Forwards Insp Rept 50-400/85-49 on 851120-1220 & Notice of Violation.Dissenting Comments Claiming Error Would Probably Be Discovered Through Sys Walkdowns or Other Licensee Actions Reviewed
ML18019A539
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/14/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18019A540 List:
References
NUDOCS 8601270443
Download: ML18019A539 (3)


See also: IR 05000400/1985049

Text

0

JAN lc ]gag

Carolina

Power 'and Light Company

gNTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-49

On

November

20

December

20,

1985,

NRC conducted

an inspection

of activities

authorized

by

NRC Construction

Permit

No.

CPPR-158

for your

Shearon

Harris

facility. At the conclusion of the inspection,

the findings were discussed

with

those

members of your staff identified in the enclosed

inspection report.

a

Areas

examined during the inspection

are identified in the report.

Within these

'reas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

The inspection

findings indicate that certain activities violated

NRC require-

ments.

The violation, references

to pertinent

requirements,

and elements

to be

included in your response

are presented

in the enclosed

Notice of Violation.

Dissenting

comments

made at the inspection exit which claimed that this finding

was

not

a violation due to the fact that the error would probably

have

been

discovered

through

system

walkdowns or other licensee

initiated actions,

have

been

reviewed-.

Our position is that

having the ability to possibly identify

drawing errors after-the-'fact

does

not negate

the responsibility to ensure

that

affected

drawings

are

maintained

current

with respect

to

completed

design

changes.

The

responses

directed

by this letter and the enclosures

are not subject to the

clearance

procedures

of the Office of Management

and

Budget

issued

under the

Paperwork

Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Original signed

by

Virgil L. Brownlee for

Roger

D. Walker, Director

Division of Reactor Projects

Enclosures:

(See

page 2)

.asoaa7oees

asoaa4

P'I

PDR 'DOC)C'05000400

6

PDRI I"

>Ed I

~r

Carolina

Power

and Light Company

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No. 50-400/85-49

cc w/encls:

. A. Matson,

Vice President

Harris Nuclear Project

p.'.

Parsons,

Project General

Manager

L. Willis, Plant General

Manager

bye w/encls:

MRC Resident

Inspector

Document Control

Desk

State of North Carolina

LM lien

1+ /86

R

P

P redrickson

1/g/86

RII

1

pgw~

1/

/86