Requests Meeting W/Nrc to Discuss Util Need for Early Approval of 850114 Exemption Request Re Elimination of Postulated Pipe Breaks in RCS Primary Loop,Per Generic Ltr 84-04
ML18018B881
Person / Time
Site: Harris 
Issue date: 02/01/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
GL-84-04, GL-84-4, NLS-85-042, NLS-85-42, NUDOCS 8502080212
Download: ML18018B881 (6)


Text

REGULATD INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:8502080212 DOC,DATE: 85/02/01 NOTARIZED:

NO FACIL>50-400 -Shearon,Harris Nuclear Power Pl anti Unit li Carol ina AUTH BYNAME'.

AUTHOR AFFIl IATION ZIMMERMANrS,R, Carolina Power L Light Co.

RECIP ~ NAME RECIPIENT AFFILIATION KNIGHTONiG ~

Licensing Branch 3

SUBJECT:

Requests meeting w/NRC-to discuss util need for early approval of 850114 exemption request re elimination of postulated pipe breaks in RCS primary loopiper Generic'tr 84-04, DISTRIBUTION CODE:

8001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Licensing Submittal:

PSAR/FSAR Amdts L Related orrespondence NOTES:

DOCKET 05000400

-RECIPIENT

. ID CODE/NAME NRR/OL/ADL NRR L83 LA INTERNAL: ACRS 41 ELD/HDS1 IE/DEPER/EPB 36 NRR ROEgM ~ L

. NRR/OE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/OE/SAB 24 NRR/DHFS/HFEB40 NRR/OHFS/PSRB NRR/DS I/AEB 26 NRR/OS I/CPB 10 NRR/DSI/ICSB 16

'RR/DS I/PSB 19 NRR/OSI/RSB 23 RGN2 EXTERNAL: BNL(AMDTS ONLY)

LPDR 03 NSIC 05 COPIES LTTR ENC 1

1 6

1 1

1 1

2 1

1 1

1 1

1l 1*

II RECIPIENT IO CODE/NAME NRR L83 BC BUCKLEYrB 01 ADM/LFMB IE FILE IE/DQASIP/QA821 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/OHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRR/DS I/METB 12 NRR/DSI/RAB 22 G FI 04 RM/DDA

/MIB OMB/DSS (AMDTS)

NRC PDR 02 PNL GRUELrR COPIES LTTR ENCL 1

1 1

1 1

1 2

1 1

1 1

1 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 51 ENCL

V CS

%i

,~

t I: ~

CRQ6 Carolina Power & Light Company FEB 0<

F985 SERIAL:

NLS-85-042 Hr. George Knighton, Chief Licensing Branch 83 Division of Licensing United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.

1.

DOCKET NO. 50-400 ELIMINATIONOF POSTULATED PIPE BREAKS IN THE REACTOR COOLANT SYSTEM PRIMARY LOOP EXEMPTION REQUEST

REFERENCES:

(1)

Letter, A. B. Cutter to H.

R. Denton dated January 14, 1985,

Subject:

"Elimination of Postulated Pipe Breaks in the Reactor Coolant System Primary Loop Exemption Request."

(2)

Letter, S.

R.

Zimmerman to H. R. Denton dated November 30, 1984,

Subject:

"Elimination of Postulated Pipe Breaks in Primary Hain Loop and Arbitrary Intermediate Pipe Breaks in Class 1,

2, and 3 Pipes."

(3)

Letter, D.

G. Eisenhut to PWR Licensees da'ted February 1,

1984,

Subject:

"Safety Evaluation of Westinghouse Topical Reports Dealing with Elimination of Postulated Pipe Breaks in PWR Primary Main Loop (Generic Letter 84-04)."

Dear Mr. Knighton:

SUMMARY

Per our conversation, CP&L requests a meeting as soon as possible with NRC management to discuss our need for early NRC approval of our exemption request (per Reference

1) which will allow removal of primary loop whip restraints.

BACKGROUND CP&L provided in References 1 and 2 substantiating documentation and requested an exemption to

10CFR50, Appendix A, criterion 4, with respect to asymmetric blowdown loads resulting from discrete breaks in the RCS primary loop.

This documentation was prepared using the guidance of Generic Letter 84-04 (Reference

3).

Based upon the technical confidence and industry justification for this exemption request and the long-term man-rem savings due to increased

access, CP&L is in the process of simplifying the inefficient design and cumbersome construction imposed by the loop whip restraints.

The simplified design concept starts with removal of the whip restraints located in the primary shield wall.

egOROi

>O~PBOQl'Ro>PPP PPO Qg +90~

POP rayettevilte Street

< P, O. Box 1551 o Raleigh, N. C. 27602 gnoi rlO

I h

h g

~

I E

C h h

~ -

c 1

~

The Company's design/construction schedule requires that our exemption request be processed as quickly as possible.

To help in this regard, CPGL proposes a

CP&L/NRC management meeting as soon as possible.

Please contact me as soon as such a meeting can be scheduled.

Thank you for your cooperation.

Yours very truly, BZ S.

R.

erman, Manager Nuclear Licensing Section SRZ:DCM:wc (1110SRZ)

CC:

Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr. J.

P. O'Reilly (NRC-RII)

Mr. Travis Payne (KUDZU)

Mr. Daniel F.

Read (CHANGE/ELP)

Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB)

~

4.'i

-ll I

4 I

4 C

~ f F.

4 I

~

4 P

F.

4 4

4 4