ML18018B358
| ML18018B358 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/18/2018 |
| From: | NRC |
| To: | NRC/NRO/DNRL/LB4 |
| References | |
| Download: ML18018B358 (3) | |
Text
1 Vogtle PEmails From:
Hoellman, Jordan Sent:
Thursday, January 18, 2018 2:39 PM To:
Vogtle PEmails Cc:
Patel, Chandu
Subject:
ACCEPTANCE REVIEW OF SNC'S REQUEST FOR LICENSE AMENDMENT AND EXEMPTION FOR VEGP, UNITS 3&4: CONSISTENCY AND CLARIFICATION CHANGES TO ANNEX BUILDING, AUXILIARY BUILDING, AND BASEMAT ITAAC (LAR 17-040) (EPID L-2017-LLA-0437)
Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.
42 Inverness Center Parkway BIN B237 Birmingham, AL 35242
SUBJECT:
ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR LICENSE AMENDMENT AND EXEMPTION FOR THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4: CONSISTENCY AND CLARIFICATION CHANGES TO ANNEX BUILDING, AUXILIARY BUILDING, AND BASEMAT ITAAC (LAR 17-040) (EPID L-2017-LLA-0437)
Dear Mr. Whitley:
By letter dated December 15, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17349A924), Southern Nuclear Operating Company (SNC) submitted a request for a License Amendment and Exemption (LAR 17-040) for the Combined License (COL) Numbers NPF-91 and NPF-92, for Vogtle Electric Generating Plant (VEGP) Units 3 and 4, respectively. The requested amendment proposes consistency changes to COL Appendix C (and to plant-specific Tier 1 information) and associated Tier 2* and Tier 2 information to clarify the thickness of the Nuclear Island (NI) Basemat, to revise wall thicknesses and descriptions in the Auxiliary Building, and to clarify floor thicknesses in the Annex Building.
SNC has also requested an exemption from the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Part 52, Appendix D,Section III.B, Design Certification Rule for the AP1000 Design, Scope and Contents, to allow a departure from the elements of the certification information in Tier 1 of the generic AP1000 Design Control Document.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, an amendment to the license must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. 10 CFR 52.79 addresses the content of technical information required. This section
2 stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application against the regulatory requirements and has concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
SNC has requested NRC staff approval of this LAR by November 30, 2018. The staff will attempt to support that date but it will depend on whether supplements to your request are needed. If the change is needed to support construction, please consider submitting a Preliminary Amendment Request (PAR).
If you have any questions, please contact me at (301) 415-5481 or Jordan.Hoellman2@nrc.gov.
Sincerely,
/RA/
Jordan Hoellman, Project Manager Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Docket Nos.: 52-025 52-026
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
203 Mail Envelope Properties (BY2PR09MB02803D8A840CE95367EFBB34D5E80)
Subject:
ACCEPTANCE REVIEW OF SNC'S REQUEST FOR LICENSE AMENDMENT AND EXEMPTION FOR VEGP, UNITS 3&4: CONSISTENCY AND CLARIFICATION CHANGES TO ANNEX BUILDING, AUXILIARY BUILDING, AND BASEMAT ITAAC (LAR 17-040) (EPID L-2017-LLA-0437)
Sent Date:
1/18/2018 2:39:27 PM Received Date:
1/18/2018 2:39:30 PM From:
Hoellman, Jordan Created By:
Jordan.Hoellman2@nrc.gov Recipients:
"Patel, Chandu" <Chandu.Patel@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office:
BY2PR09MB0280.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4624 1/18/2018 2:39:30 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: