ML18019A441

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/85-32 on 850812-16 & Notice of Violation
ML18019A441
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/11/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18019A442 List:
References
NUDOCS 8511010431
Download: ML18019A441 (4)


See also: IR 05000400/1985032

Text

Spp g 1 }985

Carolina

Power

and Light Company

/ATTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-32

On August 12-16,

1985,

NRC inspected activities authorized

by

NRC Construction

Permit

No.

CPPR-158

for your Shearon

Harris facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with

those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

The inspection

findings indicate that certain activities violated

NRC require-

ments.

The violations, references

to pertinent requirements,

and elements

to be

included in your response

are presented

in the enclosed

Notice of Violation.

The

responses

directed

by this letter and the enclosures

are not subject to the

clearance

procedures

of the Office of Management

and

Budget

issued

under

the

Paperwork Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Skylab'en j', Neij e Po~

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No. 50-400/85-32

F

  • 'PA@'V1i

c w/encls:

R. A. Watson,

Vice President

~ Harris Nuclear Project

~g.

M. Parsons,

Project General

Manager

v'J.

L. Willis, Plant General

Manager

bcc w/encls:

(See

page

2)

851 101 0431 '5091 1

'DR

ADDCK 05000400

8

PDR

2:EOI

~ ~

I

~

Carolina

Power and Light Company

SEP l. 1 1985-

c w/encl s:

RC Resident

Inspector

Document Control

Desk

State of North Carolina

RII

MDHunt:jw

4jf/( tSR

EConl on

/

/85

RII P

RFerdt

/io/85

iQ~~~

Wg