ML18025B671
| ML18025B671 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/25/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18025B669 | List: |
| References | |
| NUDOCS 8110160427 | |
| Download: ML18025B671 (4) | |
See also: IR 05000259/1981022
Text
4
~ 0
p
t
~
Set(o
Valley Authority
~
~
~
ATTN:
Mr. H.
G. Parris
Manager of Power
500A Chestnut Street
Tower II
Chattanooga,
TN
37401
Gentlemen:
AUG 8 5
1981
Subject:
Report
Nos
-
9/81-22
50-260/81-22,
50-296/81-22
This refers to the routine safety inspection
conducted
by Mr. Robert
F. Sullivan
of this office on June
26 through July 26,
1981', of activities authorized
by
NRC
License
Nos.
DPR-52 and
DPR-68 for the
Browns Ferry facility.
Our
preliminary findings were discussed
with Mr. H. A. Abercrombie at the conclusion
of the inspection.
Areas
examined
during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection
consisted of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
During the inspection, it was
found that certain activities under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as
Appendix A.
Elements
to
be included in your response
are delineated
in
Appendix A.
During the inspection it was found that certain activities under
your license
appeared
to deviate
from commmitments
to the
Commission report enclosed
and
have
safety significance.
This item
identified in the Notice of Deviation enclosed
herewith
as
Appendix
B,
Please
provide us in writing within 25 days of your
receipt of this letter your
comments
including
a description of corrective
actions that
have
been
or will be taken, corre'ctive actions
which will be 'taken
to avoid further deviations,
and the date your corrective actions
were or will be
completed.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter
and the enclosed
report will be placed
in the
NRC's Public Document
Room.
If the report contains
any information that you believe to
be exempt
from dis-
, closure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this office
by telephone within ten
days
from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days
from the
date of this letter
a written application to this office to withhold such informa-
tion.
If your recei pt of this letter
has
been delayed
such that less
than
seven
days are available for your review, please notify this office promptly so that
a
new due date
may
be established.
Consistent with section 2.790(b)(1),
such
application
must
be accompanied
by an affidavit executed
by the owner of the
information which identifies the document or part thereof sought to
be withheld,
'110160427
811D~O7 >
ADQCK 05000259
t
9
PDRJ
~ k
Valley Authority
AUG 2 5 1981
and
a full statement
of the reasons
on the basis of which it is claimed that the
information should
be withheld from public disclosure.
This section further
requires
the statement
to address
with specificity the considerations
listed in
The information sought to be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear
from
you in this regard within the specified
periods
noted above,
the report will be
placed
in the Public Document
Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosures:
l. Appendix A, Notice of Violation
2. Appendix B, Notice of Deviation
~
~
3. Inspection
Report Nos. 2S9-81-22,
260-81-22
and 296-81-22
cc w/encl:
H. J.
Green, Director of Nuclear
Power
H. L. Abercrombie, Plant Superintendent
R.
E. Rogers,
Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
bcc w/encl:
NRC Resident
Inspector
R.
C. Lewis, Director
Division of Resident
and
Reactor Project Inspection
RII:RRPI
RII RRPI
IlCase:gr
Sullivan
8/2@81
~8/~/81
RII:ETI
RII:RRPI
Cantrel 1
~<81
'/~/81
RII'RRPI
PTayg or
8/N/81
RII
I
RCL v's
8/
1
4!~
~
~
w
,0
~ I <<
<<
~ "
~
~
=-
~
t
~
~