05000296/LER-1980-007-03, /03L-0:on 800301,after Offsite Power Was Restored to 4-kV Bus Tie Board,Short Period of Time Elapsed Before Reclosure of Bus Tie Boarder Feeder Breaker.Apparent Disagreement in Time Is Still Being Investigated

From kanterella
(Redirected from ML18024B442)
Jump to navigation Jump to search
/03L-0:on 800301,after Offsite Power Was Restored to 4-kV Bus Tie Board,Short Period of Time Elapsed Before Reclosure of Bus Tie Boarder Feeder Breaker.Apparent Disagreement in Time Is Still Being Investigated
ML18024B442
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/28/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18024B441 List:
References
LER-80-007-03L-02, LER-80-7-3L-2, NUDOCS 8004010402
Download: ML18024B442 (4)


LER-1980-007, /03L-0:on 800301,after Offsite Power Was Restored to 4-kV Bus Tie Board,Short Period of Time Elapsed Before Reclosure of Bus Tie Boarder Feeder Breaker.Apparent Disagreement in Time Is Still Being Investigated
Event date:
Report date:
2961980007R03 - NRC Website

text

LEAR REOLzz-ATORY COMMISSION NRC4F ORAN' P77l

'8 LICghlDEE EVENT QEpogT CONTROL BLOCK:

Qi tPLEASE PRINT OR TYPE ALLREQUIRED INFORMATIONI I

6

~01 A

Z 8

8 9

9 Q2 0

0 0

0 0

0 0

Q3 Q4~Q5 7,

8 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CON'T

~01 RE DRT ~LQB 0

5 0

0 0

2 9

6 7

0 3

0 1

8 0

B 0

3 2

8 8

0 00 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 During normal operation an ice storm caused the loss of offsite power to the 4 kQ bus tie board.

After offsite power was restored there was a short period of 4

0

~os time before reclosure of the bus tie board feeder breaker.

Reference Technical Specification 3.9.B.

The diesel generators started.

There was no danger to health an safety'f the public.

No previous occurrences.

~O7

~OB

~

80 7

8 9

7 8

SYSTEIII

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE g

~BB Q11 0

Q12

~zQ13 z

z z

z z

z 014

~O15 ~ 08 9

10'l 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER/Ro EVENT YEAR REPORT NO.

CODE TYPE NO.

Q11 8510111

~80

~

~00 7

21 2?

23 24 26 27 28 29 30 ACTION FUTURE EFFECT SHUTOOIYN ATTACHhlENT NPRDQ PRIME COMP.

COAIPONENT TAKEN ACTION ON PI.ANT METHOD HOURS +22 SUBMITTED FORM SUB.

SUPPLIER hlANUFACTURER Q18 ~z 018

~8020

~021 L000 ~01<

L~J O23

~NQ24

~z Q25 z

9 9

9

(

33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION ANDCORRECTIVE ACTIONS Q27 o

Loss of both 161-kV lines interru ted ower to coolin tower transformers and 4-kV switch ear feeding bus tie board.

The feeder breakers were reclosed.

The apparent 1

disagreement in time between return of 161-kV lines and reclosure of bus tie board 3

feeder breakers is still being investigated.

80 ME THDD OF DISCOVERY DISCOVERY DESCRIPTION 37 Q31 Events recorder printout 45 46 LOCATIONOF RELEASE QB NA 80 44 45 80 80 80 NRC USE ONLY offsite power 80 8

618 69 7

8 9

FACILITY STATUS 98 POWER OTHER STATUS Q 5

8 Q28 ~09 8

Q20 NA 7

8 0

10

'l2 I'I 44

, ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQB B

~Z Q33

~ZQ34 NA 7

8 9

10 11 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION A3

~00 0

Q31 ~ZQ38 NA 7

8 9

11 12 13 PERSONNE L INJURIES 7

8 9

11 12 LOSS OF OR DAMAGE To FACH.I TY Q43 TYPE

DESCRIPTION

g Z

Q42 NA 7

8 9

10 PUBLICITY ISSUED DESCRIPTION Q

~2n

~YQnn Local press notified of loss of 8

9 10 NAME OF PRF I ARFR PIIONF.

8 0<010 +

5

~

II r 'p(

'Tennessee Valley Authority Browns Ferry Nuclear Plant Form BF-17 BF 15.2 1/10/79 LER SUPPLEMENTAL INFORMATION BFRO 296 / 8 Technical Specification Involved

'i'eported Under Technical Specification Date of Occurrence 3/ /

Time of Occurrence Unit Identification and Description'of Occurrence:

Due to an ice storm both 161-kV lines were lost causing a loss of power to the cooling tower transformers and 4-kV switchgear feeding the bus tie 'board.

After offsite power was restored there was a short period of time before reclosure of the bus tie board feeder breakers.

Conditions Prior to Occurrence:

Unit 1 8 0% refueling outage Unit 2 9 0% cold shutdown Unit 3 8 98%

Action specified in the Technical Specification Surveillance Requirements met due

~to ino arabia ecLuipment.

Describe.

Regulatory Guide 1.93 allows, under certain conditions, continued operation at'ull or'reduced power for a limited time than to effect an immediate shutdown on the loss of required electric power sources.

Apparent Cause of Occurrence:

The loss of offsite power was due to the ice and wind storm.

Analv.",is ol'ccurrence:

There was no ctamage to plant equtpment.

There was no acttvttp release, no personnel exposure or in)ury and no danger to health or safety of the public.

Corrective Action

Offsite power was restored and bus tie board feeder breakers reclosed.

The apparent disagreement in time between return of offsite power and reclosure of feeder breakers is still being investigated.

Failure Data:

NA