05000296/LER-1980-001-03, /03L-0:on 791230,w/Unit 3 in Shutdown,Bus Tie Board Was de-energized for Startup.Caused by Feeder Cable Failure.Work in Progress to Bypass Bad Cable Sections

From kanterella
(Redirected from ML18024B291)
Jump to navigation Jump to search
/03L-0:on 791230,w/Unit 3 in Shutdown,Bus Tie Board Was de-energized for Startup.Caused by Feeder Cable Failure.Work in Progress to Bypass Bad Cable Sections
ML18024B291
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/25/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18024B290 List:
References
LER-80-001-03L-01, LER-80-1-3L-1, NUDOCS 8001290598
Download: ML18024B291 (4)


LER-1980-001, /03L-0:on 791230,w/Unit 3 in Shutdown,Bus Tie Board Was de-energized for Startup.Caused by Feeder Cable Failure.Work in Progress to Bypass Bad Cable Sections
Event date:
Report date:
2961980001R03 - NRC Website

text

ILNHC FIBRM 366 (7.77)

LICENSEE EVENT REPORT V. o. Evu n ncERME.nsun 2

~ LPEEEEEEEaaEMEv [001]

7 8

CON'T

~01 7

8 CONTROL BLOCK:

Qi (PLEASE PRINT OR TYPE ALLREQUIRED INFORMATIONI I

6 A

L B

E E

3 Q2 0

0 0

0 0

0 0 -

0 0

Q24 1

1 1

1 QE~QE 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 I.ICENSE TYPE 30 57 CAT 58

~LQB 0

5 0

0 0

2 9

6 7 l 2

3 0

7 9

QB 0

1 2

5 8

0 QB 60 61 DOCKET NUMBER 68 69 EVENT DATE 74

. 75 RFPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Qlo With unit 3 in a shutdown condition Technical S ecification 3.9.A.4.b does not allow

~03 startup with the Bus Tie'oard deener ized.

The Bus Tie Board was deenergized due to

~04 feeder cable failure.

There was no dan er to health or safety of public.

No redundant

~OS s stems.

No previous occurrences.

~OB

~07

~08 7

8 80 47 9

SYSTEM

CAUSE

CAUSE COMP VALVE CODE CODE SUBCODE COMPONENTCODE SUBCODE SUBCODE

~KB QTT

~EQ12

~AQ72 E

L E

0 0

N Q"

~ZQ"

~Z QEE 7

8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERPRO EVENT YEAR REPORT No.

CODE TYPE NO.

QET REP0RT

~80

~

~00 1

L~J

~3 LJ L

J

&0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDP PRIME COMP.

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED

'ORM SUB.

SUPPLIER MANUFACTURER

~CQIB ~Z Q19 'A Q20

~B Q2' 3

8 023

~~Q24

~L 02S T

3 33 34 35 36 37 40 41 42 43

'4 CAUSE DESCRIPTION ANO CORRECTIVE ACTIONS Q27 o

The feeder cable to the Bus Tie Board failed due to f

i s written and the work is in ro ress to install overhead b es b

sections.

Triangle, 500 HCM cable.

No recurrence control required.

METHOD OF DISCOVERY 44 45 44 45 NA!AEOF PREPARER 7

8 9

FACILITY STATUS

% POWER OTHER STATUS Q30

~75

~0 Q22 ~~~

0 Q22 NA 7

8 9

'IO 12 13 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQ3S Z

Q33 ~8 A

7 8

9 10'l PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39

~00 0

Q27 Z

QRR NA 7

8 9

11 12 l3 PERSONNEL INJURIES NUMBER OESCRIPTIONQ4i

~QO 0

QER NA 7

8 9

I 'I 12 LOSS OF OR DAMACE TO FACILITYQ TYPE

DESCRIPTION

9 Z

Q42 NA 8

9 10 PUBLICITY ISSUED DESCRIPTIONQ n

~Y Q44 Unit 3 outage 8

9 10 NA DISCOVERY DESCRIPTION Q32 LOCATIONOF RELEASE Q38 NRC USE ONLY 68 69 PHONE 8001890 80 80 80 80 80 80 vp EEa 2

80 g 0

IL

'Xs

I'

- I'<;nn<.."

~ ~':>I'.~ ~.'nti>< ~ >'it v lt> <s'i'<n~'rrv X"i>'ar I ls>Ill Form BF-17 DF 15."

1/10/79 I,I'.lt.'>ItI'I'l.l'.MI'.N'I'AI.INI'<~IIMA'I'IOiv 111'it<)-.'>0-296 / 80}

'I'e< hnical Spe<'ificati<>n Involv".d It(>I)ort(;

Dat<<nf Occut t ence l2/30/79 Time of 9ccurrence 2230 Unit Id<.ntifiration an<i I)( s< riI>tion <>I'ccurrence:

With unit 3 in a shutdown condition Technical Specifications do not allow startup with the bus tie board deenergized.

C<>n<li<i<>ns Prior to Occurrence:

Unit 1 8 82%.

Unit 2 8 97%.

Unit 3 8 0%.

A<:ti >n

.;><<<ilia>l i<>

II><; 'I'<<hni(;.'>I Sp<cification Surveillance Requirements met due to inon<<! util.< ( <iuiL>met>t.

I)<:s<:t'ibe.

Unit in shutdown condition.

Api>anent Cause

<rf Vccurret)cc:

The Bus-Tie-Board was deenergized due to feeder cable failure.

Attalvsis of Occur t (.nce:

There was no damage to plant equipment.

There was no activity release, no personnel exposure or ingury and no danger to health or safety of the public.

(;<>rt e< tiv(: Acti<>n:

An instruction has been written to install overhead cables to bypass the bad sections of cable.

I'ailur <

1);tt'<:

NA

'"1t<:t.< nti>>n:

!'<.r i(>(l -

l.it'< ti n(',

Heal>on:.il>ility - Administrative Supervisor

't(:v)~>">n i /

I j~

pl A

4 al