Deficiency Rept Re Use of Insufficient Preheat in Field Welding of Seismic I Hangers.Item Is Still Under Investigation to Determine Reportability Per 10CFR50.55e. Evaluation Will Be Completed by 800905
ML18017B222
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/19/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8009100465
Download: ML18017B222 (3)


Text

REGULATO 'NFORMATION DISTRIBUTION S TEM (R IDS)

'CKSSION NBR:8009100465 DOC DATE; 80/08/19 NO TAR I ZED: NO DOC Unit ii Carolina

~

FACIL:50-400 Shearon Harrjs Nuclear Power Planti 000~

50-401 Shearon Harrjs Nuclear Power Planti Unjt 2i Caroljna o 01 50-002 Shearon Harris Nuclear Power Planti Unit 3i Carolina 05000002 50-403 Shearon Harris Nuclear Power Planti Unit 4i Car ol ina 05000003 AUTH. NAME AUTHOR AFF IL I AT ION CHIANGIPN ~ J. Carolina Power 8 Light Co.

REC IP ~ NAME RECIPIENT AFFILIATION

SUBJECT:

Deficiency rept re potential deficjency re use of insufficient preheat. in, field welding of Seismic I hangers.,

Item is still under investigation to determine reportability per 10CFR50.55e.Evaluation will be completed by 800905.

DISTRIBUTION CODE: BOI90 COPIES RECEIVED:LTR &ENCL /SIZEE TITLE: Construction Deficiency Report (10CFR50.55K)

NOTES'ECIPIENT COPIES RECIPIENTS COPIES IO CODE/NAME Lfl'TR ENCL ID CODE/NA9E. LTTR ENCL-ACTION: A/0 LICENSNG 04 1 1 YOUNGBLOODEB 05 1 1 RUSHBROOKEM ~ 06 1 1 HILSONE JERRY 07 1 1 INTERNAL: AD/RC I/IE 17 1 1 AEOO 18 1 1 ASLBP/J ~ HARD 1 1 0/DIR HUM FAC15 1 1 DIREHUM FAC Slo 1 1 EDO L STAFF'9 1 1 EQUIP QUAL" BR11 1 1 ILE 09 2 2 LIC QUAL BR 12 20

'PA 1 1 1 1 NRC POR 02 1 1 OELD 21 1 1 PRO ST REV 13 1 QA BR 14 1 1 01 1 1 RUTHERFORDid ~ IE 1 1 STANDROS DEY 21 1 1 EXTERNAL: ACRS 16 16 16 LPDR 03 1 1 NSIC 08 1 1 I

SEP gg t980 TOTAL NUMBER OF COPIES REQUIRED: LTTR ~43 ENCL'

0 tt 1 f I "'I e '1 I, e II It r

CFP-IL Carolina Power & Light Company ." ',,"g l g, Pile: SH N-2/18 Item 43 August 19, 1980 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1, 2, 3, AND 4 .

DOCKET NOS. 50-400,'0-401, 50-402 AND 50-403 ':

USE OP INSUFFICIENT PRElKAT IN THE PIELD WELDING OP SEISMIC I HANGERS

Dear Mr. O'Reilly:

On July 22, 1980,.the Region XI,office,'(Mr. V..Brownlee) was notl,fied by the Carolina Power & Light Company (CP&L) of:a potentially.reportable item concerning the use of insufficient preheat in the'ield .welding of .Seismic I hangers. As indi-cated,duxing the August 19, 1980,. telephone conversation with, youx Mr. J. K. Rausch, CP&L has not completed'ts metallurgical evaluation of thismatter'o determine whether the problem is reportable'.per'he'rovisions of 3,0CPR50.55(e) and 10CPR Part 21. It is now anticipated'hat this reportability. evaluation will be completed by September', 1980,. at which time the'RC.will. be notified of our decision.

Thank you for your consideration in this matter.

rVR/mt .(090 861) Yours very truly, cc: Mr. V. Stello (2).

N J. Chi gi ger Eng neexing Construction Quality, ssuxance 411 Fayettevllle Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602

'FPIOIAL"COPY a Oeel 00 Pk5