ML18018A837
| ML18018A837 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/14/1983 |
| From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| EA-83-041, EA-83-41, LAP-83-473, NUDOCS 8310210136 | |
| Download: ML18018A837 (6) | |
Text
'REGULATORY "I RNATION OISTRISUTION 'SYSl,(RIOR<<
t
'AOCESSION NBR;8310210136.
DOO.DATE: 83/10/ic, NOTARIZED:.,No DOCKET" i FAOIL:50 400 'Shearon Hanr)s,Nuclear Power <<Plantr.Unit" ii "Carol')na 05000000
'50-401 'Shear on Hat<<riis'ucl ear }Power P 1 antq. Uni tE 2'~ ',Carol ina 05000401 AUTH'iNAME AUTHOR AFFILIATION MCDUFFIE'iM>>A,
}Carolina-<<Power 8 Light Co>>
"RE<<CIP,NAME<<RECIPIENT AFFIL'IATION
.DENTONgH.R>>
Office} of Nucl ear 'Reactor
-Regul ationi Dir ector Wag
'SUBJECT; Forwar ds addi info ne fire pr otectiong includin'g <<t esponse
.to "Safety Review Question 280 ~ iver euised <<safe'hutdown analysis w/exemptiops,8 mods<info requested in-830926 27 meetings H/
NRC.5 response
<to Enforcement" Action 83 01>>
DISTRIBUTION <<CODE; B002S
<<COPIES }RECEIVED:L<<TR, '<<ENCL<,
"SIZEi
.'ITLEs.
Li'censing 'Submi,ttal:.Fir e'IProtection NOTES'EC IP XENT ID.CODE/NAME<<
NRR LB3 BC 06'4 INTERNAL; <<ELD/HDS1 NRR/DFJ R
1" 2
1
<<COP XES
,LTTR 'ENCL<<
'.1 1
~0 P2 1
- RECIPIENT "ID <
>: ACRS NRC>>PDR
.NTIS 10.
02.
6 6
L'PDR' 1
NSXC>>
1=
03 05-1 1
1
',1 Wo 8. 4<<gee/E
}TOTAL NUMBER.OF COPIES'EQUIRED e
L<<TfR 19
<<ENCL' 18
T
<<}
~ l l) <<}r'(
f <<} }l<<<< "1 }rr }0 "I,: l }X," 0<<,i T}}<<,}}l Xf)
"nr fn's,
)
g l 0 rr}}f
<<nr f<.'1w>)
q }
<<n I n l '} } } r i l1 0 r l l'
}it<<<<}~)
"}
qT <<s l}<<0 l pry
~ }
q<<'}<<} f I ff'i p
t l<<r
,< <<}}}r}r'
)(}r)
- }}}q<<c,'r }'}g<<<<}
<<} lg,r}}$ ',
Q}J<<<<g r "} } jp"" r}n'}gy<<}g}r" IJ
') }Pl
~r}wo
}.
[ l f>q} )
.}I'<>> l >>
.} }'r) ) 'l I~
~
~ Pl t j<<<<
~
, )i Ei
, I} g
(} <<g r}(<<
I r.'
) }ii
~
I l
)(y$ l
)3l
.)
~ I
'f'f pp <<n ),<< i'}
<<fear}}<}l
'}}ll~ ~c}r g'}
~
n l f<<~~
<<ree i v<<1
<AD r)8 r}
A r pi}
. f } -P rf qnr 0
'}~r )
t<<1<} r f c>>>t r> 0 r 'l o'}4 0'r) r v
} ~)
r1 r q pi<<<"<<y<<r<<Arp r 'f
$.<<<< "}
nJ r}<<".nn g<<'<<}a
+'}0 l
<<) )
tb<<<<}X
) }I
- f ) ll>>
- 3%1 l
),
)
'<T,j: l )y7
'1
< "1 8
) 1 'sf'J PN')'~: )0}),}
r}~ r 0 >cjoy'J oz r )
. l a,f p rr i".'}}i'r}r ll<<}lIlg r l: }l)ri
1 CÃQ0, Carolina Power & Light Company OCT 14 1983 SERIAL:
LAP-83-479 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.
1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 FIRE PROTECTION
Dear Mr. Denton:
Carolina Power
& Light Company hereby transmits one original and forty copies of additional information requested by the NRC as part of the safety review of the Shearon Harris Nuclear Power Plant.
This information was requested during the fire protection meetings held September 26-27, 1983 in Bethesda.
The enclosures to the letter are delineated in the attached Summary of Enclosures.
The attachments include all of the additional information requested on Fire Protection.
We will be providing responses to other requests for additional information shortly.
Yours very truly, M. A. McDuffie Senior Vice President Nuclear Generation MAM/pgp (8185NLU)
Enclosures Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)
Dr. J.
H. Carpenter (ASLB)
Mr. J. L. Kelley (ASLB) 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602 cc:
Mr. B. C. Buckley (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J.
P. O'Reilly (NRC-RII)
Mr. Travis Payne (KUDZU)
Mr. Daniel F.
Read (CHANGE/ELP) 88 tXllh Mr. R. P.
Gruber (NCUC)
O Chapel Hill Public Library
'HC Wake County Public Library jul
',~U Imgi
'OIC FJA 03CLtt-I I
I
SUMMARY
OF ENCLOSURES 1.
Revised
Response
to NRC Safety Review Question 280.1 2.
Revised Safe Shutdown Analysis with Exemptions and Modifications 3.
Additional Information Requested by NRC in Meetings held September 26-27, 1983 4.
Response to Inspection and Enforcement Notice 83-41 (8 223FXTt da)
ENCLOSURE 1
Shearon Harris Nuclear Power Plant Draft SER Open Item 350 Safety Review estion 280.1 Revised Response The original response to Open Item 350 (Comparison to Branch Technical Position (MEB 9.5-1))
was transmitted via letter dated August 12, 1983 (LAP-83-333).
'Ihe reviewer requested" that this response be modified as discussed in the September 26 27 meetings.
In addition, the NRC requested CP&L to submit an FSAR page change to clarify and correct a
reference to NFPA No.
72D.
Response
The revised response to Open Item 350 is attached.
'Ihe FSAR page change is also attached and will be included in a future FSAR Amendment.}}