Interim Deficiency Rept Re Procurement,Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Corrective Action on 22 Remaining Plates to Be Completed by 801115
ML18017B217
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/29/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To:
References
10CFR-050.55E, 10CFR-50.55E, SH-N-2-18, NUDOCS 8009080254
Download: ML18017B217 (5)


Text

REGULATOR~NFORMATION DISTRIBUTION S TEM (RIDS)

ACCESSION NBR: 8009080254 DOC,DATE:

FACIL:50 400 Shearon Harrjs Nuclear Power Planti Unft 80/08/29 50.401 Shearon Harrjs Nuclear Power Plenty Unit 2g C'arolfna NOTARIZED!

ii NO Carolfna DOCKET 05000400 05000401

¹ ~

50%402 Shear on Har ris Nuclear Power Plant~ UnIt 3i Caroliina BYNAME 05000402'5000403 50 403 Shearon Harris Nuclear Power Planti Unit 4i Carolina AUTH AUTHOR AFFILIATION CHIANGIiN~ J ~ Carolina Power 8 Light Co.

RECIP.NAME RECIPIENT'FFILIATION

SUBJECT:

Interim deficiency rept re procurementifabrication 8 insp of engineered plates fol concret:e embedment 8 support of safety-related loads. Corrective action on 22 remaining plates to be completed by 801115.

DISTRIBUTION CODE! B019S COPIES RECEIVED:LTR >'NCL" SIZ TITLE: Construction Deficiency Report (10C R50.55E)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID LTTR ENCL ID CODE/NAME" LTTR ENCL' YOUNGBLOODgB 05 CODE/NAME'CTION:

A/D L'ICENSNG 04 RUSHBROOK,MD 06 HILSONgJERRY 07 I NTERNAL: AD/RC I'/IE'7 ASLBP/J ~ HARD 1

1 AEOD HUM, FAC15 18'/DIR 1

DIRgHUM FAC S10 1 EDO L STAFF'9 1 EQUIP QUAL'R11 1> ILE 09 2 LIC'UAL> BR 12 1 MPA 20 1 NRC PDR 02 1 OELD 21 1 14 RE G FILE'1 EV 13 EV 21 1

1 1

QA BR RUTHERFORDIUM, IE

,1 1

EXTERNAL: ACRS 16 16 1 LPDR 03 NSIC 08 1 8hP g ~>g TOTAL NUMBER OF COPIES REQUIRED: LTTR 40 ENCL'

0 tl 11 0 /

0 f

I ft lf 1 I 'I e4 g i,

If A

h It 11 I

~ ro

FORM 21MM Carolina Power & Light Company Raioigh, f4. C. 27602 File: SH N-2/18 Item '12 August 29, 1980 Hr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 1

SHEARON HARRIS NUCLEAR PORK PLANT UNITS 1, 2, 3, AND 4 DEFICIENCIES IN THE PROCUREMENT, FABRICATION AND INSPECTION OF ENGINEERED PLATES FOR CONCRETE EMBEDMENT AND SUPPORT OP SAFETY RELATED LOADS INTERIM REPORT OPEN ITEM '400 AND 401/79-14-01 402 AND 403/79-13-01

Dear Mr. O'Reilly:

Per our May 30, 1980, interim report on the subject deficiency, we informed you that out of the 469 defective plates identified, 22 plates still required some form of corrective action and it was estimated that the corrective action completion date was September 1, 1980. The intent of this letter is to inform you that corrective action on the 22 remaining plates has not yet been completed. Tests specified by the Architect Engineer are presently being conducted to determine the acceptability of the plates. Depending on the acceptability of the test results, it is now estimated that all corrective action will be completed by November 15, 1980, at which time the final 10CFR50.55(e) report will be submitted.

If you have any questions regarding this matter, pl'ease do not hesitate to contact me.

NJC/mt (5061) Yours very truly, cc: Mr. V. Stello (2) ~ Original Signed Bnt N. 3. Chiangi N. J. Chiangi Manager Engineering & Construction Quality Assurance yr'7 S I D>

J I

it / b'll h f I J Sl p b

ll

,i. Jt . t ~ It h, Lth,t'll

~ J,

~

t't

't I ~ I,

~ I

~ If

~ t g

lt N Jt, ~ *I gt-J ~

st III 'h It ~

h tlltl "/,l k S

4 t b I

~ '

J'HAL l"

v

'. FORM 21-SOM

\=

'ile: SH Item'12 N-2/18 Carolina Power & Light Company Ratofgh, N. C. 27602 II I

,August 29, 1980 il

~ ~

~

  • P

" Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest

";.'...
.:1",.; 'tlanta;",Georgia,30303, ,,;...",,;,,,,t,;

~,' j ~

SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1, 2, 3, AND 4 DEPICIENCXES IN THE PROCUREMENT, PAMICATXON AND XNSPECTION OP ENGINEERED PLATES POR CONCRETE EMBEDMENT AND SUPPORT OP SAPETY RELATED LOADS .XNTERIM REPORT

.OPEN ITEM 400 MD 401/79-14>>01 402 AND 403/79-13-01

":, Dear 1'. I O'Reilly:

' ~ i L" r ~

P Per our May 30, 1980, interim report on the subject deficiency,'we informed you t1iat out of the 469 defective plates identified, 22 plates still required

'some form of corrective action and it was estimated that the corrective act:ion completion date was September 1, 1980. The intent: of this letter is to inform you that corrective action on the 22 remaining plates has not yet

" 'een completed. Tes'ts specified by the Architect Engineer are presently being conducted to determine the acceptability of the plates. Depending on the acceptability of the test results, will it is now estimated that all corrective action be completed by November 15, 1980, at which time

" ~

-,;the final 10CFR50.55(e),report will be submitted...,.c.;-,,':",'.;;".'...;,',,;,

Xf you have any questions regarding t'his matter, please do not hesi.tate to me. 'ontact NJC/mt (5061) Yours very truly, cc: Mx. V. Stello (2)~ Original Signed BY

'.N. 3. Chiangi J. Chiangi Manager Engineering 6 Construction Quality Assurance