ML18017B459

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/81-14,50-401/81-14, 50-402/81-14 & 50-403/81-04 on 810620-0720 & Notice of Violation
ML18017B459
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/05/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017B455 List:
References
NUDOCS 8109240371
Download: ML18017B459 (4)


See also: IR 05000400/1981014

Text

Carolina

Power

and Light Company

ATTN:

Mr. J.

A. Jones,

Senior Executive

Vice President

and Chief

Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

Subject:

Report Nos.

- 00 81-, 50-401/81-14,

50-402/81-14,

and

5 -

3/81-14

This refers to the routine safety inspection

conducted

by Mr. G.

F. Maxwell, of

this office on June

20 through July 20,

1981, of activities authorized

by

NRC

License

Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Harris facility.

Our preliminary findings were discussed

with Mr.

R.

M. Parson,

Site Manager at

the conclusion of the inspection.

Areas

examined

during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

During the inspection, it was found that certain activities under your license

appear

to violate

NRC requirements.

This item and references

to pertinent

requirements

are listed in the Notice of Violation enclosed

herewith

as

Appendix A.

Elements

to

be included in your response

are delineated

in

Appendix A.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter and the enclosed

report will be placed in the

NRC's Public Document

Room.

If the report contains

any information that you believe to be exempt from dis-

closure

under

10 CFR 9.5(a)(4), it is necessary

that you:

(a) notify this office

by telephone within ten days

from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter

a written application to this office to withhold such informa-

tion.

If your receipt of this letter

has

been

delayed

such that less

than

seven

days are available for your review, please notify this office promptly so that

a

new due date

may

be established.

Consistent with section 2.790(b)(1),

such

application

must

be accompanied

by an affidavit executed

by the owner of the

information which identifies the document or part thereof sought to

be withheld,

and

a full statement of the reasons

on the basis of which it is claimed that the

information should

be withheld from public disclosure.

This section further

requires

the statement

to address

with specificity the considerations

listed in

10 CFR 2;790(b)(4).

The information sought to

be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear from

you in this regard within the specified

periods

noted above,

the report will be

placed in the Public Document

Room.

E

Si0924037i Si09i7 ]),

PDR

ADOCK OS000400I

PDR')

A

ill

~ c ";.,'~" 'W

~ c. A

'fGfl l"~

'I

,)

'!J'1!l

"> l> '

E$

"gpss)

?;,

,I(~

')

'fil

Af.

"l

~ f f~

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosure:

l.

Appendix A, Notice of Violation

cc w/encl:

R. Parsons,

Site

Manager

R.

C. Lewis, Director

Division of Resident

and

Reactor Project Inspection

bcc w/encl:

NRC Resident

Inspector

Document

Management

Branch

State of North Carolina

RII RRPI

G

el 1:gr

~81

8/sggi

RII:

RP

C

CJul

an

~~81

Pa/g/

R:

RPI

/

/81

h

II

h

\\'t

h

I

It