ML18018B931
| ML18018B931 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/02/1985 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18018B932 | List: |
| References | |
| NUDOCS 8505210103 | |
| Download: ML18018B931 (2) | |
See also: IR 05000400/1985013
Text
4,
APR
2 1985
Carolina
Power and Light Company
ATTN:
Mr.
E.
E. Utley
Executive Vice President
Power
Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-13
On
March 18-22,
1985,
NRC inspected activities authorized
by
NRC Construction
Permit
No.
CPPR-158 for your Shearon
Harris facility. At the conclusion of the
insp'ection; the f'indings were discussed
with those
members of your s'taff identi-
fied in'the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress...
Within the
scope of the inspection,
no violations or deviations
were identified.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/85-13
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
R.
M. Parsons,
Project General
Manager
bcc w/encl:
NRC Resident
Inspector
Document Control
Desk
State of North Carolina
SPg2f Pi03
p50OPOOO
85O402
AD'
pDR
8
+Taylor:cdg
03)y /85
RII
FJap
03/p//85
RII
AHardt
03/gg/85
~i
~
c A.
A4'.