Text

. REGULATOR NFORMA'T ION DISTRIBUTION TEM (RIDS)

AOCESSION NBR:8202170<71 DOC.DATE: 82/02/08 NOTARIZED: NO DOCKET FACIL:50"400 Shearon Harris Nuclear power 'Pl anti 'Uni.'t 1~ Carolina 0500'0400 50-401 Shear on Harris Nuclear Power 'Plant~ 'Unit 2~ .Carolina 05000001 TH ~ NAME . AUTHOR AFFILIATION MERMAN<'S,R. Carolina Power.8 Light Co.

'C IP ~ NAME RECIPIENT AF F IL'I ATION MIRAGLIAsFeJo Licensing Branch 3

SUBJECT:

Forwards responses to FSAR acceptance review'questions 8 environ rept questions in NRC 8111?5 1:tr,'Requests streamlined distribution for -quick resolution of questions 8 concerns'ISTRIBUTION TITLE: PSAR/FSAR CODE: B001S AMDTS and

~COPIES 1RECEIVED:LTR Related ~Correspondence 4 'ENCL ~ "SIZE:,: 3.<<'3O NOTES: t 5+A gE'VIe4/ ~~r~a~S + g,~w~S~

cc 8wv~~~ ++/9'~~M- g~~(X +~ +~v'<~ +~~~

REC IP IENT COPIES RECIPIENT ~COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME '7TR ENCL ACTION: A/D LICENSNG LIC BR P3 LA 1

1 0

0 LIC BR 03 'BC LICITRAgM~ '1 1 1

0 1

INTERNAL: ELD 1 g0 IE 06 '3 3 IE/DEP/EPDB 35 1 1 IE/DEP/EPLB 36 '3 3 NRR/DF/CEB MPA 0

'8 11 1 1 1 NRR/DE/EQB, 13 3 NRR/DE/GB 28 2 NRR/OE/HGEB 30 2 NRR/DE/MEB 1 1 NRR/OE/MTEB 17 1 1, NRR/DE/QAB 21 1 1 NRR/DE/SAB 20 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DSI/AE8 26 1 1 NRR/DS I/ASB 27 1 1 NRR/OSI/CPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/OS I/ETSB .12 1 1 NRR/DSI/ICSB 16 1 1 NRR/DSI/PSB 19 1 NRR/DS I/RAB 2? 1 1 NRR/D SB '23 1 1 NRR/DST/LGB 33 1 1 FIL 00 1 1 EXTERNAL: ACRS 41 16 16 BNL(AMDTS ONLY) 1 FEMA<<REP D IV 39 1 1 LPDR 03 1 NRC PDR 02 1 1 NSIC 05 1 NTIS 1 1 Cp LP~

nibs

~Sl C TOTAL NUMBER OF COPIES REQUIRED: L'TTR 63 ENCL 58

'4 h N

j, l*

1 ty

,I hf 1

H

CRQE Carolina Power & Light Company February 8, 1982 ~4~e ~l~g~!

f>5ev>> gg FEg y'6)9&

Office of Nuclear Reactor Regulation ~gg SNICK

+ ~i+ggSVR ATTN: Mr. F. J. 'Miraglia, Chief mil Licensing Branch No. 3 United States Nuclear Regulatory Commission Washington, D.C. 20555 r'HEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-400 AND 50-401

'CCEPTANCE'REVIEW UESTIONS'ear Mr. Miraglia:

As requested by Mr. E. A. Licitra of your staff, please find enclosed 60,copies of Enclosure 1 and 41 copies of Enclosure 2 to our letter of January 29, 1982 which forwarded Carolina Power & Light Company's responses to the Acceptance Review Quesgions contained in Mr. D. G.

Eisenhut's letter of November 25, 198 .J,,Enclosure 1 addresses Final Safety Analysis Report (FSAR) questions and Enclosure 2 addresses Environ-mental Report (ER) questions. Additionally, copies of Enclosure 1 have been provided to the three national laboratories requested by Mr. Licitra.

ER Question 470.3 requested reprints of some ER tables.

Because these tables are oversized, only five copies of these tables have been provided and are separated from Enclosure 2. Additionally, as directed by Mr. Licitra, additional copies of ER references have not been provided.

As has been previously indicated to you, CP&L is .dedicated to being responsive to NRC's needs and to streamlining the licensing process.

It was with this in mind that we provided the answers to the Acceptance Review Questions two months ahead of your requested schedule. It would an..

moA'<<t'n be extremely helpful, however, if your staff would develop a streamlined

'O distribution for the quick resolution of questions and concerns. Pro-l OO fgg viding 40 to 60 copies of correspondence is cumbersome and potentially o wasteful, given the cost associated with printing and mailing 60 copies of large documents, such as question responses, and the fact that these thK<<t CD responses are provided for reviewer use; not as FSAR or ER Amendments.

,OO

'NA Formal amendments to the FSAR and ER will, of course, be provided in the iQl specified numbers, but advance answers to questions would seem to be an i

C7!L area where fewer copies were required. We stand ready to continue to I 0JA (Q)n <<c>>

work with you to make the process as responsive and streamlined as possible, but feel this is an area where improvement is needed.

go1 ltd< i/0 gdfpp',

~C,q p yO

~tt+ ~pO 411 Fayettevllle Street e P. 0. Box 1551 o Raleigh, N. C. 27602 it@" i(u ~ IF pi~ ytuce

If ~

~ "~

t C ph l V k

I pit g

,~ r

Mr. F. J. Miraglia February 8, 1982 If you have any questions on this matter, please do not hesi-tate to call our staf f.