ML18019A802

From kanterella
Jump to navigation Jump to search
Forwards marked-up FSAR Pages,Clarifying Compliance W/Reg Guide 1.68,App a Re full-operational Test at 100% of Rated Load on Cranes Handling Irradiated Fuel.Test Involves Use of Dummy Fuel Assembly & Dummy Rod Cluster Control Assembly
ML18019A802
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/01/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.068, RTR-REGGD-1.068 NLS-86-120, NUDOCS 8605060135
Download: ML18019A802 (4)


Text

CME Carolina Power & LIght Company SERIAL: NLS-86-120 SN Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET. NO.50-000 MANIPULATORCRANE TESTING

Dear Mr. Denton:

Carolina Power 2 Light Company (CPttt:L) hereby submits clarification concerning the Shearon Harris Nuclear Power Plant (SHNPP) compliance with Regulatory Guide 1.68, Appendix A, Paragraph I.m.0. This regulatory guide paragraph provides guidance that a full-operational test at 100 percent of rated load be conducted on cranes which are used to handle irradiated fuel.

CPtlt:L will comply with this guidance by conducting a full-operational test of the SHNPP manipulator crane using the Dummy Fuel Assembly and the Dummy Rod Cluster Control Assembly (RCCA). The dummy assemblies weigh approximately 98.7 percent of the weight of an actual fuel assembly and RCCA. Although the load rating of the SHNPP manipulator crane exceeds the weight of a fuel assembly and RCCA, the maximum critical load as defined in NUREG-0550 would be the weight of a fuel assembly and RCCA. Testing of the manipulator crane using anything other than the Dummy Fuel Assembly and the RCCA is impractical due to the manipulator crane design which incorporates a mast feature, which will not allow it to lift objects which 8o not have physical dimensions and features similar to a fuel assembly.

CPRL considers testing of the manipulator crane using the Dummy Fuel Assembly and RCCA as an acceptable method of complying with the guidance of Regulatory Guide l.68. Attached are draft FSAR pages which are marked up to reflect this clarification. These pages will be incorporated into a future amendment of the SHNPP FSAR.

If you have any questions or concerns about the clarification provided above, please contact me as soon as possible.

Yours very truly, Manager Nuclear Licensing Section 3HE/pgp (36633DK)

Attachment Cci Mi. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. O. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. 3. H. Carpenter (ASLB)

Mr. H. B. Clayton (NRC) Mr. 3. L. Kelley (ASLB)

Wake County Public Library ppl 8605060135 860501 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602

(

PDR ADOCK 05000400 A FDR

I

~y l

I K

h

)I

L4.2.i ~ ~",ANCE OF TEST PROCRAHS WLTH REGULATORY GU;DFS The fo!.

deveLop -..--

.'! :""t:cabl,e eegulatory initial tesc guides wi Program:

ll be used as avoidance a) fez '. !c:".y Guide 1.20, Rev'. 2, May, 1,976, Com rehensi;e Vibration Assessment Pzo ram for Reactor internals'Durin Peep eracionai. and Lni:ial Startu Testin b) Regulatoey Guide 1.37, Rev. 0, March, L973, Quality Assurance Re uirements foe CLeanin of FLuid S seems and Associated Components of Wacee-Cooled Nuclear Plants.

c) ReguLatory Cuide l..41, Rev. 0, Harch, 1973, Prep erationaL Testin of Redundant On"Site Electric Power S seems to Verif Pro er (.oad Grou d) Regulatory Guide L.52, Rev. 2, Narch, 1978, Desi n, Testin , and

'Maintenance Criteria foe En ineered - Safec " Feature Atmos here Cleanu S stem Air Filteacion and Absoe tion Units of Li ht"Water-Cooled Huclear Power Plants')

ReguLatoey Guide 1.68, Rev. 2, Augusc, 1978, Initial Tesc Peo cams Nuclear Powee Pl.ants. foe'ater"Cooled Clarif icat ions/Exce tions Ap~< /l Pgqprwgl! I rn. 9.

~~Acc(

g~ C~o~. v~ ~

n f) Regulatory Guide 1.68.2, Rev. 1, July, L978, [nitiaL Staecu Test Pe'o e'am to Demonstrate Remote Shutdown Ca abil,it foe'ater"Cooled Nuclear Power Plants.

14.2.7-1 Amendment No. 22

~ ~ ~ ~

i> .";~~i~iaL* ac

'i c...' ed

~1 crena. pass..~ .i l >ad -..sC i:inc tn.

..i.n..~ipuLatoc...c r <<ne . i

'~=r. inc. Ln- accordance with Regulatory Guide r~

.'ea rms-L.L04-

~

pe=cent w ~ C ot'ated. Load for static test and 100 pw~~~

T~ <'~p JM G,~ pa.sses

/

( f) g~~

') a.>>i) H~ Q ~ 4<i~WIg

$ ~~ 8n JyL Da~ ~ AISLE M c~oz&w, t~~(.4,g C~~, g.gf n

~ ~~

"QAe:L~y

~~ gJ ~JJCIACV W~ 4 A~khAj gl 0

'i'~

~~~ 4,6 g (o 'l~;f 8-M la~.

pM5'j

)~ fl ~ ~ g ~ ~

Fuel handling equipment including any protecti re interlocks and s 1 c y devices operate in accordance Mith the FueL Transfer System Technical,'manual, Mestinghouse Electric Corporation and the .'manipulator Crane Technical Hanuzl, St.earms"Rover,

! ncor poraced.

Amendment No. 23 L4.2.12-38