ML18030A549

From kanterella
Jump to navigation Jump to search
Results of Steam Saturated Test Conducted on 810324
ML18030A549
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/24/1981
From:
WYLE LABORATORIES
To:
Shared Package
ML18030A320 List:
References
402, NUDOCS 8107060213
Download: ML18030A549 (1)


Text

PRELIMINARY DATA SHEET'OR NUREG4737 S/RV TEST HYLE LABS'UNTSVILLE'LAe DATE TESTED 3-24-81 S/Ry MPOEI NP HB-65-BP-FN S/Ry SERIAL NP N63580 00 0019 RUN/TEST NO 402 S/Ry MANUFACTURER CROSBY 6R10 TYPE OF TEST STEAM SATURATED LOADS I

SUPPORTS TEST RESULTS S/RV OPENED ON COMMAND S/RV CLOSED ON COMMAND S/RV FLUID TEST CONDITIONS FLUID TEMPERATURE iNLET PRESSURE S/RV FLOW RATE S/RV OPENING TIME (MAIN DISK LIFT TIME)

~ YES YES 555'F 1080 PSIG LATER 25mSec VALVE INTEGRITY DEMONSTRATED BY:

VISUAL INSPECTION POST-TEST-HYDRO+

POST-TEST DISASSEMBLY INSPECTION FACILITY INTEGRITY DEMONSTRATED YES N/A N/A YES

+ ONLY ONCE PER VALVE AT END OF TEST SEQUENCE

  • NOT APPLICABLE 81070602i3 Si07 POR ADGCK 0500038.

A PD

.