ML18019A386
| ML18019A386 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/13/1985 |
| From: | Zimmerman S CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM NLS-85-331, NUDOCS 8509230296 | |
| Download: ML18019A386 (3) | |
Text
REGULAlY INFORMATION DISTRISUTIO>>YSTEN (RIDE)
>>'CCESSION NBR;8509230296'OC DATE: 85/09/,13 NOTARIZED'O FACIL:50 400 Shearon Harris Nuclear Power>> Planti Unit li Carolina AUTH ~ NAME>>
AUTHOR AFFILIATION ZIMMKRMANiS, R ~
Car o l ina Power 8 Light Co ~
RECIP ~NAME'EC1P IENT AFF IL>>IATION DENTONiH,R<
Offi ce-of Nuclear Reactor Regul ationi Oir ector
SUBJECT:
Provides addi info re ability to p)ace plant in cold.
shutdown. condition'onsidering limiting single failureiper
'SER Confirmatory Item 36 re steam generator tube ruptures Depr essurization utilizes auxiliary spray line.
DISTR'IBUTION CODE ~'00 1 D COP IES RECEI VED: L>>TR ENCL SIZE:
TITLE': Licensing Submittal:
PSAR/FSAR Amdts-8, Related Correspondence NOTES:
DOCKET 05000400 RECIPIENT IO CODE/NAME."
NRR/OL/AOL NRR L83 LA INTERNAL'; ACRS ELD/Hosi IE/DEPER/EPB 36 NR" ROEiM ~ L NRR/OE/CKB 1 1 NRR/DE/EQB 13 NRR/OE/MEB 18 NRR/OE/SAB 24 NRR/OHFS/HFEB40, NRR/OHFS/PSRB NRR/DSI/AEB:
26 NRR/DSI/CPB 10 NRR/OSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23T RGN2 EXTERNAL.; 24X OMB/OSS (AMOTS)
NRC PDR 02;;
PNL GRUELiR COPIES LTTR ENC 1
1 6
1=
1 1
1 1 ~
1 1
1 1-1>>
3 II 1
1 l>>
1 L
RECIPIENT IO. CODE/NAME NRR" LB3 BC BUCKLEY'S 01 ADM/LFMB IE FILE IE/DQAVT/QAB21-NRR/DE/AEAB NRR/DE'/EHEB NRR/OK/GB 28 NRR/DE/MTEB.
17 NRR/DE/SGEB 25 NRR/OHFS/I QB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DSI /CSB 09=
NRR/DSI/MKTB 12 NR RAB 22 G: FILh 04
/MI8 BNL(AMOTS ONLY)
LPDR 03 NSIC 05*
COPIES LTTR ENGL 1
1 1
1 1
1 1
2 1
1 1
1 1
1 1
1 1
TOTAL NUMBER>> OF COPIES REQUIREOs L'TTR 52 ENCL>
I<<C 1
'1 C
It
)
H
<<l JJ I 0<<I Il, 1<<)
i",I I 1 H)t H l II H
II H
r1I.M) I '))H
)C IMH"HI
~
~
~
" ~
M Ml ii<<
ll A
r 1
H g
'I l>>r t Ii 4
1 H'
<< f 1,
I<<9
~ Crt t
<<11 H li M
H 1<<.r
'Itt" 1 4 Cff i)HH H
"II r
)
li V
~
1 NIH>>t
)1 r>>I
'1 H
II Ir H 'l Ht I
1 H
. Ii
/
>>')
II lf>>,fy I.,
t
.I M
H H
1
~ ~LI t t
'MII t)C <<1" II., 1'I I H
I
'I Wi'<< "t)1 tstV
.jl)h M CI I'
I II
)K HI $
>>H II i il I,
I HH l >>
M 1 I' I
'll, Hg' ti H
)
CIGAR Carolina Power & Light Company Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SERIAL: NLS-85-331 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.
1 - DOCKET NO.50-000 COLD SHUTDOWN CAPABILITY
REFERENCE:
CPRL letter from M. A. McDuffie (CP&L) to H. R. Denton (NRC),
LAP-83-350 dated August 11, 1983.
Dear Mr. Denton:
Carolina Power dc Light Company (CP&L) submits additional information regarding the Shearon Harris Nuclear Power Plant (SHNPP) ability to place the plant in a cold shutdown condition considering a limiting single failure. This information is also pertinent to Safety Evaluation Report Confirmatory Item 36, regarding steam generator tube rupture.
This submittal is made at the request of a Reactor Systems Branch reviewer specifically requesting information on suitable plant systems to provide the function of depressurization to achieve a cold shutdown condition.
The reference letter also discusses this subject in response to DSER Open Item 09.
For SHNPP, the primary means of Reactor Coolant System (RCS) depressurization (considering a limiting single failure) is by utilizing the pressurizer auxiliary spray line, which is a portion of the Chemical and Volume Control System.
The fluid flow path is via the centrifugal charging pumps and the auxiliary spray valve to the pressurizer.
The normally closed auxiliary spray valve fails closed on loss of air, but willbe readily accessible to operating personnel and can be opened in 0-6 hours by using a pressure regulated portable air supply.
The backup means of RCS depressurization is via the pressurizer power-operated relief valves (PORVs).
These valves have been demonstrated operable under seismic and post-seismic conditions under the Westinghouse pump and valve operability program.
Additionally, a SHNPP specific PORV was tested under the EPRI operability and reliability test program (NUREG-0737, Item II.D.l).
If you have any questions, please contact Mr. Gregg A. Sinders at (919) 836-8168.
850q2SoaqS 8509<~
PDR ADOCN, 05000400,,
E PDR GAS/ccc (1800GAS)
Yours very truly, S. R im erman a
ger Nuclear Licensing Section CC:
Mr. B. C. Buckley (NRC)
Dr. 3. Nelson Grace (NRC-RII)
Mr. B. Mann (NRC-RSB)
Mr. T. Marsh (NRC-RSB)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. B. Shearon (NRC-RSB)
Mr. Travis Payne (KUDZU)
Wake County Public Library Mr. Daniel F. Read (CHANGE/ELP)
Mr. Wells Eddleman Mr. 3ohn D. Runkle Dr. Richard D. Wilson Mr. G. O. Bright (ASLB)
Dr. 3. H. Carpenter (ASLB)
Mr. 3. L. Kelley (ASLB) 411 Fayettevitte Street o P. O. Box 1551 o Raleigh, N, C. 27602