ML18017B459
| ML18017B459 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/05/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18017B455 | List: |
| References | |
| NUDOCS 8109240371 | |
| Download: ML18017B459 (4) | |
See also: IR 05000400/1981014
Text
Carolina
Power
and Light Company
ATTN:
Mr. J.
A. Jones,
Senior Executive
Vice President
and Chief
Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
Subject:
Report Nos.
- 00 81-, 50-401/81-14,
50-402/81-14,
and
5 -
3/81-14
This refers to the routine safety inspection
conducted
by Mr. G.
F. Maxwell, of
this office on June
20 through July 20,
1981, of activities authorized
by
NRC
License
Nos.
CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161 for the Harris facility.
Our preliminary findings were discussed
with Mr.
R.
M. Parson,
Site Manager at
the conclusion of the inspection.
Areas
examined
during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was found that certain activities under your license
appear
to violate
NRC requirements.
This item and references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as
Appendix A.
Elements
to
be included in your response
are delineated
in
Appendix A.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosed
report will be placed in the
NRC's Public Document
Room.
If the report contains
any information that you believe to be exempt from dis-
closure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this office
by telephone within ten days
from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter
a written application to this office to withhold such informa-
tion.
If your receipt of this letter
has
been
delayed
such that less
than
seven
days are available for your review, please notify this office promptly so that
a
new due date
may
be established.
Consistent with section 2.790(b)(1),
such
application
must
be accompanied
by an affidavit executed
by the owner of the
information which identifies the document or part thereof sought to
be withheld,
and
a full statement of the reasons
on the basis of which it is claimed that the
information should
be withheld from public disclosure.
This section further
requires
the statement
to address
with specificity the considerations
listed in
10 CFR 2;790(b)(4).
The information sought to
be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear from
you in this regard within the specified
periods
noted above,
the report will be
placed in the Public Document
Room.
E
Si0924037i Si09i7 ]),
ADOCK OS000400I
PDR')
A
ill
~ c ";.,'~" 'W
~ c. A
'fGfl l"~
'I
,)
'!J'1!l
"> l> '
E$
"gpss)
- ?;,
,I(~
')
'fil
Af.
"l
~ f f~
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosure:
l.
Appendix A, Notice of Violation
cc w/encl:
R. Parsons,
Site
Manager
R.
C. Lewis, Director
Division of Resident
and
Reactor Project Inspection
bcc w/encl:
NRC Resident
Inspector
Document
Management
Branch
State of North Carolina
RII RRPI
G
el 1:gr
~81
8/sggi
RII:
C
CJul
an
~~81
Pa/g/
R:
/
/81
h
II
h
\\'t
h
I
It