ML18017B212
| ML18017B212 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/25/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18017B213 | List: |
| References | |
| NUDOCS 8008280106 | |
| Download: ML18017B212 (3) | |
See also: IR 05000400/1980015
Text
1PR REMI
~o
Cy
~c
0O
IlO
rg C
O
<r+~
~O
++*<<+
In Reply Refer To:
RII:WPK
50-400/80-15
50-401/80-13
50-402/80-13
50-403/80-13
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
JUL 25 ISBII
Carolina Power and Light Company
'ATTN: J. A. Jones
~ Senior Executive Vice President
and
Chief Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
This refers
to the inspection
conducted
by
W.
PE Kleinsorge of this office on
June
16-20,
1980,
of activities
authorized
by
NRC Construction
Permit Nos.
CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161 for the Harris facility, and to the
discussion
of our findings held with R.
M. Parsons
at the conclusion of the
inspection.
~
~
Areas
examined
during the inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
We
have
examined
actions
you
have
taken with regard
to previously reported
unresolved items'he status of these items is discussed in the enclosed report.
During the inspection, it was
found that certain activities under your license
appear to be in noncompliance with NRC requirements.
These
items
and references
to pertinent requirements
are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal Regulations.
Section 2.201
requires
you to submit to this office, within 20 days of your
receipt of this notice,
a written statement
or explanation in reply including:
(1) corrective steps
which have been taken by you and the results
achieved;
(2)
corrective steps
which will be taken to avoid further noncompliance;
and (3) the
date when full compliance will be achieved.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this
report
contains
any information that you (or your contractor)
believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such'
application must include
a full statement of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should
be prepared
so
80 0 8880/0&
I'
'C
JUL 25 is<0
Carolina Power and Light Company
-2-
that proprietary information identified in the application is contained in a
'eparate
part of the document.
If we do not hear from you in this regard within
~
" the specified period, the report willbe placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E. Murphy,
hief
1
Reactor Construction
and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-400/80-15,
50-401/80-13,
50-402/80-13
and 50-403/80-13
cc w/encl:
R. Parsons,
Site Manager