Amend 3 to CPPR-158,reflecting Name Change of co-owner to North Carolina Eastern Municipal Power Agency
ML18018B699
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/11/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18018B700 List:
References
NUDOCS 8407060371
Download: ML18018B699 (4)


Text

CAROLINA POWER

& LIGHT COMPANY NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 AMENDMENT TO CONSTRUCTION PERMIT Amendment No.

3 Construction Permit No.:

CPPR-158 1.

The Nuclear Regulatory Commission (the Commission) having found that:

A.

The application for amendment filed by Carolina Power

& Light Company dated August 1, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as

amended, and the Commission's regulations set forth in 10 CFR Chapter I; B.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and C.

The issuance of this amendment will not result in any environmental impacts not previously considered.

2.

Accordingly, Construction Permit No.

CPPR-158 is amended to reflect a name change as follows:

A.

Revised paragraph 1.B as follows:

The Carolina Power

& Light Company and North Carolina Eastern Municipal Power Agency (the applicants) have described the proposed design of the Shearon Harris Nuclear Power Plant, Unit 1 (the facility), includ-ing but not limited to the principal architectural and engineering criteria for the design and have identified the major features or components incorporated therein for the protection of the health and safety of the public; SOO70eoWi eOOSSS PDR ADOCK 05000400 A

PDR

I 4

4 I 4 44 0

1 44

'4 4>l I ~

I' lI I

t K

I 4

~

4 I

N 4 II

~ 4 It I

4 4 4

~

1 4 I 4

-~l ttt 4

1' I '4 4

1 4

I 4 IIN

~

4

Ii B.'evise paragraph 2 as follows:

Pursuant to Section 103 of the Atomic Energy Act of 1954, as amended (the Act), and Title 10, Chapter I, Code of Federal Regulations, Part 50, "Licensing of Production and Utilization Facilities," and

'pursuant to the Initial Decision of the Atomic Safety and Licensing Board, dated January 23, 1978, the Nuclear Regulatory Commission, hereby issues a construction permit to the applicant for a utilization facility designed to operateat a core power level of 2775 megawatts thermal as described in the application and amendments thereto (the application) filed in this matter by the applicants and as more fully described in the evidence received at the public hearing upon that application.

The facility, known as the Shearon Harris Nuclear Power Plant, Unit I will be located on the applicants'ite about 16 miles southwest of the nearest boundary of Raleigh in Wake and Chatham

Counties, North Carolina.

Whereas the Carolina Power 8 Light Company and North Carolina Eastern Municipal Power Agency, as co-owners, will share in the ownership of the faci,lity, the Carolina Power 5 Light Company shall retain exclusive responsibility for the design and construction of the facility.

3.

This amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION q QR Date of Issuance:

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation LB83 DL.

t3 yt BBuckley

/84 6/P/84 E

DL P3 Gl.

i gh ton'/gw/

4 6/> /84 DL: /

MNovak

/ 9/84

DIR Eisenhut (f/B4

r l

I 4 Il jj 'j Ra 1

jf.

R I R jh'R R

" Ijf WIR'

~

R

~

I RR" 0 jf

~

I

~

t f

N I,

~,

~,>

1,$

I R "l

0

'fIR'"'f(

"Ii jf A

1 C

1'I h I"'l R

f'

~

R R,

,1',

'I

$ R R ~ -

f jj(jj h

R jh ~'l 1

I Rlth I

R e

R

~