Notice of Violation from Insp on 850812-16
ML18019A444
Person / Time
Site: Harris 
Issue date: 09/11/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18019A442 List:
References
50-400-85-32, NUDOCS 8511010434
Download: ML18019A444 (2)


Text

ENCLOSURE 1

NOTICE OF VIOLATION Carolina Power and Light Company Shearon Harris Docket No. 50-400 License No., CPPR-158 The following violation was identified during an inspection conducted on August 12-16, 1985.

The Severity Level was assigned in accordance with the NRC Enforcement Policy ( 10 CFR Part 2, Appendix C).

10 CFR 50.54(a)( 1) requires the licensee to implement the quality assurance program described or referenced in its Safety Analysis Report.

Section 17.2. 14 states that measures are established for indicating the operating status of structures, systems and components.

Contrary to the

above, the heaters for charging/safety injection pump 1B motor were found deenergized but the heater disconnect switch was not tagged and the heaters for charging/safety injecting pump 1C motor were found inoperative but not identified as such.

This is a Severity Level V violation (Supplement II).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violation; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.