ML18018B502
| ML18018B502 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/02/1983 |
| From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| LAP-83-559, NUDOCS 8312090233 | |
| Download: ML18018B502 (6) | |
Text
'REGULATORY )QORNATION DISTRISUTION 'SYS
) (RIDS)
ACCESSION NBR 8312090233 DOC DATE: 83/12/02 NOTARIZED:'O DOCKEiT' FACIL:50 400 Shearon Hanris Nuclear Power Planti Unit, ii -Carolina 05000000 SQ 001 Shearon Harris Nuclear Power Planti Uni,t 2'i Carolina*
05000401
'AUTH~ NAME AUTHOR AFFILIATION McDUFFIE<MA,
'.car ol ina),Pow'er 8 light co ~
. REC IP G NAME, RECIPIENT AFFIL'IATION DENTOf4iH,R>
Officei of Nuclear'eactor Regul ationg Director
SUBJECT:
Forwards nesponse tto NRC request for addi "info re draft SER open item on"steam, genet ator mods.Steam-gener ator -inser vice insp wil'.1 'include samples of expanded tubes.as special
)subset) of insp.
DI'STRIBUTION 'CODE:
80018
.COPIES RECEIVED !LTR ENCL,,
SIZE:,
-TITLE! Licensing 'Submittal i-,PSAR/FSAR Amdts 8, Related Correspondence NOT)ES; RECIPIENT ID CODE'/NAMEj
,NRR/DL/ADL NRR LB3 LA INTERNAL: ELD/HDS1 IE/DEPER/EPB 36'E'/DEQA/QAB21 NRR/DE/CEB ll, NRR/DE/EQB 13A NRR/DE/MEB 18.
NRR/DE/SAB 24 NRR/DHFS/HFEBOQ, NRR/DHFS/PSRB NRR/DSI'/AEB'6 NRR/DSI/CPB 10-NRR/DSI'/I'CSB 16 NRA/DSI/PSB 19 NRR/DS I/RSB 23Y RGN2
)COPIES l.TTR ENCL 1
0 1
0 1
0 1I3 1
1 1
1 2'
1 1
1=
1 1
1 1
1 1
1 1
1 1
1 1
1 3~
RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEY,B 01 IE F
ILE'E/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32'RR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DSI/METB 12
-DSTFRA 22'0 RM/DDAMI /MIB COPIES LTTR ENCL' 0
1 1
1 1-1 1
-0 1
1 2
2 1
1 1
1 1
1 0
1 1
1,1 1
i 1
1 1
1 1
0 EXTERNALS,ACRS 41 6
6 DMB/DSS (A'MOTS) i 1
1 LPDR 03:
NSIC 05,1 1
BNL(AMDTS ONLY)
FEMA~REP DIV 39 NRC PDR Q2'TIS 1
1 1
1 1
1 1
1
- TOTAL NUMBER OF )COPIES REQUIRED G L'TTR 53 ENCL 46
<<p
<<J, t
hrhr R
Wr<<.f R
r<<t lcg
<<)R, I
t
') t) ~r)c<<
l
)'e t
i!
)
t
~ r)
I 't hi!)l Jt- $
< t ~ r) r 0 I, I,RR i) -'!
Rg) 0 @titsl'
'R>t It I h
lt Ir
<<r i'Rch r
t't
"'ffi>>
I or)r IR I s~
h '
<<t') )
- f "<
It f(
'R h (R R,,n<<<<i,'!
~
P,,
~ '"
T
)=
i%
)l<<,; I.)0
> I
<<t't I
~
~ rl,/L Il } I I <<I
~
r
$ t rV R)
<<)
% rw r I tr)prT q '
} pt)RR, r) r
'l~> 0 r '1'")r)f,)
'R r rSS>>
. r; c~ )R}R,)4 R')4))r.Rim )
}
r << ~jr)
~ c:""
')
r) J gt r) Ar R II)t Rt l R t t ) 0 pl prg ft c'
<<>e"'Rr
()
I )e" r>R h<<
- I;) >f,>>
) )n")hr)
) t I <<',
> I>>3, I T.>;
<<RR I I I y I
n g.~c)aaa,]
R~~ fr' O.<<:.4) tt'i "T<<~. 1X f!tc'<<
- R>><I I f IR)<<) I
- J<<.
R)r r)c)r, A tqr I
J
< If I
~ "
Tf I
R T,
3 'At X.I, <<)!
R l 'qh)g I')
i il T )
hI) f~ f j'R ilgI <<Jl c)<
)R!
>~<<I'Rt !r )'RcM Ef II jT h ~ R g rtl TI
,!'!! 'IX>>r I h"%~El"
"'tt,<<r}tt!"
h Irh}g T ht<<t J t it T
R gc Rt l",>>
fy I
) ~tfrt tl)
VI
)
<<'ll l r)
R J(
R
'l RI g
h<<R
<<'l II
)Rt }t),; It<<ss RR R!
R
Carolina Power 8 Light Company OEC 0
)gIIIg SERIAL:
LAP-83-559 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.
1 AND 2 DOCKET NOS.
50-400 AND 50-401
RESPONSE
TO REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Denton:
Carolina Power
& Light Company hereby transmits one original and forty copies of additional information requested by the NRC (Auxiliary Systems Branch) as part of the safety review of the Shearon Harris Nuclear Power Plant.
We will be providing responses to other requests for additional information shortly.
Yours very truly, M. A. McDuffie Senior Vice President Nuclear Generation CT/lcv (8632NLU)
Enclosure CC:
Mr. B.
C. Buckley (NRC)
Mr. O.
D. Parr (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J.
P. O'Reilly (NRC-RII)
Mr. Travis Payne (KUDZU)
Mr. Daniel F.
Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB )
Dr. J.
H. Carpenter (ASLB)
Mr. J. L. Kelley (ASLB )
83i2090233 83i202 PDR ADOCK 05000400 E
PDR 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N, C,27602
< c~$ "
J
Shearon Harris Nuclear Power Plant DSER Open Item Steam Generator Modifications Address the revisions to the FSAR which willresult from the proposed steam generator modifications as required in section 5.5 of NUREG-1014, "Safety Evaluation Report of the Modification to Westinghouse D4/DS/E Steam Generators".
Specifically address:
1.
Transient analysis margins 2.
Tube plugging margin 3.
First cycle inspection interval
Response
With regard to transient analysis margins, CP6L does not anticipate any impact on the results/conclusions of the current Chapter 15 analyses.
Minor changes will be required and specific analyses will be redone to update the final safety analysis report in light of the proposed steam generator modifica-tions.
This will be done and the FSAR will be amended by June 1984.
Tube plugging margin will be addressed in the SHNPP Technical Specifications.
These are scheduled for submittal to the NRC staff in June 1984.
SHNPP Tech Specs will be based upon NUREG-0457.
Based on current schedules, SHNPP will not be the lead plant for this modification program.
Therefore, the first cycle inspection interval is not applicable to SHNPP.
SHNPP steam generator inservice inspection will always include samples of expanded tubes as a special subset of inspections.
F=
e.