Forwards IE Insp Repts 50-259/79-28,50-260/79-28 & 50-296/79-28 on 790917-20.No Noncompliance Noted
ML18024B115
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/09/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18024B114 List:
References
NUDOCS 7911270079
Download: ML18024B115 (4)


See also: IR 05000259/1979028

Text

~fl REOI

~4

~o

Cy

~ioO

+p*yW

In Reply Refer To:

RII:DSP

50-259/79-28

50-260/79"28

50-296/79-28

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

O<~ OS 51S

Tennessee

Valley Authority

ATTN:

H.

G. Parris

Manager of Power

500A Chestnut Street

Tower II

Chattanooga,

TN

37401

Gentlemen:

This refers to the inspection

conducted

by D. 'S. Price of this office on

September

17-20,

1979, of activities authorized by NRC Operating License

Nos.

DPR-33,

DPR-52 and DPR-68 for the Browns Ferry facilities, and to the

discussion of our findings held with H. L. Abercrombie at the conclusion of the

inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed inspection report.

Within these

areas,

the inspection consisted of

selective examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items 'of noncompliance

were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed

in the enclosed inspection report.

One new unresolved

item resulted

from this inspection

and is discussed in the

enclosed report.

This item will be examined during subsequent

inspections.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information.from public disclosure.

Any such

application must include

a full statement

o'f the reasons

on the basis of which

't is claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

I

4

Tennessee

Valley Authority

-2-

ggy 0g$ 7>

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

g.C.

R.

C.

ewis, Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

Inspection Report Nos

~ 50-259/79-28,

50-260/79-28

and 50-296/79-28

cc w/encl:

H. L. Abercrombie

Plant Superintendent

P. 0. Box 2000

Decatur,

AL

35602

D. E. McCloud, Project Engineer

400 Chestnut Street

Tower II

i

E'