ML18017B349
| ML18017B349 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/12/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18017B346 | List: |
| References | |
| NUDOCS 8103260536 | |
| Download: ML18017B349 (4) | |
See also: IR 05000400/1981002
Text
/
ggff REGS
0O
IVl
O
Y/+~
~O
~+*+~
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
FE8 12 ~88>
Carolina Power and Light Company
ATTN: J. A. Jones,
Senior Executive
Vice President
and Chief
Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
Subject:
Report Nos. 50-400/401/402/403/81-02
This refers to the routine safety inspection
conducted
by
G ~
F. Maxwell of this
office on December
29,
1980 -. January
30,
1981., of activities authorized
by
NRC
NRC Construction
Permit
Nos. >CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161
for
the
Shearon
Harris facility.
Our preliminary findings
were
discussed
with
S.
D. Smith and R.
M. Parsons at the conclusion of the inspection.
Areas
examined
during
the
inspection
and
our f1ndings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
~
~
~
During the inspection, it was
found that certain activities under your license
appear
to violate
NRC requirements.
This
item
and
references
to pertinent
requirements
are
listed
in
the
Notice
of Violation enclosed
herewith
as
Appendix A.
Elements
to
be
included
in your
response
are
delineated
in
Appendix A.
In accordance
with Section
2.790 of the
NRC "Rules of Practice," Part 2, Title
10,
Code of Federal
Regulations,
a copy of this letter and the enclosed
inspec-
tion report will be placed
in the
NRC Public
Document
Room.
If this report
contains
any information that you believe to be proprietary, it is necessary
that
you
make
a written application within 20 days to this office to withhold such
information from public disclosure.
Any such application must include the basis
for claiming that the information is proprietary
and the proprietary information
should
be contained
in a separate
part of the document.
If we do not hear from
you in this regard within the specified period,
the report will be placed in the
Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely
Enclosures:
(See
Page
2)
C.
E. Murphy,
ie
Reactor Construction
and Engineering
Support Branch
8 zo 3s6053&
l
Carolina Power
and Light Company
FERIA ~ss~
Enclosures:
1.
Appendix A Notice of Viol'ation
2.
Inspection Report Nos. 50-400/81-02
50-401/81-02,
50-402/81-02
and
50-403/81-02
cc w/encl:
R. Parsons,
Site Manager
tg