ML18019A868
| ML18019A868 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/03/1986 |
| From: | Zimmerman S CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-1038, RTR-REGGD-01.127, RTR-REGGD-1.127 NLS-86-206, NUDOCS 8606060024 | |
| Download: ML18019A868 (7) | |
Text
<<6 REGULATORY INFORMATION DISTR IBU SYSTEN (R IDB)
ACCESSION NBR: 8606060024 DOC. DATE: 86/06/03 NOTARIZED:
NQ DOCKET FACIL:50-400 Sheav on Harv is Nucleav Power Plant>
Unit 1>
Cav olina 05000400 AUTH. NAi'1E AUTHOR AFFILIATION Zli'fNERI'fAN>S. R.
Cav olina Powev'c Light Co.
RECIP. NAIiE RECIPIENT AFFILIATION DENTQN, H. R.
Office of Nuclear Reactov Regulation.
Div ec tor (post 851125
SUBJECT:
Fov wav'ds addi info v.e implementation of Rev 1 to Reg Guide
- 1. 127>
"Insp of Water-Control structures Associated w/nuclear Power Plants. " SER (NUREQ 1038) wc Tech Specs should be v evised as indicated.
DISTRIBUTION CODE:
0001D COPIES RECEIVED: LTR J ENCL l SIZE:
TITLE: Licensing Submittal:
PBAR/FBAR Amdts Zc Related Correspondence NOTES: Application for permit renewal filed.
05000400 RECIPIENT ID CODE/NAI'1E PNR-A ADTB PNR-A ElCSB PNR-A PD2 LA BUCKLEY> B 01 PNR-A RSB INTERNAL: AD1'1/LFf'fB IE FILE IE/DGAW'/GAB 21 NRR PNR-A ADTS NRR RQE> i'f. L NRR/DHFT/ifTB R('N2 EXTERNAL: 24X DNB/DSS
( Ai'1DTS )
iNRC PDR 02 PNL CRUEL> R COPIEB LTTR ENCL 1
2 2
2 2
1 0
1 1
1 0
1 1
3 3
1 1
REC IP IENT ID CODE/NAi~fE PWR-* EB PWR-A FOB PWR-A PD2 PD PWR-A PSB ELD/HDSi IE/DEPER/EPB 36 NRR BWR ADTS NRR PWR-B ADTS N
H FIB 04 RN/DDANI /1'fIB BNL(AMDTS ONLY)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
1 1
1 0
0 0
1 1
0 1
1 1
TOTAL NUi'1BER OF COPIES REQUIRED:
LTTR 34 ENCL 28
Oy I
). ~s',)..".l'.') g f/
5* t:) )
" "I
',)," >>r)<<>>1
I 1
'I I
E:
I'El 5
i'l <<
IC I 5'l
'I;,ti ",
'-,5 5)~
).
l ) Ii'yC
)I
'E'l <<5
)$ I., >>),"
I'!I'5 5
ll
)
55
"<<3
&)". )")Il
)I )'f
, I <<~<<)~.I.
$ 'l<<<<
1'
<<<<f, I <<<<f I p Il',,
'.5 r
I I
+tr.l~"
$ <<1 I.I.C I
I 5
<<<.~ie f <
PROOF Ai90 REEVE COPY PROCEDURES AND PROGRAMS Continued c.
Seconda Water Chemist Continued IIQI&h.t-F 9 eels d.
6.
A procedure identifying (a) the authority responsible for the interpretation of the data and (b) the sequence and timing of administrative events required to initiate corrective action.
Backu Method for Determinin Subcoolin Mar in e.
A program that will ensure the capability to monitor accurately the Reactor Coolant System subcooling margin.
This program shall include the following:
\\
l.
Training of personnel, and 2.
Procedures for monitoring.
Post"Accident Samolin A program that will ensure the capability to obtain and analyze, under accident conditions, reactor coolant, radioactive iodines and particulates in plant gaseous effluents, and containment atmosphere.
samples.
The program shall include the following:
1.r Training of personnel, 2.
Procedures for sampling and analysis, and 3.
Provisions for maintenance of sampling and analysis equipment.
f.
Ins ections of Water Control Structures A program to implement an ongoing inspection program in accordance with Regulatory Guide 1.127 (Revision 1, March 1978) for the main and auxiliary dams, the auxiliary separating dike, the emergency service water and discharge
- channels, and the auxiliary reservoir channel.
The program shall include the following:
iqtake The provisions of Regulatory Guide 1.127, Revision 1, to be implemented as a part, of plant startup operations.
2.
Subsequent inspections at yearly intervals for at least the next 3 years.
If adverse conditions are not revealed by these inspections, inspection at 5-year intervals will be performed.
SHEARON HARRIS " UNIT 1 6-19