Forwards Insp Rept 50-400/85-13 on 850318-22.No Violations or Deviations Identified
ML18018B931
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/02/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18018B932 List:
References
NUDOCS 8505210103
Download: ML18018B931 (2)


See also: IR 05000400/1985013

Text

4,

APR

2 1985

Carolina

Power and Light Company

ATTN:

Mr.

E.

E. Utley

Executive Vice President

Power

Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-13

On

March 18-22,

1985,

NRC inspected activities authorized

by

NRC Construction

Permit

No.

CPPR-158 for your Shearon

Harris facility. At the conclusion of the

insp'ection; the f'indings were discussed

with those

members of your s'taff identi-

fied in'the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress...

Within the

scope of the inspection,

no violations or deviations

were identified.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/85-13

cc w/encl:

R. A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons,

Project General

Manager

bcc w/encl:

NRC Resident

Inspector

Document Control

Desk

State of North Carolina

SPg2f Pi03

p50OPOOO

85O402

PDR

AD'

pDR

8

+Taylor:cdg

03)y /85

RII

FJap

03/p//85

RII

AHardt

03/gg/85

~i

~

c A.

A4'.