05000296/LER-1979-024-03, /03L-0:on 701208,following Return to Svc After Refueling,Excessive Local Leakage Detected at Southeast Drywell Equipment Hatch Door.Caused by Unevenly Tightened Bolts.Bolts Retightened

From kanterella
(Redirected from ML18024B227)
Jump to navigation Jump to search
/03L-0:on 701208,following Return to Svc After Refueling,Excessive Local Leakage Detected at Southeast Drywell Equipment Hatch Door.Caused by Unevenly Tightened Bolts.Bolts Retightened
ML18024B227
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/07/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18024B226 List:
References
LER-79-024-03L-01, LER-79-24-3L-1, NUDOCS 8001100427
Download: ML18024B227 (4)


LER-1979-024, /03L-0:on 701208,following Return to Svc After Refueling,Excessive Local Leakage Detected at Southeast Drywell Equipment Hatch Door.Caused by Unevenly Tightened Bolts.Bolts Retightened
Event date:
Report date:
2961979024R03 - NRC Website

text

NRCPORM 366 I7 fr/ "r LICENSEE EVENT REPORT CONTROL BLOCK:

I IPLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)

~01 7

8 CON'T

~01 7

8 02 0

0 0

0 0

0 0 -

0 9

LICENSEE CODE 14 15 LICENSE NUMBER 0

Qs 4

2 2

2 2 Q4~Qs 25 26 LICENSE TYPE 30 57 CAT 58 soURcE MLQ6 0

5 0

0 0

2 9

6 7

1 2

0 8

7 9 OBLI/ LLl)J-~~ OB 60 61 DOCKET NUMBER 6&

69 EVENT DATE 74

. 75 REPORT DATE 80 EVENT DESCRIPTION ANO PROBABLE CONSEQUENCES QIO With unit 3 at 200 HWe followin unit return to service after refueling outage excess-

~0 3

ive local leakage was detected at the south east drywell equipment hatch door.

The

~0 4

plant was operated'nder conditions permitted by T.

S. 4.7.A.2.h.(2).

There was no 6

danger to health or safety of the public; no previous occurrences.

~06

~08 7

8 9

80 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SU&CODE COMPONENT CODE SUBCODE SU&CODE

~ss

'SA Qhh

~A Qls

~C Qhs Z

Z 2

Z Z

Z Qls

~Z Q>s

~Z Qls 7

8 9

10 11 12 13 18 19 20 I

SEQUENTIAL OCCURRENCE REPORT REVISION LEAFAO EVENT YEAR REPORT No.

CODE TYPE NO, Q17 RssssT

~79

~

~02 4

~M

~03

~Z

~

0 21 22 23 24 26 27 28 29 30 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.

COMPONENT TAKEN ACTION ON PI ANT METHOD HOURS Q22 SUBMITTED FORM SUB.

SUPPLIER MANUFACTURER

'OIB~Q>>

~Q20

~AQ21 0

0 0

5

~YC231

~YO"

~ZQ26 Z

9 9

9 02 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVC ACTIONS Q27 o

East dr ell e i e

were reti htened and hatch assed LLRT.

Administrative controls are bein develo ed to incorporate additional verifications and to use a lock that will insure that the 3,

hatch is not disturbed without proper approval.

4 7

9 FACILITY STATUS sin POWER OTHER STATUS Q30 [iis] ~CQss ~02 0

Qss NA 7

8 9

'IO 12 44 ACTIVITY CONTENT AELEASEO OF RELEASE AMOUNTOF ACTIVITYQ36 6

Z Q3 Z Q34 NA 7

8 9

10 11 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q30 [ll7] ~00 0

Q>>

2 Qss NA 7

8 9

11 12 13 PFRSONNEL INJURIES NUMBER DESCAIPTIONQ41

~is I ~00 0

Qs NA 7

BI 9 11 12 LOSS OFOA DAMAGETOFACILITYQ43 TYPE DESCAIPTION

~IO

~ZQ42 NA 7

8 9

10 PUBI.ICITY ISSUED DESCAIPTIONQ 0

LNJQ44 NA 7

8 9

10 NABIE OF PREPARER 80 80 80 80 PHONE:

68 69 80 NRC USE ONLY 04 'f SD01 ~GO METHOD OF DISCOVEAY DISCOVERY DESCRIPTION Q32

~A Q31 Maintenance personnel observed 45 46 LOCATIONOF RELEASE Q NA 45

1 1

1

~

E.

Tennessee Valley Authority Bro~vns Ferry Nuclear Plant Fo(v'. BF-1'i BF 15.2

'/10/'l9 LER SUPPLEMENTAL INFOR&IATION BFRO-5G-

~Z6 /

7924 Technical Specification lnvolvec'.

T.S. 4.7.A,2.h.+2)

Reported Under Technical Specification 6.7.a.b~2 Dale nf Occurrence 12~879 Time of Occurrence 7:10~.u. linit.

3 Id<<ntification and De~seri tion'of Occurrence:

Excessive local leakage was detected at the east drywell equipment hatch door.

The plant was then operatdd under conditions permitted by T.S.

4. 7.A.2.h.(2).

Conditions Prior to Occurs ence:

Unit 1 8 970 MWe.

Unit 2 8 880 MVe.

Unit 3 9 200 MWe unit in test program following return to service after refueling outage.

A( tion speiifi(.d in the Technical Speeificatiori Siirveiilanc<< IIequirements tact (lue

'to 'nGQcra41'l c(lulPAl(,nt Dcs( i ioe.

Conformance to T.

S. 4.7.A.2.g was demonstrated within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> following detection of the excessive local leakage as per T.

S. 4.7.A.2.h.(2).

e "4

~A!arent Cause of Occurrence:

Leak around east equipment hatch seal due to unevenly tightened bolts.

Analvsis of Occurrence:

There was no danger to health or safety of the public, no activity release, no damage to plant equipment.

East equipment hatch was installed and initially failed a local leak rate test on ll/14/79.

The hatch was retorqued and passed the local leak rate test on ll/14/79. An. integrated leak rate test was conducted between 11/21/79, and ll/26/79, and no leakage was detected on the hatch.

No other work was performed-on the hatch until the subject occurrence on 12/8/79.

Correcti~. e Action:

Retightening of fasteners corrected leakage.

Developing administrative controls including detailed instructions and procedures which incorporate appropriate.signoffs and the use of a lock that will insure that the hatch is not disturbed without proper approval.

F(l tin rf! ()ata:

N/A

".R(at(:n'..on:

Po(iod

- Lifetime Rc.,ponsihility - Administrative Supervisor

l