ML18030A551
Jump to navigation
Jump to search
| ML18030A551 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/24/1981 |
| From: | WYLE LABORATORIES |
| To: | |
| Shared Package | |
| ML18030A320 | List: |
| References | |
| 404, NUDOCS 8107060217 | |
| Download: ML18030A551 (1) | |
Text
PRELIMINARY DATA SHEET FOR NUREG4737 S/RV TEST WLE LABS> HUNTSVILLE'LA>>
DATE TESTED 3-24-81 MODEL NP HB-65-BP-FN S/RV SERIAL NO RUN/TEST NO.
404 S/Ry MANUFACTURER CROSBY 6R10 TYPE OF TEST
- STEAM, SATURATED LOADS I
SUPPORTS TEST RESULTS S/RV OPENED ON COMMAND S/RV CLOSED ON COMMAND S/RV FLUID TEST CONDITIONS FLUID TEMPERATURE INLET PRESSURE S/RV FLOW RATE S/RV OPENING TIME (MAIN DISK LIFT TIME)
YES YES 5550F 1080 PSIG LATER 25mSec VALVE INTEGRITY DEMONSTRATED BY:
VISUAL INSPECTION POST-TEST HYDRO+
POST-TEST DISASSEMBLY INSPECTION+
FACILITY INTEGRITY DEMONSTRATED YES N/A*
N/A YES
+ ONLY ONCE PER VALVE AT ENO OF TEST SEQUENCE
- NOT APPLICABLE 8107060217 810 PDR,ADOCK 0500g3 7
A p