Forwards IE Insp Repts 50-400/80-18,50-401/80-16, 50-402/80-16 & 50-403/80-16 on 800707-11 & Notice of Violation
ML18017B251
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/26/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017B248 List:
References
NUDOCS 8010140139
Download: ML18017B251 (2)


See also: IR 05000400/1980018

Text

t

gyR REcp

~o

Cy

~i

CtO

/g

0

++*++

, In Reply Refer To:

RII:NE

50-400/80"18

50-401/80-16

50-402/80"16

50-403/80"16

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

AUG 2 6%80

Carolina Power and Light Company

.ATTN: J. A. Jones

Senior Executive Vice President

and

Chief Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

This refers to the inspection conducted by N. Economos of this office on July 7-11,

1980, of activities authorized by NRC Construction Permit Nos. CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Harris facility, and to the discussion

of our

findings held with R. H. Parsons at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

During the inspection, it was

found that certain activities under your license

appear to be in noncompliance with NRC requirements.

These

items

and references

to pertinent requirements

are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires

you to submit to this office, within 20 days of

your receipt of this notice,

a written statement or explanation in reply including:

(1) corrective steps

which have been taken by you and the results

achieved;

(2)

corrective steps

which will be taken to avoid further noncompliance;

and (3) the

date when full compliance willbe achieved.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal Regulations,

a

copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that you make

a written application within 20 days

~to this office to withhold such information from public disclosure.

Any such

application must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should

be prepared

so.

that proprietary information identified in the application is contained in a

separate

part of the document.. If we do not hear from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

sp xp yg,p/Dg

Carolina Power and Light Company

gUG 2 6 198O

Should you have

any questions

concerning this,,letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murp y, Chief

Reactor Construction

and Engineering

Support Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-400/80-18,

50-401/80-16,

50-402/80-16

and 50-403/80-16

cc w/encl:

R. Parsons,

Site Manager