 1
REGULATORY INFORMATION TRACKINGSYSTEM FACILITY IMPLEMENTATION (CONTINUATION)
PAGE tl0.:
36 03/31/86 TAC NO.
MPA M08208 B-05 STRESS CORROSION CRACKING BWR RCSPB M<)6652 B-05 STRESS CORROSION CRACKING BWR RCSPB M10291 B-20 COtlTAINMENT LEAKAGE DUE TO SEAL DETERIORATION M08183 B-06 BWR RELIEF VALVE M12119 B-16 EMERGEtlCY PLANNING AtlD REVISIOtlS M08726 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS LIC ACT
~COMP L ET 10/22/79C 06/15/8IC 07/12/79C 06/01/81C 05/20/82C 03/26/80C LICEtlSEE STATUS DATE M10356 B-21 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF AtltlUNCIA 02/09/82C M08720 B-22 TECH SPEC SURVEILLANCE REQUIREMEttTS FOR MECHANICAL 05/26/82C M10010 B-23 DEGRADED GRID VOLTAGE 09/03/81C M10187 B-26 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 12/10/81C M%2568 B-26 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 07/01/85C M08635 B"25 BWR FEEDWATER NOZZLE CRACKING 06/06/8IC M10876 M52392 B-01 FIRE PROTECTION - FINAL TECH SPECS (ItlCLUDES SER S
06/18/8<iC B-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 08/22/79C M%8136 B-l1 FIRE PROTECTION - FItlAL TECH SPECS (INCLUDES SER S
10/12/83C M11813 B-02 TMI FOLLOW UP ALL PLANTS M11977 B-62 TMI FOLLOW UP ALL PLANTS M30158 M30159 B-II LESSONS LEARNED IMPLEMEtlTATION B-64 LESSOtlS LEARNED IMPLEMENTATIOtl M30160 B-6l LESSOtlS LEARNED IMPLEMENTATION M30161 B-I0 LESSONS LEARtlED IMPLEMENTATION M30162 B-66 LESSOtlS LEARNED IMPLEMENTATION M30156 B-CII LESSONS LEARNED IMPLEMENTATION 02/29/80C 1Z/27/79C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C
R-1208731-001 BROWt)S FERRY 1
REGULATORY INFORHATION TRACKING SYSTEH FACIL ITY IMP L EHENTATI ON (CONTINUATION)
PAGE NO.
~
37 03/."1/86 TAC tl0.
MPA H30163 B-%II LESSOttS LEARNED IHPLEHEt1TATIOt<
H30160 B-I6 LESSONS LEARNED IMPLEMENTATION H30165 B-III LESSONS LEARNED IHPLEHEt)TATIOH H30166 B-%II LESSONS LEARNED IHPLEHENTATION M30167 B-II'I LESSONS LEARNED IMPLEMENTATION H30168 B-I6 LESSONS LEARNED IMPLEMENTATION LIC ACT
~COMP T
03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C LICENSEE STATUS DATE H12891 B-iI5 HASH 1IIOO EVEt1T V, "PRIMARY COOLANT SYSTEM PRESSUR 08/08/80C M%2073 B-II6 ANALYSIS OF TURBINE DISC CRACKS 05/15/80C H1310I'I B-68 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 09/03/81C M%2230 B-58 SDV CAPABILITY HII3171 B-58 SDV CAPABILITY H510't2 B-58 SDV CAPABILITY MII2873 B-59 HASOt>RY WALL DESIGN H42II81 B-60 ENVIROt)MENTAL QUALIFICATION H6265II B-61 LOSS OF NON CLASS IE I&C POWER H4272ci B-62 ESF RESET CONTROL DESIGN DEFICIENCY M%3508 B-63 INTERIM PROCEDURES FOR SHORT TERN BLACKOUT 01/09/81C 05/19/82C 06/2II/83C 06/27/8IIC 08/08/85C 07/28/82C 09/06/83C 12/'02/81C M%3727 B-65 SAFETY CONCERNS ASSOCIATED WITH PIPE BREAKS IN BWR 01/07/86C HII6599 B-70 FATIGUE TRANSIENT LIMIT TS H51669 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 05/25/82C 10/26/8cIC H52739 B-76 ITEN 1.1 - POST TRIP REVIEW; PROGRAM DESCRIPTION 06/17/85C H52820 H52901 B-77 ITEM 2.1 EQUIPMENT CLASSIFICATION & VENDOR INTER 03/28/86 B-78 ITEMS 3.1.1
& 3.1.2
-POST MAINTENANCE TEST PROCEDU 07/25/86
R-1208731-001 BROWthS FERRY 1
REGULATORY INFORMATION TRACKINGSYSTEM FACI L ITY IMPLEMENTATION (CONTINUATION)
PAGE tt0.:
38 03/31/86 TAC NO.
MPA LIC ACT C~ONPL TE LICENSEE STATUS DATE M52982 B"79 ITEM 3.1.3 - POST MAINTENANCE TESTING CHANGES TO 07/25/86 M5<i518 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-M53571 B-85 SALEM ATWS 1.2 DATA CAPABILITY M53650 B"86 SALEM ATWS Z.2 S-R COMPONENTS M55590 B-80 INSPECTIONS OF BWR STAINLESS STEEL PIPING ACCORDIN 10/26/86C
'5f) 4
.~/86 0-06/12/85C 05/09/86 M53737 t153820 M56007 B-87 SALEM ATWS 3.Z.1 8 3.2.2 S-R COMPOttENTS B-88 SALEM ATWS 3.2.3 T.S.
S-R COMPONENTS B-92 SALEM ATWS 4.5.1 DIVERSE TRIP FEATURES 1 2/31/86 08/15/86 "
p.
01&34/$7.
M08260 C-02 BWR-RECIRC.
PUMP TRIP (ATWS)
M53966 B-93 SALEM ATWS 4.5.2 8 6.5.3 TEST ALTERNATIVES 11/12/86 w
08/20/79C M07970 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 06/06/80C M11627 C-11 RPS POWER SUPPLY 06/01/81C M52210 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOWUP OF MPA 06/Z8/85C M07929 D-01 GE MARK I CONTAINMENT EVALUATION LONG TERM M10070 D-11 FISSION GAS RELEASE M08714 D-1'EACTOR VESSEL WELD WIRE DEFICIENCY 05/06/85C 03/01/80C 11/14/79C M12295 D-15 HIGH ENERGY LINE BREAK 8 CONSEQUENTIAL SYSTEM FAIL 02/01/84C M13271 M13166 D-17 DEFINITION OF OPERABLE D-16 REVIEW OF CORPORATE MANAGEMENT CAPABILITY 02/22/82C 02/06/81C M55800 M57146 M07216 M08003 D-20 E-01 E-03 MARK I DRYWELL VACUUM BREAKERS LICENSEE RESPONSE
. ~
SPENT FUEL POOL EXPANSIONS CORE RELOADS REQUIRING PRIOR NRC APPROVAL D-19 DIESEL GENERATOR RELIABILITYTECH SPECS (GL 84-15) 12/31/'85C 06/'07/86 06/01/81 C 02/08/79C
R-1208731-001 BROWNS FERRY 1
REGULATORY INFORNAT ION TRACKING SYSTEN FACILITY INPLENENTATION (CONTINUATION)
PAGE NO.:
39 03/31/86 TAC tt0.
MPA M%8131 ME'E<i00E'E E-06 BIIR SINGLE LOOP OPERATION F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR M%6072 F-02 I.A.1.3 SHIFT NAttWING F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINIWG LIC ACT
~COEPL TE 01/30/87 "
01/15/82C 02/28/8IC 10/12/83C LICENSEE
~DAT NE'E6214 F-06 I.C.1.2/3.A ENERGEttCY OPERATING PROCEDURES GEttERIC 02/'07/86C NE17269 N51 1E13 M51223 F-07 F-08 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI I.D.1
~ 1 DETAILED CONTROL ROON DESIGN REVIEW PROGRA F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM NOE1355 F-10 II.B.1 RCS HIGH POINT VEttTS M%7921 F-11 II.B.Z PLANT SHIELDING N44623 F-12 II.B.3 POST ACCIDENT SAMPLING MOIEE93 F-13 II.B.6 TRAINING FOR MITIGATING CORE DAMAGE N04564 F-14 II.D.1 RV AND SV TRAINING NIEt761 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION M%6832 F-19 II.E.I.Z CONTAINMENT ISOLATION DEPENDABILITY M%0903 F-20 II.F.1
~ 1 NOBLE GAS MONITOR N66976 N650EE5 f-21 I I. F. 1. 2 IODIttE/PARTICULATE SANPL IttG F-22 II.F.1.3 CONTAINMENT HIGH RAttGE MONITOR N47582 F-23 II.F.1.0 COttTAINMENT PRESSURE INSTRUMENT NE'E7653 NEE7726 F-ZEt II. F. 1. 5 F-25 II.F.1.6 CONTAINMENT WATER LEVEL INSTRUMENT CONTAINMENT HYDROGEN MONITOR ME'EE'E28Et F-05 I.C. 1.2/'3. B PROCEDURES GENERATION PACKAGES (NUREG NEE7197 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 12/31/86 12/08/81C 12/08/81C 00/30/87 "
07/ZCII 87 07/30/82C 03/08/83C 05/30/86 10/12/83C 08/31/83C 12/22/81C 07/01/85C 12/22/81C 12/'22/81C 01/08/82C 06/16/83C 06/16/83C 06/16/83C
R-1208731-001 BROWt(S FERRY 1
REGULATORY INFORMATION TRACKING SYSTEM FACIL ITY IMP L EMEttTAT I ON (CONTINUATION)
PAGE No.i 4io 03/31/86 TAC NO.
MPA T T E
LIC ACT
~CONPL ET LICENSEE STATUS
~DAT M45116 F-26 II. F. 2 INSTRUMENTS FOR DETECTION ON INADEQUATE 04/18/86 M45325 M45532 M4i5560 F-38 F-43 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/31/82C II.K.3.13 HPCI AND RCIC INITIATION LEVELS 09/19/83C F-45 II.K.3.15 ISOLATION OF HCPI AND RCIC MODIFICATIOtt 06/30/82C M45584 F-46 II.K.3.16 CHALLENGES AND FAILURES OF RELIEF VALVE 11/13/84C M45611 F-4i7 II.K.3.17 ECCS OUTAGES M45680 F-48 II.K.3.18 ADS ACTUATION 08/24/83C 03/14/86
~
M45704 F-49 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 07/23/81C M45728 F-50 II.K.3.21 RESTART OF CSS AttD LPCI M47849 F-51 II.K.3.22 RCIC SUCTION 10/26/82C 07/27/84C M46714 F-52 II.K.3.24 SPACE COOLING FOR HPCI/RCIC MODIFICATIO 11/10/82C M45752 F-53 II.K.3.25 POWER ON PUMP SEALS M45807 F-57 II.K.3.30 SB LOCA METHODS M4i8148 F-58 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46 M45776 F-54 II.K.3.27 COMMON REFERENCE LEVEL M48260 F-55 II.K.3.28 QUALIFICATION OF ADS ACCUMULATORS 01/20/83C 12/30/82C 07/24/85C 12/28/83C 12/28/83C M45876 F-59 II.K.3.44 ANTICIPATED TRANSIENTS WITH SINGLE FAIL 12/29/81C M45900 F-60 II. K.3. 45 MANUAL DEPRESSURIZAT ION M45927 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 05/18/83C 06r30r87-M45998 M4i6070 F-64i III.A.1.2 OPERATIONAL SUPPORT CENTER F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 06/30/87 "
06/30/87 M4i614i2 F-66 III.A.1.2 NUCLEAR DATA LINK M46214 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 07/30r82C 03/18/83C
R-1208731-001 BROWNS FERRY 1
REGULATORY INFORMAT ION TRACKINGSYSTEM FAG I L ITY IMP L EMENTATI ON (CONTINUATION)
PAGE NO.:
61 03/31/86 TAC NO.
~PA ME16286 F-68 TITL III.A.2.2 METEOROLOGICAL DATA UPGRADE LIC ACT
~COMP ET 06/30/87 LICENSEE
~DAT ME16357 F-69 III.D.3.3 IMPLANT RADIATION MONITORING M%6628 F"70 III.D.3.6 CONTROL ROOM HABITABILITY M56106 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO 02/22/82C 08/30/82C OE1/30/87
R-1208731-001 REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMPLEMENTATION PAGE tt0. '42 03/31/86 FACILITY: BROWttS FERRY 2 PLAttT LOCATIOtt-'10 MI NW OF DECATUR> ALA DOCKET ttUMBER'-
050-00260 ARCH/ENGINEER:
J.
PAULK LICENSED POWER:
3293 MWT DESIGN POWER-1065 MWE NSSS VEttDOR:
GE PROJECT MANAGER-'R.
CLARK BRANCH CHIEF:
D.
MULLER LIC. ASSISTANT:
S.
NORRIS TAC NO.
MPA tt M08328 A-01 10 CFR 50.55 A(G)
ISI M08136 A-02 APPENDIX I - ALARA M07490 A-03 SECURITY REVIEWS-MODIFIED AMENDMENT PLAttS M08022 A-03 SECURITY REVIEWS-MODIFIED AMENDMENT PLANS M08716 M07911 A-00 A"05 "APPENDIX J - CONTAINMENT LEAK TESTING GE MARK I CONTAINMENT TECH SPECS-SHORT TERM M10666 A-10 COttTINGENCY PLANNING M10656 A-11 GUARD TRAINING PLANS Mt oc460 A-12 VITAL AREA ANALYSIS M11325 A-16 10CFR 50.55 A(G) INSERVICE TESTING M08561 A-06 RESPIRATORY PROTECTION SYSTEM M08628 A-08 ECCS EVALUATION-GENERIC PER 50.66 COMPLIANCE M11363 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE LIC ACT
~CONPLET 08/30/83C 06/16/86 01/01/70C 02/23/79C 1 0/Zl/86C 1 2/08/78C 10/11/79C 05/11/79C 02/06/81C 06/18/81C 06/15/81C 06/12/82C 06/20/86 LICENSEE STATUS DATE M%3873 A-16 QUALIFICATIONS OF EXAMINATIONi INSPECTIONi TESTING 03/17/82C M51076 A-17 IttSTRUMEttTATION TO FOLLOW THE 'COURSE OF AN ACCIDEN 06/27/86 <
M53354 M55956 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-03)
A-19 RECOMBINER CAPABILITY BWR MARK I 05/30/84C 06/18/86 M07885 B-01 DIESEL GENERATOR LOCKOUT M08209 B-05 STRESS CORROSION CRACKING -
BWR RCSPB M59073 A-20 10 CFR 50.62 OPERATING REACTOR REVIEWS 12/31/86 "
07/'15/82C 10/22/79C
R-1208731-001 BROHWS FERRY 2 REGULATORY INFORMAT I ON TRACKINGSYSTEM FAG I L IT Y IMP L EMENTAT I ON (CONTINUATION)
PAGE NO.-
43 03/31/86 TAC NO.
MPA M46653 B-05 STRESS CORROSION CRACKING BNR RCSPB M08184 B-06 BIIR RELIEF VALVE M12120 B-16 EMERGENCY PLANNING AND REVISIOtlS M08727 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SWUBBERS M10292 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION LIC ACT
~CONPLET 06/15/84C 07/12/79C 04/01/81C 05/24/82C 03/26/80C LICENSEE STATUS
~DAT M10353 B-21 LOSS OF 125-V DC BUS VOLTAGE NITH LOSS OF ANWUNCIA 02/09/82C M08721 B-22 TECH SPEC SURVEILLAtlCE REQUIREMENTS FOR MECHANICAL 05/24/82C M10011 B-23 DEGRADED GRID VOLTAGE 09/03/81C M10186 B-24 VEtlTItlG AND PURGING CONTAINMEtlTS IIHILE AT FULL POll 12/14/81C M11814 B-24 VENTING AND PURGING CONTAINMEtlTS HHILE AT FULL POW 02/24/80C M42569 B-24 VEtlTING AND PURGING CONTAItlMEtlTS WHILE AT FULL POW 07/01/85C M08436 M10875 B-25 B-27 BHR FEEDHATER NOZZLE CRACKING REVIEH RESPONSES TO IE BULLETIN 78"03 (OFFGAS EXPL 06/06/84C 08/22/79C M52393 B-41 FIRE PROTECTION FINAL TECH SPECS (INCLUDES SER S
06/18/84C M48135 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S
10/12/83C M30170 B-44 LESSONS LEARNED IMPLEMENTATION M30172 B-44 LESSONS LEARNED IMPLEMENTATION M30173 B-44 LESSONS LEARNED IMPLEMENTATION M30174 B-44 LESSONS LEARNED IMPLEMENTATION M30175 B-44 LESSONS LEARNED IMPLEMENTATION M30176 B-44 1.ESSONS LEARNED IMPLEMENTATION M30177 B-44 LESSONS LEARNED IMPLEMENTATION M30178 B-44 LESSONS LEARNED IMPLEMENTATIOtl 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C
R-1208731-001 BROWtlS FERRY 2 REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMPLEMENTATION (CONTINUATION)
PAGE NO.:
03/31/86 TAC NO.
~MP H30179 B-44 LESSOtlS LEARNED IMPLEHEtlTATION M30180 B-44 LESSONS LEARNED IHPLEHEtlTATION H30181 B-44 LESSOtlS LEARNED IHPLEHENTATIOtl H30182 B-44 LESSONS LEARNED IHPLEHENTATIOtl LIC ACT COMPLETE 03/26/80C 03/26/80C 03/26/80C 03/26/80C LICENSEE STATUS
~DAT B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTIOtl VOLTAGE 09/03/81C H13105 H42231 B-58 SDV CAPABILITY B-58 SDV CAPABILITY 05/19/82C 05/19/82C 06/24/83C 06/27/84C 08/08/85C 07/'28/82C 09/06/83C 12/02/81C H43172 H51013 B-58 SDV CAPABILITY M42874 B-59 MASONRY WALL DESIGN H42482 B-60 EtlVIRONHENTAL QUALIFICATION M42655 B-61 LOSS OF NON CLASS IE ISC POWER H42725 B-62 ESF RESET CONTROL DESIGN DEFICIENCY M43509 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT H43731 B-65 SAFETY CONCERNS ASSOCIATED WITH PIPE BREAKS IN BWR 01/07/86C H1 2892 B 45 HASH 1 400 EVENT Vp PRIMARY COOLANT SYSTEM PRESSUR 08/08/80C M46600 B-70 FATIGUE TRANSIENT LIMIT TS H51670 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 05/25/82C 10/26/84C H52740 H52821 H52902 B-76 ITEM 1.1 POST TRIP REVIEWS PROGRAM DESCRIPTIOtl 8 06/17/85C B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION 8 VENDOR INTER 03/28/86
'"78 ITEMS 3.1.1 8 3.1.2
-POST HAINTEtlANCE TEST PROCEDU 02/14/86
~
H52983 H54519 M55591 B-79 B-83 B-84 ITEN 3.1.3 POST HAINTEtlAtlCE TESTING CHAttGES TO
(
TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-INSPECTIONS OF BWR STAItlLESS STEEL PIPItlG ACCORDIN 07/30/86 10/26/84C
~l.(.
04/28/86 ~
R-1208731-001 BROWNS FERRY 2 REGULATORY INFORMATIONTRACKItlGSYSTEM FACILITY IMPLEMENTATION (CONTINUATION)
PAGE NO.-
65 03/31/86 TAC NO.
MPA W
M53572 B"85 SALEM ATWS 1.2 DATA CAPABILITY M53655 M53738 M53821 B-86 SALEM ATWS 2.2 S-R COMPONEtlTS B-87 SALEM ATWS 3.2.1 8 3.2.2 S-R COMPOtlEtlTS B-88 SALEM ATWS 3.2.3 T.S.
S-R COMPOtlENTS M08261 C-02 BWR-RECIRC.
PUMP TRIP (ATWS)
M56068 B-92 SALEM ATWS l.5.1 DIVERSE TRIP FEATURES M53965 B-93 SALEM ATWS 4.5.2 8 0.5.3 TEST ALTERtlATIVES LIC ACT
~CO NPL ET 06/12/85C 05/09/86 12/31/86 +
08/15/86 1144/86
('1/12/86 08/20/79C LICENSEE
~DAT M07975 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 06/06/86C M08930 C-11 RPS POWER SUPPLY 06/27/85C M52211 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOWUP OF MPA 06/28/85C M07930 D-01 GE MARK I CONTAINMENT EVALUATION LONG TERM M10075 D-11 FISSION GAS RELEASE 05/06/85C 03/01/80C M12296 D-15 HIGH ENERGY LINE BREAK 8 COtlSEQUENTIAL SYSTEM FAIL 02/01/86C M13272 D-16 REVIEW OF CORPORATE MANAGEMENT CAPABILITY M13165 D-17 DEFINITION OF OPERABLE 02/22/82C 02/06/81C M55841 D-19 DIESEL GENERATOR RELIABILITYTECH SPECS (GL 8I-15) 12/31/85C M57165 D-20 MARK I DRYWELL VACUUM BREAKERS LICEtlSEE RESPOtlSE 06/07/86 M08626 E-01 SPENT FUEL POOL EXPANSIONS M%8132 E-01 BWR SINGLE LOOP OPERATION F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR M%0005 M%6073 F-02
- MI6166, F-03 F-04 M%6215 I.A.1.3 SHIFT MANNING I.A.2.1 UPGRADING OF RO AND SRO TRAINING I. C. 1. 2/3. A EMERGENCY OPERATING PROCEDURES GENERIC 06/01/81 C 01/30/87 01/15/82C 02/28/80C 10/12/83C 06/07/8cic
R-1208731-001 BROHttS FERRY 2 REGULATORY INFORMATION TRACKINGSYSTEM FACI LITY IMPLEMENTATIOt)
(CottTINUATION)
PAGE tt0.:
66 03/31/86 TAC NO.
MPA TIT E LIC ACT
~COMP L ET LICEttSEE STATUS DATE M%6285 F-05 I.C.1.2/3.B PROCEDURES GENERATIOtt PACKAGES (NUREG M%7198 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 12/31/86 "
1 2/08/81 C M%7270 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATIttG ACTIVITI 12/08/81C M51166 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA 06/30/87 M51226 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM M%0356 F-10 II.B.1 RCS HIGH POINT VENTS MII904 F-20 II.F.1.1 NOBLE GAS MONITOR M%6975 F-21 I I. F. 1. 2 IODINE/PARTICULATE SAMPLING M% 066 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR M%7583 F-23 II.F.1.6 CONTAINMENT PRESSURE INSTRUMENT M%7656 F-21 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT M%7725 F-25 II.F.1.6 CONTAINMENT HYDROGEN MOttITOR M%7922 F"11 II.B.2 PLANT SHIELDING M44426 F-12 II.B.3 POST ACCIDENT SAMPLING M66496 F-13 II.B.I TRAINING FOR MITIGATING CORE DAMAGE M%4565 F-14 II.D.1 RV AND SV TRAIttING M%6762 F-18 II.E.4.1 DEDICATED HYDROGEN PEttETRATION M06833 F-19 II.E.0.2 CONTAINMENT ISOLATION DEPENDABILITY 07/24/86 07/30/82C 03/08/83C 05/30/86 10/12/83C 08/31/83C 12/22/81C 07/01/85C 12/22/81C 12/22/81C 01/08/82C 06/16/83C 06/16/83C 06/16/83C
&5117 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON IttADEQUATE 04/18/86
'45326 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/31/82C M05533 F"63 II.K.3.13 HPCI AND RCIC INITIATION LEVELS 09/19/83C M%5561 M%5585 F-66 II.K.3.15 II.K.3.16 ISOLATION OF HCPI AND RCIC MODIFICATION '6/30/82C CHALLENGES AND FAILURES OF RELIEF VALVE 11/13/8IC
R-1208731-001 BROWNS FERRY 2 REGULATORY I NFORNATI ON TRACKINGSYSTEM FACILITY INPLEMENTATIOtt (COIITINUATION)
PAGE NO.:
TI7 03/31/86 TAC NO.
MA5612 MTI5681 NPA F-67 II.K.3.17 ECCS OUTAGES F-(is II. K.3. 18 ADS ACTUATION LIC ACT
~COOPT T
08/26/83C 03/10/86
'ICENSEE STATUS
~DAT M%5705 F-69 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 07/23/81C M%7850 F-51 II.K.3.22 RCIC SUCTION M%5729 F-50 II.K.3.21 RESTART OF CSS AtID LPCI 10/26/82C 07/27/80C Nii6715 F-52 II.K.3. 24 SPACE COOLING FOR HPCI/RCIC MODIFICATI0 11r10r82C W5753 F-53 II.K.3.25 POWER ON PUMP SEALS M%5777 F-54 II.K.3.27 CONNON REFERENCE LEVEL M%8261 F-55 II.K.3.28 QUALIFICATION OF ADS ACCUMULATORS M%5808 F-57 II.K.3.30 SB LOCA METHODS M%8109 F-58 II.K.3.31 CONPLIANCE WITH 10 CFR 50.66 01/20/83C 12/30/82C 07/24/85C 12/28/83C 12/28/83C M%5877 F-59 II.K.3.06 ANTICIPATED TRANSIENTS WITH SINGLE FAIL 12/29/81C M%5901 F-60 II.K.3.65 NANUAL DEPRESSURIZATION NI5928 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER Mc45999 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER M%6071 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY M%6287 M%6358 M%6429 N56105 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE F-69 III.D.3.3 IMPLANT RADIATION MONITORING F-70 III. D. 3. Ej CONTROL ROOM HABITABILITY F-7 1 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO M%61%3 F-66 III.A.1.2 NUCLEAR DATA LINK M%6215 F-67 III.A.2.1 EMERGENCY PLAtt UPGRADE TO NEET RULE 05/18/83C 06/30/87 06/30/87 06/30/87 07/30/82C 03/18/83C 06r30/87 ~
02/22/82C 08/30/82C OV/30/87
R-1208731-001 REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMP L EHEttTATI ON PAGE NO.:
II8 03/31/86 FACILITY: BRONtlS FERRY 3 PLANT LOCATIOt<I 10 HI NH OF DECATURP ALA DOCKET NUMBER:
050-00296 ARCH/EttGINEERI TVA IE INSPECTOR:
J.
PAULK LICEttSED PONERI 3293 MNT DESIGN PONER:
1065 HHE NSSS VENDOR:
GE PROJECT MANAGER: R.
CLARK BRANCH CHIEF:
D.
HULLER LIC. ASSISTANT:
S.
MPA LIC ACT
~COMP ETE LICENSEE STATUS DATE H06867 A-01 10 CFR 50.55 A(G) ISI 08/30/83C 0 II/1 EI/86 02/23/79C 07/27/8IIC 12/08/78C 10/11/79C 05/11/79C 12/07/79C 02/06/81C 06/18/81C 06/15/81C OII/12/82C 06/20/86 H08135 A-02 APPENDIX I - ALARA MOSEI23 H08717 H07912 H08562 A-03 SECURITY REVIEWS-MODIFIED AMENDMENT PLANS A-OEI APPENDIX J - CONTAINMENT LEAK TESTING A-05 GE HARK I CONTAINMENT TECH SPECS-SHORT TERM A-06 RESPIRATORY PROTECTION SYSTEM A-08 ECCS EVALUATION-GENERIC PER 50. CI6 COMPLIANCE A-08 ECCS EVALUATION-GENERIC PER 50.66 COMPLIANCE A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE A-10 CONTINGENCY PLANNING A"11 GUARD TRAINING PLANS A-12 VITAL AREA ANALYSIS A-1I'I 10CFR 50.55 A(G) - INSERVICE TESTING M08I'I29 H12236 H11362 H10EI65 M1 OEI57 H1 OII61 M11326 M%38?EI H51075 H53355 H55955 A-19 RECOHBINER CAPABILITY BHR HARK I 0 II/18/86 12/31/86 07/15/82C 10/22/79C M59 07 E'I M07886 A-20 10 CFR 50.62 OPERATING REACTOR REVIEHS B-01 DIESEL GENERATOR LOCKOUT H08210 B-05 STRESS CORROSION CRACKING BHR RCSPB A 16 QUALIFICATIONS OF EXAHINATIONP INSPECTIONP TESTING 03/17/82C A-17 IttSTRUMEttTATION TO FOLLOH THE COURSE OF AN ACCIDEti 06/27/86
'"18 TECH. SPECS AFFECTED BY 50.72 AttD 50.?3 (GL 83-43) 05/30/8iIC
R-1208731-001 BROWNS FERRY 3 REGULATORY INFORMATION TRACKINGSYSTEM FAG I L ITY IMP L EMENTATI ON (CONTINUATION)
PAGE NO.-
69 03/31/86 TAC NO.
MPA TIT E LIC ACT COMPLETE LICENSEE STATUS
~OAT M%6654 B-05 STRESS CORROSION CRACKING BWR RCSPB M08185 M12121 B-06 B-16 BWR RELIEF VALVE EMERGEttCY PLANNIttG AND REVISIOttS M08728 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS M10293 B-20 COttTAIttMENT LEAKAGE DUE TO SEAL DETERIORATION 06/15/84C 07/12/79C 06/01/81C 05/26/82C 03r26/80C M10355 B-21 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF At<ttUttCIA 02/09/82C M08722 B-22 TECH SPEC SURVEILLANCE REQUIREMEttTS FOR MECHAttICAL 05/20/82C M10012 B-23 DEGRADED GRID VOLTAGE 03/29/82C M10185 B"24 VENTING AttD PURGING COttTAINMENTS WHILE AT FULL POW 12/16/81C M42570 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 07/01/85C M08637 B-25 BWR FEEDWATER NOZZLE CRACKIttG 06/06/86C M10876 B-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 08/'22/79C M52396 B-01 FIRE PROTECTION - FINAL TECH SPECS (IttCLUDES SER S
06/18/86C M%8136 B-41 FIRE PROTECTION FINAL TECH SPECS (INCLUDES SER S
10/12/83C M30189 B-44 LESSONS LEARNED IMPLEMENTATION M30190 B-I6 LESSONS LEARNED IMPLEMENTATION M30191 B-66 LESSONS LEARNED IMPLEMENTATION M30192 B-I6 LESSONS LEARNED IMPLEMENTATION M11815 B-42 TMI FOLLOW UP ALL PLANTS M301 80 B-06 LESSONS LEARNED IMPLEMENTATION M30186 B-I0 LESSONS LEARNED IMPLEMENTATION M30187 B-66 LESSONS LEARNED IMPLEMENTATION M30188 B-64 LESSONS LEARNED IMPLEMEttTATION 02/29/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C 03/26/80C
R-1208731-001 BRONNS FERRY 3 (CONTINUATION)
FAG I L I TY IMP L EMENTAT I ON T
REGULATORY INFORMATION TRACKINGSYSTEM PAGE NO.'50 03/31/86 TAC NO.
MPA TIT E M30193 B"44 LESSONS LEARNED IMPLEMENTATION M30194 M30195 LESSONS LEARNED IMPLEMENTATION LESSONS LEARNED IMPLEMENTATION M30196 B-II LESSONS LEARNED IMPLEMENTATIOtt LIC ACT
~CONPLET 03/26/80C 03r26/80C 03/26/80C 03/26/80C LICENSEE STATUS
~OAT Mt 2893 B-65 HASH 1400 EVENT Vp "PRIMARY COOLAttT SYSTEM PRESSUR 08/08/80C M13106 B-/o8 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 03/29/82C M%223?
B-58 SDV CAPABILITY MTE3173 B-58 SDV CAPABILITY M51010 B-58 SDV CAPABILITY M%2875 B-59 MASONRY HALL DESIGN M%2683 B-60 EttVIRONMEtiTAL QUALIFICATION M%2656 B-61 LOSS OF NON CLASS IE ISC PONER tlTi2726 B-62 ESF RESET CONTROL DESIGN DEFICIENCY M43510 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT 11/'15/83C 05/19/82C 06/24/83C 06/27/8IC 08/08/85C 07/28/82C 09/06/83C 12/02/81C M%3736 B-65 SAFETY CONCERNS ASSOCIATED WITH PIPE BREAKS IN BHR 01/07/86C M%6601 B-7 0 FATIGUE TRANSIENT LIMIT TS M51671 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 05/25/82C 1 0/26/8IC M52761 M52822 M52903 B-76 ITEM 1.1 - POST TRIP REVIEHP'ROGRAM DESCRIPTION 8 06/17/85C B"77 ITEM 2.1 EQUIPMENT CLASSIFICATION 8 VENDOR IttTER 03r28/86 B-78 ITEMS 3.1.1 8 3.1.2
-POST MAINTENANCE TEST PROCEDU 07r25r86 M52984 M5<i520 M55592 B-7 9 B-83 B-86 ITEM 3.1.3 - POST MAINTEttANCE TESTIttG CHANGES TO TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-INSPECTIONS OF BHR STAINLESS STEEL PIPING ACCORDIN 07/30/86 10/26/80C
R-1208731-001 BROWNS FERRY 3 REGULATORY INFORMAT ION TRACKINGSYSTEM FACILITY IMPLEMENTATION (CONTINUATION)
RAGE No.i 51 03/31/86 TAC NO.
MPA M53573 B-85 SALEM ATWS 1.2 DATA CAPABILITY M53656 M53739 B-86 SALEM ATWS 2.2 S-R COMPONENTS B-87 SALEM ATWS 3.2.1 8 3.2.2 S-R COMPONENTS M53822 B-88 SALEM ATWS 3.2.3 T.S.
S-R COMPOttENTS M54049 B-92 SALEM ATWS 4.5.1 DIVERSE TRIP FEATURES M53966 B-93 SALEM ATWS 4.5.2 8 4.5.3 TEST ALTERNATIVES M08262 C-02 BWR-RECIRC.
PUMP TRIP (ATWS)
LIC ACT
~CONPL T
06/12/85C 05/09/86'2/31/86 08r15/86
~1/8k ('=
11/12/86 ~
08/20/79C LICEtiSEE STATUS
~DAT M08438 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 06/06/8i'iC M08931 C-11 RPS POWER SUPPLY 06/27/85C M52212 C-15 CONTROL OF HEAVY LOADS PHASE II (FOLLOWUP OF MPA 06r28r85C M0793'1 D-01 GE MARK I CONTAINMENT EVALUATION LONG TERM M10076 D-11 FISSION GAS RELEASE 05/06/85C 03/01/80C M12297 D-15 HIGH ENERGY LINE BREAK 8 COttSEQUENTIAL SYSTEM FAIL 02/01/84C M13273 D-16 REVIEW OF CORPORATE MANAGEMENT CAPABILITY M13166 D-17 DEFINITION OF OPERABLE M55862 D-19 DIESEL GENERATOR RELIABILITYTECH SPECS (GL Bci-15)
M57166 D"20 MARK I DRYWELL VACUUM BREAKERS LICENSEE
RESPONSE
M08i427 E-01 SPENT FUEL POOL EXPANSIONS M08026 E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL Mi'i8133 E-06 BWR SINGLE LOOP OPERATION MciCI006 F-01 I. A. 1. 1 SHIFT TECHNICAL ADVISOR Mii6074 F-02 I.A:1.3 SHIFT MANNING M40165 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 02/22/82C 02/06/81C 12/31/85C 06/07/86 06/01/81 C 03/14/79C 01/30/87 01/15/82C 02/28/84C 10/12/83C
R-1208731-001 BROWNS FERRY 3 REGULATORY INFORMATION TRACKING SYSTEM FACIL ITY IMPL EMENTATION (CONTINUATION)
PAGE NO.:
52 03/31/86 TAC NO.
M%4216 MPA TITLE LIC ACT
~CONP T
F"01 I.C.1.2/3.A EMERGENCY OPERATIttG PROCEDURES GENERIC 06/07/8IC LICENSEE STATUS
~DAT M%4286 F-05 I.C.1.2/3.B PROCEDURES GEttERATION PACKAGES (NUREG M%7199 F"06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 12/31/86 '
2/08/81 C M%7271 M51145 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRA 12/08/8'IC 06/30/87 M51225 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM MA%357 M%7923 F-10 II.B.1 RCS HIGH POINT VEttTS F-11 II.B.2 PLANT SHIELDING M44905 M%6976 F-20 II.F.1.1 F-21 II.F.1.2 NOBLE GAS MONITOR IODINE/PARTICULATE SAMPLIttG M%5047 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MOttITOR M%7586 F-23 II.F.1.0 CONTAINMENT PRESSURE INSTRUMENT M%7655 F-26 II.F.1.5 CONTAINMENT WATER LEVEL INSTRUMENT M64025 F-12 II.B.3
.POST ACCIDENT SAMPLItlG MGIA95 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE M%6566 F-16 II.D.1 RV AND SV TRAINING M%4763 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION M64830 F-19 II.E.6.2 CONTAIttMENT ISOLATIOtt DEPENDABILITY 07/26/87 07/30/82C 03/08/83C 05/30/86 10/12/83C 08/31/83C 12/22/81C 07/01/85C 12/22/81C 12/22/81C 01/08/82C 06/16/83C 06/'16/83C M07726 M%5118 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 06/1 6/83C /
00/18/86 M%5327 F-38 II.K.3.3 REPORTIttG SV AND RV FAILURES AttD CHALLE 03/31/82C M%5534 F-03 II.K.3.13 HPCI AND RCIC INITIATIOtt LEVELS 09/19/83C Wi5562 F-15 II.K.3.15 ISOLATION OF HCPI AttD RCIC MODIFICATION 06/30/82C
R-1208731-001 BROWNS FERRY REGULATORY INFORMATION TRACKING SYSTEM FAG I L I TY IMP L EMENTATI ON (CONTINUATION)
PAGE NO.i 53 03/31/86 TAC NO.
~PA TITLE LIC ACT
~COMP ET LICENSEE STATUS
~DAT M%5586 F-66 II.K.3.16 CHALLEttGES AND FAILURES OF RELIEF VALVE 11/13/86C M<i5682 F-68 II.K.3.18 ADS ACTUATION Mii5613 F-Ti7 II.K.3.17 ECCS OUTAGES 08/2TO/83C 03/14/86 Mii5706 F"oi9 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 07/23/81C M<i7851 F-51 II.K.3.22 RCIC SUCTION M%5730 F-50 II.K.3.21 RESTART OF CSS AND LPCI 10/26/82C 07/27/80C W6716 F-52 II.K.3.26 SPACE COOLIttG FOR HPCI/RCIC MODIFICATIO 11/10/82C M%5756 F-53 II.K.3.25 POWER ON PUMP SEALS M%5778 F-5I II.K.3.27 COMMON REFERENCE LEVEL M48262 F-55 II.K.3.28 QUALIFICATION OF ADS ACCUMULATORS M%5809 F-57 II.K.3.30 SB LOCA METHODS MT18150 F-58 II.K.3.31 COMPLIANCE'WITH 10 CFR 50.oi6 01/20/83C 12/30/82C 07/20/85C 12/28/83C 12/28/83C M%5878 F"59 II.K.3.44 ANTICIPATED TRANSIENTS WITH SINGLE FAIL 12/29/81C Mii5902 F-60 II.K.3.ii5 MANUAL DEPRESSURIZATION M%5929 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER Mii6000 F-6oi III.A.1.2 OPERATIONAL SUPPORT CENTER M06072 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY MI6166 F-66 III.A.1.2 NUCLEAR DATA LINK M%6216 M%6288 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE M%6359 F-69 III.D.3.3 IMPLANT RADIATION MOttITORING Mii6Ti30 F-70 III.D.3.4 CONTROL ROOM HABITABILITY M56106 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO 05/1 8/83C oa/30/87 >
06/30/87 06/30/87 07/30/82C 03/18/83C 06/30/87 02/22/82C 08/30/8ZC 04/30/87
s ~ I R-1208731-001 REGULATORY INFORMATION TRACKINGSYSTEM FACILITY ZMPLEMENTATION PAGE NO.:
35 00/1 0/86 FACILITY: BROWNS FERRY 1
PLANT LOCATION-'10 MI NH OF DECATUR'LA DOCKET NUMBER: '50-00259 ARCH/ENGINEER-TVA IE INSPECTOR:
J.
PAULK LICENSED POWER'3293 MHT DESIGN POWER:
1065 MHE NSSS VENDOR:
GE PROJECT MANAGER: R.
CLARK BRANCH CHIEF-D.
MULLER LIC. ASSISTANT:
S.
NORRIS TAC NO.
MPA M07884 B-01 BROHNS FERRY 1 - DIESEL GENERATOR LOCKOUT M07216 E-01 BROHNS FERRY 1
SPENT FUEL POOL EXPANSION (AMEND.42)
M08318 A-01 BROHNS FERRY 1
INSERVICE INSPECTION GENERIC M07929 D-01 BROWNS FERRY 1 - MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION M60000 F-01 BROHNS FERRY 1
'UREG-0737 I.A.1.1 STA LONG TERM REQUIREMENTS M%0072 F-02 BROWNS FERRY 1
NUREG-0737 I.A.1.3.1i SNIFT MANtiIHG OVERTIME LIMITS M08133 A-02 BROHNS FERRY 1
APPENDIX "I" TECH.
SPEC.
IMPLEMENTATION REVIEW REVIEW (TECH.
SPEC. - 192)
M08260 C-02 BROWNS FERRY 1-ATHS RECIRCULATION PUMP TRIP M08003 E-03 BROHNS FERRY 1-RELOAD (AMEND 48)
M44143 F-03 BROHNS FERRY 1 - NUREG-0737 I.A.2.1.6i UPGRADING OF RO M06869 A-03 VROHNS FERRY 1 - AMENDED SECURITY PLAN (AMEND 69)
M08715 A-04 BROWNS FERRY 1 - CONTAINMENT LEAK TESTING APP.
J (GENERIC)
AttD SRO TRAINING Wi8131 E-014 BROHNS FERRY 1
SINGLE LOOP OPERATION M i l21 t F
0 i BROHNS FERRY 1
NUREG 0737 I ~ C ~ 1 2
Ap INADEQUATE CORE M60280 F-05 BROHNS FERRY 1
PROCEDURES GENERATION PACKAGE REVIEW COOLING GUIDELINES OPERATOR GUIDELINES M%6652 M07910 B-05 BROWNS FERRY 1 " IMPLEMENTATION OF NUREG-0313'EV.
1 A-05 BROWNS FERRY 1
MARK I CONTAIttMENT SHORT TERM PROG.
IMPLEM. (AMEND. 06)
M08208 B-05 BROWN FERRY 1
STRESS CORROSION CRACKING BHR RCS M08183 B-06 BROHNS FERRY 1 - BHR SAFETY/RELIEF VALUE SURVEILLANCE M08560 A-06 BROHN'S FERRY 1
RESPIRATORY PROTECTION PB GENERIC GENERIC PROGRAM (AMEND 53)
R-1208731-001 BROHNS FERRY 1
REGULATORY INFORMATION TRACKING SYSTEM FACIL ITY IMP L EMENTATI ON (CONTINUATION)
PAGE NO.:
36 04/14/86 TAC NO.
MPA M47197 F-06 BROHNS FERRY 1
FEEDBACK OF OPERATING EXPERIENCE M47269 F-07 BROHNS FERRY 1 - CORRECT PERFORMANCE OF OPERATING M06905 A-08 BROHt1S FERRY LPCI MOD. UNIT 1
(AMEND 51)
(AP I.C.5)
ACTIVITIES (API.C.6)
M51143 F-08 BROHNS FERRY 1
I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAMS PLAN F-08 M51223 F-09 BROHtfS FERRY 1
I.D.2.
SAFETY PARAMETER DISPLAY SYSTEM M11364 A-09 BROHNS FERRY 1
REACTOR VESSEL BELTLINE MATERIAL SURVEILLANCE M10463 A-10 BROHNS FERRY 1
CONTINGENCY PLAN REVIEH (AMEND 73)
M07974 C"10 BROHNS FERRY 1 -'ONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)
M44355 F-10 BROHNS FERRY 1
NUREG-0737 II.B.1, RCS HIGH POINT VENTS M47921 F-11 BROHNS FERRY 1
PLANT SHIELDING MODIFICATIONS (II.B.2.2)
M10455 A-11 BROHNS FERRY 1 - GUARD TRAINING PLAti REVIEH (AMEND 72)
M11627 C-11 BROHNS FERRY 1
M10074 D-11 BROHNS FERRY 1
HYDRO TEST PROGRAM ENHANCED FISSION PRODUCT RELEASE FOR HIGH BURNUP LHR FUEL M1 0459 A-12 BROHNS FERRY 1
VITAL AREA ANALYSIS M44423 F-12 BROWNS FERRY 1
NUREG"0737 II.B.3.2, POST ACCIDENT M44493 F-13 BROHNS FERRY 1
NUREG-0737 II.B.4.1> TRAINING FOR M44564 F-14 BROHNS FERRY 1 - RV AND SV TESTING M08714 D-14 BROWNS FERRY 1
REACTOR VESSEL ATYPICAL HELD SAMPLING MODIFICATIONS MITIGATING CORE MATERIALS (AMEND 54)
M11324 M12295 M52210 A-14 BROHNS FERRY 1 - INSERVICE TESTING D-15 BROHN'S FERRY 1
HELB At1D CONSEQUENTIAL SYSTEM FAILURE C"15 BROHNS FERRY 1 - CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPASC-10)
M13122 A-15 BROHNS FERRY DIESEL GENERATOR FUEL OIL QA M13123 A-15 BROHNS FERRY DIESEL GENERATOR FUEL OIL QA
R-1208731-001 BROHNS FERRY 1
REGULATORY INFORMATION TRACKING SYSTEM FAG I L ITY IMP L EMENTATI ON (CONTINUATION)
PAGE NO. -
37 04/14/86
~AC NO.
NPA A
M13271 M%3872 D-16 BROHNS FERRY 1
REVIEW OF CORPORATE CAPABILITIES A 16 BROWNS FERRY QUALIFICATIONS INSP P
EXAM P
TESTA AAUDIT PERSONNEL M12119 B-16 BROHNS FERRY 1 -
EMERGENCY PLAN REVIEW M08726 B"17 BROWNS FERRY 1
HYDRAULIC SNUBBERS (AMEND 86)
M51073 A-17 BROHNS FERRY 1
INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG 1.97)
M13164 D-17 BROHNS FERRY 1 - GENERIC CLARIFICATION OF "OPERABILITY" (AMEND 66)
M%4761 F-18 BROHttS FERRY 1
NUREG-0737 II.E.4.1.2P DEDICATED HYDROGEN PENETRATIONS M53353 A-18 BROHNS FERRY 1
'EPORTIttG REQUIREMENTS OF 10 CFR 50.73 (AMEND 66)
M55953 A-19 BROHNS FERRY UNIT 1
HYDROGEN CONTROL M558cio D-19 BROHNS FERRY 1
DIESEL GENERATOR RELIABILITYTECH.
WI832 F-19 BROHNS FERRY 1
NUREG-0737 II.E.O.ZP CONTAINMENT M%4903 F-20 BROHNS FERRY 1
NUREG"0737 II.F.1.1, NOBLE GAS SPECS.
(GL 84-15)
ISOLATION DEPENDABILITY MONITOR M59072 A-20 BROHNS FERRY 1
10CFR50.62 OPERATING REACTOR REVIEWS M571 Iii D 20 BROWNS FERRY 2 MARK 1
DRYWELL.VACUUM BREAKERSP LICENSEE RESPOttSE TO GENERIC LETTER 83 08 M10291 B-20 BROHNS FERRY 1
CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION M66974 F-21 BROHNS FERRY 1 - NUREG-0737 II.F.1.2, IODINE/
PARTICULATE SAMPLING M10356 B-21 BROHNS FERRY 1
M08720 B-22 BROHNS FERRY 1
LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIATOR SYSTEM MECHANICAL SNUBBERS (AMEND 80)
M%5045 F-22 BROHNS FERRY 1
NUREG-0737 II.F.1.3P CONTAINMENT HIGH RANGE MONITOR M10010 B-23 BROHNS FERRY 1 - POTENTIAL EQUIPMENT FAILURES ASSOCIATED HITHITH GRID VOLTAGE (AMEND 75)
M%7653 F-Zoi BROWNS FERRY 1
M10187 B-Zii BROHNS FERRY 1
Mi'i7582 F-23 BROHNS FERRY 1
NUREG 0737 ITEM II F1.A'i CONTAIttMENT NUREG 0737 ITEM II F1.5 CONTAINMENT
- CONTAINMENT PURGE PRESSURE INSTRUMENT WATER LEVEL MONITOR
R-1208731-001 BROWNS FERRY 1
REGULATORY INFORMATION TRACKING SYSTEM FACI L ITY IMP L EMENTATION (CONTINUATION)
PAGE NO.:
38 04/14/86 TAC tlO.
MPA M42568 B-24 BROHNS FERRY 1 -
LONG TERM REVIEH CONTAINMEttT PURGE AND M08435 B-25 BROWN FERRY 1
BWR FEEDHATER 8 CONTROL ROD DRIVE M47724 F-25 BROHNS FERRY 1
NUREG 0737 ITEM II F1.6 CONTAIttMEtlT M45116 F-26 BROHNS FERRY 1
NUREG"0737 II.F.2.3>
It/ADEQUATE CORE VENT (B-24)
NOZZLE CRACKING HYDROGEN MONITOR COOLING INSTRUMENTATION M10874 B"27 BROHNS FERRY 1
OFFGAS EXPLOSION PREVENTION REVIEW (IE BUL. 78-03)
M30159 BROHNS FERRY 1-2.2.1 A>B,C SHIFT SUPER.
RESP.,
M30160 B"44 BROHNS FERRY 1-2.1.8.C IMPROVED IODINE INST.
M45325 F-38 BROHNS FERRY 1
NUREG-0737 II.K.3.3, REPORT ON M48134 B-41 BROHNS FERRY 1 - FIRE PROTECTION APPENDIX R M52392 B-41 BROHNS FERRY 1
'PPENDIX R EXEMPTION REQUESTS M11813 B-42 BROHNS FERRY 1
THREE MILE ISLAND FOLLOW UP WORK M11977 B-42 BROHNS FERRY 1-I8E BULLETIN 79-08 M45532 F-43 BROHNS FERRY 1
NUREG-0737 II.K.3.13i HPCI AND RCIC M30156 B"44 BROHNS FERRY 1-2. 1.5 A,C DEDICATED H2 CONTROL M30158 B"44 BROWNS FERRY 1-2.2.2 AiB>C CONTROL ROOM ACCESS, RViSV FAILURES INITIATION LEVELS PENETRATIONS -8 RECOMBINER PROCEDURE TSCp OPERATIONAL SUPPPRT CENTER
- STA, TURNOVER PROCEDURES M30161 M30162 M30163 M30164 M30165 BROHNS FERRY 1-2.1.8.B HIGH RANGE RADIATION B-44 BROHNS FERRY 1-2.1.8.A POST ACCIDENT SAMPLIttG B-44 BROWNS FERRY 1-2.1.6.B SHIELDING REVIEW B"44 BROWNS FERRY 1-2.1.6.A SYSTEMS INTEGRITY FOR HIGH B-44 BROWNS FERRY 1-2.1.4 DIVERSE CONTAINMENT ISOLATION MONITORS RADIOACTIVITY M30166 B-44 BROHt
INPLANT M%6599 B-70 BROWNS FERRY 1
MONITORING OF FATIGUE TRANSIENT LIMITS M06428 F-70 BROHNS FERRY 1
NUREG-0737 III.D.3.4i CONTROL ROOM M56106 F-71 BROHNS FERRY 1
I.D.1.2 DETAII.ED CONTROL ROOM DESIGN M51669 B-72 BROHNS FERRY 1
NUREG 0737 TECH SPECS M52739 B-76 BROHNS FERRY 1 - ITEM 1.1 POST TRIP REVIEW PROGRAM M52820 B-77 BROHNS FERRY 1
ITEM 2.1 EQUIPMENT CLASSIFICATIOtt AND SUPPORT CENTER SUPPORT CENTER BREAKS IN THE BHR SCRAM SYSTEM OPERATIONS FACILITY DATA TO MEET RULE DATA UPGRADE RADIATION MONITORING FOR THE REACTOR COOLANT SYSTEM HABITABILITY REVIEW
SUMMARY
REPORT F-71 DESCRIPTION AND PROCEDURES VENDOR INTERFACE RTS COMPONENTS TESTING PROCEDURES/VENDOR RECOMMENDATIONS - RTS COMPONE B-79 BROHNS FERRY 1-ITEM 3. 1. 3-POST-MAINTENANCE TESTING"CHNGS TO TECH SPECS-RTS COMPONENTS M52982 M56518 GENERIC LETTERS 83-36'3-37 FOR NUREG-0737 PIPING ACCORDING TO GENERIC LETTER 8'-11 INFORMATION CAPABILITY B-83 BROHNS FERRY 1
TECHNICAL SPECIFICATIONS COVERED BY M55590 B-86 BROWNS FERRY 1
INSPECTION OF BWR STAINLESS STEEL B-85 BROHNS FERRY 1
ITEM 1.2 - POST TRIP REVIEW-DATA.AND M53571 M5365%
B-86 BROHNS FERRY 1
ITEM 2 ~ 2 EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE ALL SR COMPONENTS
R-1208731-001 BROWNS FERRY 1
REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMPL EMENTATI ON (CONTINUATION)
PAGE NO.-
41 Oli14/86 TAC NO.
~PA T T M53737 B-87 BROWNS FERRY 1-ITEMS 3.2.1 8 3.2.2 - POST"MAIt(T TESTING PROCEDURES AND VENDOR RECOMMENDATIONS ALL SR CPMPPNFN H53820 B-88 BROWNS FERRY 1
ITEM 3.2.3 POST-MAIttTENANCE TESTING M54007 B-92 BROWNS FERRY 1
ITEM 4.5.1 - REACTOR SYSTEM FUttCTIOttAL M53964 B-93 BROWNS FERRY 1
ITEMS 6.5.2 8 6.5.3 REACTOR TRIP
-CHANGES TO TECH.
SPEC.
ALL SR COMPONENTS TESTING - DIVERSE TRIP FEATURES SYSTEM FUNCTIONAL TESTING ALTERNATIVES 8 TEST INTERVA
R-1208731-001 REGULATORY INFORMATION TRACKINGSYSTEM FACILITY <IMP L EMENTATI ON PAGE tt0.-
42 00/16/86 FACILITY-BROHNS FERRY 2 PLANT LOCATION: 10 MI NW OF DECATURi ALA DOCKET NUMBER-050-00260 ARCH/EttGItiEER-TVA IE INSPECTOR:
J.
PAULK LICENSED POWER:
3293 MHT DESIGN POHER:
1065 MHE NSSS VENDOR-GE PROJECT MANAGER: R.
CLARK BRANCH CHIEF:
D.
MULLER LIC. ASSISTANT:
S.
NORRIS M08328 A-01 M07930 D-01 M00005
~
F-01 M07885 B-01 TAC NO.
~P BROHNS FERRY 2 10 CFR 50.55A(G)
INSERVICE INSPECTION GENERIC BROHttS FERRY 2 - MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION BROHNS FERRY 2 - NUREG-0737 I.A.1.1 STA LONG TERM REQUIREMENTS BROHNS FERRY 2 DIESEL GENERATOR LOCKOUT M08026 E-01 BROHNS FERRY 2 SFP STORAGE (AMEND 39)
M08261 C-02 BROHNS FERRY 2 ATHS RECIRCULATION PUMP TRIP Mc>6073 F-02 BROWttS FERRY 2 NUREG-0737 I.A.1.3.1p SHIFT MANNING M08134 A-02 BROHNS FERRY 2 APPENDIX I T.S.
IMPLEMENTATION REVIEW F 03 BROHNS FERRY 2 NUREG 0737 I ~ A ~ 2 ~ 1 tp UPGRADIttG OF RO OVERTIME LIMITS REVIEH AND SRO TRAINING M07490 A-03
'BROHNS FERRY 1 - REVIEW OF SECURITY PLAN M08622 A-03 BROHNS FERRY 2 - SECURITY REVIEW AMEttD NO. l3 M%8132 E-04 BROHNS FERRY 2 SINGLE LOOP OPERATION M%6215 F-06 BROHNS FERRY 2 NUREG-0737 I.C.1.2.Ai INADEQUATE CORE COOLING GUIDELZNES M08716 A"04 BROHNS FERRY 2 CONTAINMENT LEAK TESTING APP.
J (GENERIC)
M%6285 F-05 BROHNS FERRY 2 PROCEDURES GEttERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)
M%6653 M08209 B-05 BROHNS FERRY 2 IMPLEMEttTATION OF NUREG"0313, REV.
1 B-05 BROHNS FERRY 2 STRESS CORROSION CRACKING BHR RCS PB GENERIC M07911 A-05 BROWNS FERRY 2 MARK I CONTAINMENT SHORT TERM PROGRAM IMPLEMENTATION (AMENDMENT l2)
M08186 B-06 BROHNS FERRY 2 -
BHR SAFETY/RELIEF VALUE SURVEILLANCE GENERIC M08561 A-06 BROWN'S FERRY 2 RESPIRATORY PROTECTION PROGRAM (AMEND 18)
~jl R-1208731"001 BROHNS FERRY 2 REGULATORY INFORMATION TRACKINGSYSTEM FACIL ITY IMP L EMENTATI ON (CONTINUATION)
PAGE NO.:
43 04/14/'86 TAC NO.
PA M47198 F-06 BROHNS FERRY 2 FEEDBACK OF OPERATIttG EXPERIENCE M47270 F-07 BROHNS FERRY 2 - CORRECT PERFORMAttCE OF OPERATING M08428 A-08 BROHNS FERRY UNIT 2 LPCI MOD (AMEttD 45)
(AP I.C.5)
ACTIVITIES (API.C.6)
M51144 F-08 BROHNS FERRY 2 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRAMS PLAN F"08 M51224 F-09 BROHNS FERRY 2 I.D.2.
SAFETY PARAMETER DISPLAY SYSTEM M11363 A-09 BROHNS FERRY 2 REACTOR VESSEL BELTLINE MATERIAL SURVEILLANCE M10464 A-10 BROWNS FERRY 2 CONTINGENCY PLAN REVIEW (AMEND 70)
M07975 C-10 BROHNS FERRY 2-CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)
M44356 F-10 BROHNS FERRY 2 NUREG-0737 II ~ B.1, RCS HIGH POINT VENTS M08930 C"11 BROWNS FERRY 2 RPS POWER SUPPLY M10456 A-11 BROWNS FERRY 2 GUARD TRAINING PLAN REVIEW (AMEND 69)
M47922 F-11 BROHNS FERRY 2 PLANT SHIELDING MODIFICATIONS (II.B.2.2)
M10075 D-11 BROHtfS FERRY 2 ENHANCED FISSION PRODUCT RELEASE FOR HIGH BURNUP LHR FUEL M10460 A-12 BROHNS FERRY 2 VITAL AREA ANALYSIS F-12 BROWNS FERRY 2 NUREG"0737 II.B.3.2i POST ACCIDENT M44494 F"13 BROHNS FERRY 2 NUREG-0737 II. B. 4. 1 p TRAINING FOR M11325 A-14 BROHNS FERRY 2 INSERVICE TESTING SAMPLING MODIFICATIONS MITIGATING CORE M44565 M12296 M52211 F
1 4 NUREG 0737 i II ~ D ~ 1
~ 2 ~
RV AND SV TESTING D-15 BROWS FERRY 2 - HELB AND CONSEQUENTIAL SYSTEM FAILURE C-15 BROHNS FERRY 2 CONTROL OF HEAVY LOADS PHASE II BROWN'S FERRY 2 (FOLLOHUP OF MPACC-10)
M13272 M12120 M43873 D-16 B-16 A"16 BROHNS FERRY 2 REVIEW OF CORPORATE CAPABILITIES BROHNS FERRY 2 EMERGENCY PLAN REVIEW BROHNS FERRY - QUALIFICATIONS IttSP.,
EXAM, TEST, AUDIT PERSONNEL
R-1208731-001 BROWNS FERRY 2 REGULATORY INFORMATION TRACKING SYSTEM FAG I L I TY IMP L EMENTAT I ON (CONTINUATION)
PAGE NO.:
06/10/86 TAC NO.
MPA M13165 D-17 BROHNS FERRY TI 2 - GENERIC CLARIFICATION OF "OPERABILITY" (AMEttD 62)
M51076 A-17 BROHNS FERRY 2 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG 1.97)
M08727 B"17 BROWNS FERRY 2 - HYDRAULIC SNUBBERS (AMEND 81)
M%6762 F-18 BROHttS FERRY 2 NUREG-0737 II.E.4.1.2, DEDICATED HYDROGEN PENETRATIONS M53354 A BROHNS FERRY 2 REPORTING REQUIREMENTS OF 10 CFR 50.73 (AMEttD 93)
M55950 A-19 BROHNS FERRY UNIT 2 HYDROGEN COttTROL M55801 D-19 BROWNS FERRY 2 - DIESEL GENERATOR RELIABILITYTECH.
M%6833 F-19 BROHNS FERRY 2 - NUREG-0737 II.E.4.2p CONTAINMEttT M66906 F-20 BROHNS FERRY 2 NUREG"0737 II.F.1.1p NOBLE GAS SPECS.
(GL 80"15)
ISOLATION'EPEttDABILITY MONITOR M59073 A-20 BROHNS FERRY 2 10CFR50.62 OPERATING REACTOR REVIEWS M57165 D-20 BROHNS FERRY 2
- MARK I DRYHELL VACUUM BREAKERS LICENSEE
RESPONSE
TO GENERIC LETTER 83-08 M10292 B-20 BROHNS FERRY 2 CONTAINMENT LEAKAGE DUE TO SEAT DETERIORATION M10353 B-21 BROHNS FERRY 2 LOSS OF 125V DC BUS VOLTAGE WITH LOSS W4975 F-21 BROHNS FERRY 2 - NUREG-0737 II.F.1.2i IODINE/
M45066 F-22 BROHNS FERRY 2 NUREG-0737 II.F.1.3, CONTAINMENT HIGH OF ANNUNCIATOR SYSTEM PARTICULATE SAMPLING RANGE MONITOR M08721 B-22 BROWNS FERRY 2 MECHANICAL SNUBBERS (AMEND 81 )
M10011 B-23 BROHNS FERRY 2 POTENTIAL EQUIPMENT FAILURES ASSOCIATED HITWITH GRID VOLTAGE (AMEND 72)
M%7583 F-23 BROHNS FERRY 2 NUREG 0737 ITEM II F1. 6 CONTAINMENT M%7656 F-20 BROHNS FERRY 2 - NUREG 0737 ITEM II F1.5 CONTAINMENT PRESSURE INSTRUMENT HATER LEVEL MONITOR M10186 M11814 B-26 BROWttS FERRY 2 CONTAINMENT PURGE B-26 BROWNS FERRY 2 THREE MILE ISLAND FOLLOW-UP WORK M%2569 B-2I BROHNS FERRY M08436 B-25 BROWNS FERRY 2 LONG TERM REVIEH CONTAINMENT PURGE AND l
2 BHR FEEDHATER 8 CONTROL ROD DRIVE VENT (B-24)
NOZZLE CRACKLING
R-1208731-001 BROHNS FERRY 2 REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMPLEMENTATION (CONTINUATION)
PAGE NO.:
45 04/14/86 M45117 F-26 BROHNS TAG HO
~PA p
M47725 F-25 BROWNS FERRY FERRY 2 NUREG 0737 ITEM II F1.6 COttTAINMEtlT HYDROGEN MONITOR 2 NUREG-0737 II.F.2.3p INADEQUATE CORE COOLING INSTRUMENTATION M10875 B-27
-BROHNS FERRY 2 - OFF GAS EXPLOSION PREVEttTIOtt REVIEH (IE BUL. 78-03)
M30180 M30181 M30182 M45561 B-44 BROHNS FERRY 2-2.1.3 B INST.
FOR CORE COOLING B-44 BROHNS FERRY 2-2.1.3 A DIRECT INDICATION OF VALVE B-44 BROWNS FERRY 2-2.1.2 RELIEF 8 SAFETY VALVE TESTING F-45 BROHNS FERRY Z NUREG"0737 II.K.3.15p ISOLATIOtt OF M12892 B-45 BROHNS FERRY 2"PRIMARY COOLANT SYSTEM PRESSURE M45585 F-46 BROHttS FERRY 2 NUREG 0737 II'
' '6p CHALLENGES AND M45612 F-47 BROHNS FERRY 2 - NUREG-0737 II.K.3.17p ECC SYSTEM M45326 F-38 BROHNS FERRY 2 NUREG-0737 II.K.3.3, REPORT ON M48135 B-41 BROWNS FERRY 2 - FIRE PROTECTION APPENDIX R M52393 B-41 BROHNS FERRY 2 APPENDIX R EXEMPTION REQUESTS M45533 F-43 BROHthS'FERRY 2 - NUREG-0737 II.K.3.13p HPCI AND RCIC M30170 B-44 BROHNS FERRY 2-2.1.5 A,C DEDICATED H2 CONTROL M30172 B"44 BROHNS FERRY 2-2.2.2 ApBpC CONTROL ROOM ACCESS.
M30173 B"44 BROHNS FERRY 2-2.2.1 A,B,C SHIFT SUPER.
RESP.
p M30174 B-44 BROHNS FERRY 2"2.1.8.C IMPROVED IODINE INST.
M30175 B-44 BROHNS FERRY 2-2, 1. 8, B HIGH RANGE RADIATION
.M30176 B-44 BROHNS FERRY 2-2.1.8.A POST ACCIDENT SAMPLING M30177 B-44 BROWNS FERRY 2-2. 1. 6. B SHIELDING REVIEW M30178 B-44 BROWNS FERRY 2-2.1.6.A SYSTEMS INTEGRITY FOR HIGH M30179 B-44 BROHNS FERRY Z-2.1.4 DIVERSE CONTAINMENT ISOLATION RV/SV FAILURES INITIATION LEVELS PEttETRATIONS 8 RECOMBINER PROCEDURE
- TSC, OPERATIONAL SUPPORT CENTER
R-1208731-001 BROHNS FERRY 2 REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMPLEMENTATION (CONTINUATION)
PAGE NO.:
66 Ohr1gr86
~TAG 0.
M%5681 MPA F-68 BROHNS FERRY 2 - NUREG-0737 II.K.3.18p ADS ACTUATION Wi5729 MI7850 F 50 BROHNS FERRY 2 NUREG 0737 II K 3 21 p RESTART OF CSS F-51 BROHNS FERRY 2 NUREG 0737 II. 3.22Bp RCIC Wi6715 F-52 BROHNS FERRY 2 NUREG 0737 ADEQUACY OF SPACE W5753 F-53 BROHNS FERRY 2 NUREG-0737 II.K.3.25p POWER ON PUMP M%5777 F-50 BROHNS FERRY 2 -'UREG-0737 II.K.3.27p COMMON REFERENCE M13105 B-68 BROHNS FERRY 2 ADEQUACY OF DISTRIBUTION SYSTEMS M%5705 F-69 BROHNS FERRY 2 NUREG"0737 II.K.3.19p INTERLOCK RECIRC STUDY (AMEttD 72)
PUMP MODIFICATION AND LPCI SUCTION MODIFICATIONS COOLING FOR HPCI AND RCIC (AP II.K.3.26)
SEALS LEVEL M%8261 F-55 BROWNS FERRY 2 "NUREG 0737 II.K.3.28p VERIFY QUALIFICATION QUALIFICATION OF ACCUMULATORS ON ADS VALVES M t5808 f 57 BROHNS FERRY 2 NUREG 0737 II K 3 30p SB LOCA OUTLINE M%3172 B-58 BROHNS FERRY 2 - SCRAM DISCHARGE VOL. VENT 8 DRAItt VALVES (AMEND 80)
M%2231 B-58 BROHNS FERRY 2 BHR SCRAM DISCHARGE VOLUME CAPABILITY M%8169 F-58 BROHNS FERRY 2 "NUREG 0737 II.K.3.31 COMPLIANCE WITH M51013 B-58 BROHNS FERRY 2 SDV LONG TERM MODIFICATIONS M%5877 F-59 BROHNS FERRY 2 NUREG-0737 II. K.3. 60 p TRANSIENTS WITH M%2876 B-59 BROHNS FERRY 2 MASONRY HALL DESIGN.
RESPONSE
TO IE 10 CFR 50.06 SINGLE FAILURES BULLETIN 80-11 M%2082 M%5901 W2655 M%2725 B"60 BROHNS FERRY 2 ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT (80-CLI-21)
F"60 BROWNS FERRY 2 NUREG-0737 II.K.3.45p MANUAL DEPRESSURIZATION B-61 BROHNS FERRY 2 - IE BULLETItt 79-27 p
LOSS OF NOtt CLASS IE INST 8 CONTR.
POWER.
REV.
8 EVAL. RESPONSES B-62 BROHNS FERRY 2 - ESF RESET CONTROL DESIGN DEFICIENCY - ISE BULLETIN 80-06 Mci3509 M%5928 B-63 BROHNS FERRY 2 STATION BLACKOUT (A-00)
F-63 BROHNS FERRY 2 NUREG-0737 III.A.1.2p TECHNICAL M%5999 F"66 BROHNS FERRY 2 NUREG-0737 III.A.1.2p OPERATIONAL SUPPORT CENTER SUPPORT CENTER
R-1208731-001 BROHNS FERRY 2 REGULATORY INFORMATION TRACKING SYSTEM FACIL ITY IMPLEMENTATION (CONTINUATION)
PAGE NO.:
47 06/1 I/86 TAC NO.
MPA M%6071 M%3731 F-65 BROHNS FERRY 2 NUREG-0737 III.A.1.2i EMERGENCY B-65 BROWNS FERRY 2 SAFETY CONCERNS ASSOCIATED WITH PIPE OPERATIOt)S FACILITY BREAKS IN THE BHR SCRAM SYSTEM M%6113 F-66 BROHttS FERRY 2 III.A.2 NUCLEAR DATA LINK M%6215 F-67 BROHNS FERRY 2 III.A.2.1 EMERGENCY PLAN UPGRADE M%6287 F-68 BROHNS FERRY 2 NUREG-0737 III.A.2.2i METEOROLOGICAL M%6358 F-69 BROHNS FERRY 2 NUREG-0737 III.D.3.3p INPLAttT M%6600 B-70 BROWNS FERRY 2 MONITORING OF FATIGUE TRANSIENT LIMITS M%6429 F-70 BROHttS FERRY 2
-" NUREG-0737 III.D.3.6p CONTROL ROOM M56105 F-71 BROHNS FERRY 2 I.D.1.2 DETAILED CONTROL ROOM DESIGN DATA TO MEET RULE DATA UPGRADE RADIATION MONITORING FOR THE REACTOR COOLANT SYSTEM HABITABILITY REVIEW
SUMMARY
REPORT - F-71 M51670 B-72 BROHNS FERRY 2 NUREG 073?
TECH SPECS M52700 B-76 BROHNS FERRY 2 ITEM 1.1 - POST TRIP REVIEW PROGRAM DESCRIPTION AND PROCEDURES M52821 B-77 BROHNS FERRY 2 ITEM 2.1 EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS M52902 B-78 BROWNS FERRY 2 ITEMS 3.1.1 8 3.1.2 POST MAINTENANCE TESTING PROCEDURES/VENDOR RECOMMENDATIONS RTS COMPONE M52983 B-79 BROHNS FERRY 2-ITEM 3.1.3-POST-MAINTENANCE TESTING-CHNGS TO TECH SPECS-RTS COMPONENTS M54519 B-83 BROWNS FERRY 2 TECHNICAL SPECIFICATIONS COVERED BY M55591 B-84 BROHNS FERRY 2 INSPECTION OF BHR STAINLESS STEEL PIPING M53572 B"85 BROHNS FERRY 2 ITEM 1.2 POST TRIP REVIEW"DATA AND GENERIC LETTERS 83-36'3-37 FOR NUREG-0737 ACCORDING TO GENERIC LETTER 84-11 INFORMATION CAPABILITY M53655 B-86 BROHNS FERRY 2 ITEM 2.2 EQUIPMENT CLASSIfICATION AND VENDOR INTERFACE - ALL SR COMPONENTS M53738 M53821
-CHANGES TO TECH.
SPEC. - ALL SR COMPONENTS TESTING DIVERSE TRIP FEATURES SYSTEM FUNCTIONAL TESTING - ALTERNATIVES 8 TEST INTERVA B-88 BROHNS FERRY 2 ITEM 3.2.3 POST-MAINTENANCE TESTING M54068
. B-92 BROHNS FERRY 2 ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL M53965 B-93 BROHNS FERRY 2 - ITEMS 1.5.2 8 6.5.3 REACTOR TRIP B-87 BROHNS FERRY 2-ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES At1D VENDOR RECOMMENDATIONS - ALL SR CPMPONEN
R-1208731-001 REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMPLEMENTATION PAGE NO.-
48 04/14/86 FACILITY: BROWNS FERRY 3 PLANT LOCATION: 10 MI NH OF DECATUR'LA DOCKET NUMBER'050-00296
'ARCH/ENGINEER:
PAULK LICENSED POWER:
3293 MHT DESIGN POWER:
1065 MHE NSSS VENDOR-GE PROJECT MANAGER: R.
CLARK BRANCH CHIEF:
D.
MULLER LIC. ASSISTANT:
S.
NORRIS TAC NO.
MPA M07931 D-01 BROHNS FERRY 3 MARK I CONTAIttMENT LONG TERM PROG.
M%6006 F-01 BROWNS FERRY 3 NUREG-0737 I.A.1.1 STA LONG TERM M06867 A-01 BROHNS FERRY 3 ISI PUMP AND VALVE TESTING IMPLEMENT.
REQUIREMENTS M07886 B-01 BROWNS FERRY 3 DIESEL GENERATOR LOCKOUT M08427 E-01 BROHNS FERRY 3 - SFP STORAGE (AMEND 16)
M08262 C"02 BROHNS FERRY 3-ATWS RECIRCULATION PUMP TRIP M%%076 F-02 BROWNS FERRY 3 NUREG-0737 I.A.1.3.1, SHIFT MANNING OVERTIME LIMITS M08135 A-02 BROHNS FERRY 3 APPENDIX "I" TECH.
SPEC.
IMPLEMENTATION REVIEW (TECH.
SPEC. - 192)
M64145 M08423 F-03 A-03 BROHNS FERRY 3 NUREG-0737 I.A.2.1-6i UPGRADING OF RO AND SRO TRAINING BROHNS FERRY 3 SECURITY REVIEW AMEND NO.
20 M08026 E-03 BROHNS FERRY 3 CYCLE 2 RELOAD AMEND 18 M%8133 E-06 BROHNS FERRY 3 SINGLE LOOP OPERATION M%4216 F-0%
BROHNS FERRY 3 NUREG"0737 I.C.1.2.Ap INADEQUATE CORE COOLING GUIDELINES M%6656 M07912 B-05 BROHNS FERRY 3 IMPLEMENTATION OF NUREG-0313'EV.
1 A-05 BROHNS FERRY 3-MARK I CONTAINMENT SHORT TERM PROGRAM M08210 B-05 BROHNS FERRY 3 STRESS CORROSION CRACKING BHR RCS M08185 B-06 BROHNS FERRY 3 BHR SAFETY/RELIEF VALUE SURVEILLANCE M08562 A-06 BROWNIES FERRY 3 RESPIRATORY PROTECTION M08717 A-04 BROHNS FERRY 3 CONTAINMENT LEAK TESTING APP.
J (GENERIC)
M%6286 F-05 BROHNS. FERRY 3 PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)
IMPLEMENTATION (AMEND 19)
PB GENERIC GENERIC PROGRAM (AMEND 25)
R-1208731-001 BROWNS FERRY 3 REGULATORY INFORMATION TRACKING SYSTEM FACIL ITY IMP L EMENTATION (CONTINUATION)
PAGE NO.:
09 00/16/86 TAO MO MPA M%7199 F-06 BROWNS FERRY 3 - FEEDBACK OF OPERATING EXPERIENCE M%7271 F-07 BROWNS FERRY 3 CORRECT PERFORMANCE OF OPERATING M08029 A-08 BROHNS FERRY 3 - LPCI MOD M51145 F-08 BROHNS FERRY 3 I.D.1.1 DETAILED CONTROL ROOM DESIGN M12236 A-08 BROWNS FERRY 3 LOCA ANALYSIS M11362 A-09 BROHNS FERRY 3 REACTOR VESSEL BELTLINE MATERIAL (AP I.C.5)
ACTIVITIES (API.C.6)
REVIEW PROGRAMS PLAN F-08 SURVEILLANCE M51225 F-09 BROHNS FERRY 3 - I.D.2.
SAFETY PARAMETER DISPLAY SYSTEM M10665 A-10 BROHNS FERRY 3 CONTINGENCY PLAN REVIEW (AMEND 05)
M08438 C-10 BROWNS FERRY 3-CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)
M%1357 M08931 F-10 BROHNS FERRY 3 - NUREG-0737 II.BE 1P RCS HIGH POINT C-11 BROHNS FERRY 3 - RPS POWER SUPPLY VENTS M10457 A-11 BROHNS FERRY 3 GUARD TRAINING PLAN REVIEW (AMEND 04)
M%7923 F-11 BROHNS FERRY 3 PLANT SHIELDING MODIFICATIONS (II.B.2.2)
M10076 D-11 BROHNS FERRY 3 ENHANCED FISSION PRODUCT RELEASE FOR HIGH BURNUP LHR FUEL M%0095 F-13 BROHNS FERRY 3 NUREG-0737 II.B.0.1P TRAINING FOR M11326 A-10 BROWNS FERRY 3 INSERVICE TESTING M10461 A-12 BROHNS FERRY 3 VITAL AREA ANALYSIS M66425 F-12 BROHNS FERRY 3 NUREG"0737 II.B.3.2P POST ACCIDENT SAMPLING MODIFICATIONS MITIGATING CORE W0566 M12297 M52212 M12121 M13273 C-15 B-16 D-16 BROHNS FERRY 3 CONTROL OF HEAVY LOADS - PHASE II AI BROHNS FERRY 3 -
EMERGENCY PLAN REVIEW BROHNS FERRY 3 REVIEW OF CORPORATE CAPABILITIES F
1 t NUREG 0737 P II D 1
~ 2 RV AND SV TESTING D-15 BROWN'S FERRY 3 HELB AND CONSEQUENTIAL SYSTEM FAILURE BROWN'S FERRY 3 (FOLLOHUP OF MPA4C-10)
R-1 208731-001 BROWNS FERRY 3 REGULATORY INFORMATION TRACKING SYSTEM FACI L ITY IMP L EMENTAT I ON (CONTINUATION)
PAGE NO.
~
50 04/1 I/86 TAC NO.
MPA M%3876 A-16 BROWNS FERRY QUALIFICATIONS INSP. p EXAMp TESTp M13166 D-17 BROWNS FERRY 3 - GENERIC CLARIFICATION OF "OPERABILITY" M51075 A-17 BROWNS FERRY 3 - INSTRUMENTATION TO FOLLOW THE COURSE M08728 B-17 BROWNS FERRY 3 HYDRAULIC SNUBBERS M%4763 F-18 BROWNS FERRY 3 NUREG-0737 II.E.6.1.2p DEDICATED M53355 A-18 BROWNS FERRY 3 - REPORTING REQUIREMENTS Of 10 CFR 50.73 M55842 D-19 BROWNS FERRY 3 - DIESEL GENERATOR RELIABILITYTECH.
M55955 A-19 BROWNS FERRY UNIT 3 HYDROGEN CONTROL M66836 F-19 BROWNS FERRY 3 - NUREG-0737 II.E.6.2p CONTAINMENT M t t905 F 20 BROWNS FERRY 3 NUREG 0737 II ~ F 1
1 p NOBLE GAS AUDIT PERSONNEL D(AMEND 38)
OF AN ACCIDENT (RG 1.97)
HYDROGEN PENETRATIONS (AMEND 66)
SPECS.
(GL 84-15)
ISOLATION DEPENDABILITY MONITOR M59074 A-20 BROWNS FERRY 3 - 10CFR50.62 OPERATING REACTOR REVIEWS M57166 D-20 BROWNS FERRY 3 - MARK I DRYWELL VACUUM BREAKERSp LICENSEE
RESPONSE
TO GENERIC LETTER 83-08 M10293 B-20 BROWNS FERRY 3 CONTAINMENT LEAKAGE DUE TO SEAL ON M10355 B-21 BROWNS FERRY 3 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIATOR SYSTEM M4 1976 F 21 BROWNS FERRY 3 NUREG 0737 II F 1
2 p IODINE/
Wi5047 F-22 BROWNS FERRY 3 NUREG-0737 II.F.1.3, CONTAINMENT HIGH PARTICULATE SAMPLING RANGE MONITOR M08722 B-22 BROWNS FERRY 3 MECHANICAL SNUBBERS M10012 M%758%
M%7655 F-23 BROWNS FERRY 3 NUREG 0737 ITEM II F1. 6 - CONTAINMENT F-26 BROWNS FERRY 3 NUREG 0737 ITEM II F1.5 CONTAINMENT PRESSURE INSTRUMENT WATER LEVEL MONITOR B-23 BROWNS FERRY 3 POTENTIAL EQUIPMENT FAILURES ASSOCIATED WITH GRID VOLTAGE (AMEND 52)
M10185 B-26 BROWNS FERRY M%2570 B-26 BROWNS FERRY M08437 B-25 BROWNS FERRY
- CONTAINMENT PURGE LONG TERM REVIEW CONTAINMENT PURGE AND P
BWR FEEDWATER 8 CONTROL ROD DRIVE NOZZLE VENT (B-26)
CRACKING
R-1208731-001 BROWNS FERRY 3 REGULATORY INFORMATION TRACKINGSYSTEM FACIL ITY IMP L EMENTATI ON (CONTINUATION)
PAGE NO.:
51 04/14/86 M45118 F-26 BROWNS FERRY 3 NUREG-0737 II.F.2.3i It(ADEQUATE CORE M10876 B-27 BROWNS FERRY 3 OFFGAS EXPLOSION PREVENTION REVIEW M45327 F-38 BROWNS FERRY 3 - NUREG-0737 II.K.3.3, REPORT ON M48136 B-41 BROWNS FERRY 3 - FIRE PROTECTION APPENDIX R M52394 B"41 BROWNS FERRY 3 APPENDIX R EXEMPTION REQUESTS M11815 B-42 BROWNS FERRY 3 - THREE MILE ISLAND FOLLOW-UP WORK TAC NO.
MPA M477Z6 F-25 BROWNS FERRY 3 - NUREG 0737 ITEM II F1.6 COtfTAIt)MENT HYDROGEN MONITOR COOLING INSTRUMENTATION IE BUL 78-03 Rvisv FAILURES M45534 M30184 M30186 M30187 F-43 BROWNS FERRY 3 NUREG-0737 II.K.3.13, HPCI AND RCIC B-44 BROWNS FERRY 3-2.1.5 A,C DEDICATED HZ CONTROL B-44 BROWNS FERRY 3-2.2.2 A,B,C CONTROL ROOM ACCESS, B-44 BROWNS FERRY 3-2.2.1 ApBiC SHIFT SUPER.
RESP.,
INITIATION LEVELS PENETRATIONS 8 RECOMBINER PROCEDURE
M30189 B-44 BROWNS FERRY 3-2.1.8.B HIGH RANGE RADIATION M30190 B-44 BROWNS FERRY 3-2.1.8.A POST ACCIDENT SAMPLING M30191 B"44 BROWNS FERRY 3-2.1.6.B SHIELDING REVIEW M30192 B-44 BROWNS FERRY 3-2.1.6.A SYSTEMS INTEGRITY FOR HIGH M30193 B"44 BROWNS FERRY 3-2.1,4 DIVERSE CONTAINMENT ISOLATION M30194 B-44 BROWNS FERRY 3-2.1.3 B INST.
FOR CORE COOLING MONITORS RADIOACTIVITY M30195 M30196 B-44 BROWNS FERRY 3-2.1.3 A DIRECT IttDICATION OF VALVE B-44 BROWNS FERRY 3-2.1.2 RELIEF 8 SAFETY VALVE TESTING POSITION M45562 F-45 BROWNS FERRY 3 NUREG-0737 II.K.3.15'SOLATION OF M12893 B"45 BROWNS FERRY 3-PRIMARY COOLANT SYSTEM PRESSURE M45586 F-46 BROWNS FERRY 3 NUREG-0737 II.K.3.16'HALLENGES AND HPCI AND RCIC MODIFICATION
, ISOLATION VALVES FAILURES OF RELIEF VALVES
lN R-1208731-001 BROHNS FERRY 3 REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMPLEMENTATION (CONTINUATION)
PAGE NO.:
52 04/14/86 TAC O.
~PA M45613 F-47 BROHNS FERRY 3 NUREG-0?3? II.K.3.1?,
ECC SYSTEM M45682 F-48 BROHNS FERRY 3 - NUREG"0737 II.K.3.18, ADS ACTUATION OUTAGES STUDY M13106 B-48 BROHNS FERRY 3 ADEQUACY OF DISTRIBUTION SYSTEMS VOLTAGES (AMEND. 52)
- M45706, M45730 M47851 F-49 BROHNS FERRY 3 NUREG-0737 II.K.3.19'NTERLOCK RECIRC F-50 BROHNS FERRY 3 NUREG-0737 II.K.3.21'ESTART OF CSS F-51 BROHNS FERRY 3 NUREG - 0737 II. 3.22B, RCIC M46716 F-52 BROHNS FERRY 3 NUREG 0737 ADEQUACY OF SPACE M45754 F-53 BROHNS FERRY 3 NUREG-0737 II.K.3.25'OWER ON PUMP M45778 F-54 BROHNS FERRY 3 NUREG-0737 II.K.3.27, COMMON REFERENCE PUMP MODIFICATION AND LPCI SUCTION MODIFICATIONS COOLING FOR HPCI AND RCIC (AP II.K.3.24)
SEALS LEVEL M48262 F-55 BROHNS FERRY 3-NUREG 0737 II.K.3.28'ERIFY QUALIFICATION OF ACCUMULATORS M45809 F-57 BROHNS FERRY 3 NUREG-0737 II.K.3.30'B LOCA M43173 B-58 BROWNS FERRY 3 - SCRAM DISCHARGE VOL. VENT 8 DRAIN VALVES M42232 B-58 BROHNS FERRY 3 - BHR SCRAM DISCHARGE VOLUME CAPABILITY M48150 F-58 BROHNS FERRY 3 "NUREG 0737 II.K.3.31 COMPLIANCE WITH M51014 B-58 BROHNS FERRY 3 SDV LONG TERM MODIFICATIONS M42875 B-59 BROHNS FERRY 3 MASONRY WALL DESIGN.
RESPONSE
TO IE M45878 F-59 BROWNS FERRY 3 - NUREG-0737 II.K.3.44i TRANSIENTS WITH M42483 B-60 BROHNS FERRY 3 ENVIRONMENTAL QUALIFICATION OF SAFETY OUTLINE 10 CFR 50.46 BULLETIN 80"11 SINGLE 'FAILURES RELATED ELECTRICAL EQUIPMENT (80-CLI-21)
DEPRESSURIZATION M45902 M42656 F-60 BROWNS FERRY 3 NUREG-0737 II.K.3.45, MANUAL M42726 B-61 BROHNS FERRY 3 - IE BULLETIN 79-2?i LOSS OF NON CLASS IE INST 8 CONTR.
POWER.
REV.
8 EVAL. RESPONSES B-62 BROHNS FERRY 3 ESF RESET CONTROL DESIGN DEFICIENCY IRE BULLETIN 80-06 M43510 B-63 BROHNS FERRY 3 - STATION BLACKOUT (A-44)
M45929 F-63 BROHNS FERRY 3 NUREG-0737 III.A.1.2p TECHNICAL SUPPORT CENTER
R-1208?31-001 BROHNS FERRY 3 REGULATORY INFORMATION TRACKING SYST FACIL ITY IMP L EMENTATI ON (CONTINUATION)
PAGE NO ~ '3 044i1 o4/86
~TA NO N PA O
Mo46000 F-6o4 BROHNS FERRY 3 NUREG-0737 III.A.1.2P OPERATIONAL Mo46072 F-65 BROWNS FERRY 3 NUREG-0737 III.A.1.2P EMERGENCY M443736 B-65 BROHNS FERRY 3 SAFETY CONCERNS ASSOCIATED WITH PIPE M66144A4 F-66 BROHNS FERRY 3 III.A.2 NUCLEAR DATA LINK M%6216 F"67 BROHNS FERRY 3 III.A.2.1 EMERGENCY PLAN UPGRADE M446288 F-68 BROHNS FERRY 3 NUREG-0737 III.A.2.2p METEOROLOGICAL M%6359 F-69 BROHNS FERRY 3 NUREG"0737 III.D.3.3P INPLANT M4466 01 B-70 BROHNS FERRY 3 MONITORING OF FATIGUE TRANSIENT LIMITS M%64430 F-70 BROHNS FERRY 3 - NUREG-073? III.D.3.4'4P CONTROL ROOM M56106 F-71 BROHNS FERRY 3 I.D.1.2 DETAILED CONTROL ROOM DESIGN M51671 B-72 BROHNS FERRY 3 NUREG 0737 TECH SPECS M527441 B-76 BROHNS FERRY 3 ITEM 1.1 POST TRIP REVIEW PROGRAM SUPPORT CENTER OPERATIONS FACILITY BREAKS IN THE BHR SCRAM SYSTEM DATA TO MEET RULE DATA UPGRADE RADIATION MONITORING FOR THE REACTOR COOLANT SYSTEM HABITABILITY REVIEW
SUMMARY
REPORT - F-71 DESCRIPTION AND PROCEDURES M52822 B-77 BROHNS FERRY 3 ITEM 2.1 EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE RTS COMPONENTS M52903 B-78 BROHNS FERRY 3 ITEMS 3.1.1
& 3.1.2 - POST MAINTENANCE TESTING PROCEDURES/VENDOR RECOMMENDATIONS RTS COMPONE M529844 B-79 BROHNS FERRY 3"ITEM 3.1.3-POST-MAINTENANCE TESTIttG-CHNGS TO TECH SPECS-RTS COMPONENTS M544520 B"83 BROHNS FERRY 3 TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36'3"37 FOR NUREG"0?37 M55592 B-84 BROHNS FERRY 3 INSPECTION OF BHR STAINLESS STEEL PIPING ACCORDING TO GENERIC LETTER 84"11 M53573 B"85 BROHNS FERRY 3 - ITEM 1.2 - POST TRIP REVIEW-DATA AND INFORMATION CAPABILITY M53656 M53739 B-86 BROWNS FERRY 3 ITEM 2.2 EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE ALL SR COMPONENTS B-87 BROHNS FERRY 3-ITEMS 3.2.1 8 3.2.2 - POST-MAItlT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS ALL SR COMPONEN M53966 B-93 BROWNS FERRY 3 - ITEMS 44.5.2
& 44.5.3 REACTOR TRIP M53822 B-88 BROHNS FERRY 3 ITEM 3.2.3 POST-MAINTENANCE TESTING M544049 B-92 BROWNS FERRY 3 - ITEM 44.5.1 REACTOR SYSTEM FUNCTIONAL
-CHANGES TO TECH.
SPEC.
ALL SR COMPONENTS TESTING - DIVERSE TRIP FEATURES SYSTEM FUNCTIONAL TESTING - ALTERNATIVES & TEST INTERVA