Forwards Insp Rept 50-400/86-10 on 860210-14.No Violations or Deviations Noted
ML18019A670
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/18/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18019A672 List:
References
NUDOCS 8603240187
Download: ML18019A670 (2)


See also: IR 05000400/1986010

Text

MARl 8>86

carolina

Power

and Light Company

ATTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-40

6-10

On February

10-14,

1986,

NRC inspected activities authorized

by

NRC Construction

Permit

No.

CPPR-158 for your Shearon

Harris facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with

those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Vincent W. Panciera,

Chief

Reactor Projects

Branch

2

Division of Reactor

Projects

Enclosure:

Inspection

Report

No. 50-400/86-10

c

. w/encl:

. A. Watson,

Vice President

Harris Nuclear Project

4.

M. Parsons,

Project General

Manager

L. Willis, Plant General

Manager

byc w/encl:

NRC Resident

Inspector

Document Control

Desk

State of North Carolina

f

.8~0S2<0>87

PDR

ADOCK

8

8603i8. '>

05000400

PDR

"";,

RII

PTayl r:jw

g/gp,/86

yg

P//8/86

RIIyg

AHergt

~ g/ p//86

tl

iC~i~

V

pl

l'

l

I