REGULATORY
'RMATION DISTRIBUTION SY M (RIDS)
ACCESSION NBR:8007150535
.DOC ~ DATEt 80/07/09NOTARIZED; NO FACIL:50-400 Shearon Harris Nuclear Power Planti Unit lr Carol )na 50 401 Shearon Harris Nuclear Power Planti Unit 2r Carolina 50 402 Shearon Harris Nuclear Power P)anti Unit 3r Carolina AUTH INANE AUTHOR AFFILIATION MCDUFFIKiM,A~,
Carolina Power L Light Co.
RECIP ~ NAME RECIPIENT AFFILIATION DENTONrH ~ RE Office of Nuclear Reactor Regulationi Director pe/((
DOCKET 05000400 05000401 05000402 bq~b'l o'5 SUBJECT!
Requests clarification of ANSI N45,2 ~ 10 as invoked by Reg Guide 1.74ras to whether or not certificates of conformancer certificates of compliance L certified test repts must contain longhand signatures DISTRIBUTION CODE:
B001S COPIES RECEIVED!LTR
'NCL ~
SIZEe TITlE! PSAR/FSAR AMDTS and Related Correspondence O'
O'
~
T KS ~ <<wwm~~w~we~~~~~y~~&~&~m~gygoAy~~oy~&~wm
, ACTION!
INTERNAL RECIPIENT ID CODE/NAME ADA10 uc~S>96-LAg.mv80bh
> n.
ACCID EVAL BR CHEM ENG BR CORE PERF'BR 17 DIR g SFTY TECH EMERG PREP 22 EQUIP QUAL BR HYD/GEO BR li ILK 06 MECH ENG BR NRC PDR 02 POWER SYS BR QA.'BR 10 RE'AC SYS BR SIT ANAL BR 27 COPIES LTTR ENC 1
1 1
1 a
1 II q 1
1 3
1 1
1 1
1 1
RECIPIENT L
ID CODE/NAME.
BC QOvt4c ht00,'5, PMly<Wcroz g.
05 AUX SYS BR 18 CONT SYS BR DIRr HUM FAC SFY EFF TR SYS BR ENV ENG BR GEOSCIEN BR 09 ILC SYS BR 20 MATL KNG BR MPA OELD PROC/TST REV BR RAD S
8R12 FILE 01 G
BR COPIES "LTTR KNC 1
1 (EXTERNAL: ACRS NSIC 30 04 10 1
1 LPDR 03 duL 17 ~989 TOTAL NUMBER OF=- COPIES REQUIRED!
LTTR 49 ENCL
4 1
1 I
esp 1 ~
N 1
e n
l'I bL 4
~ i q(+
+JMn WH +y ~
I,~,
gP 4<
I L
4 4
II li k
fl
~
Pile:
G R-1/2, Carolina Power & Light Company July 9, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.
20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS ~ l~ 2, 3~
AND 4 DOCKET NOS. 50-400, 50-401',
50-402',
and 50-403 SIGNATURE RE UIREMENTS POR MATERIAL'DOCUMENTATION
Dear Mr. Denton:
It has been brought'o CP&L's attention recently by several suppliers that the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel'ode,Section XXX, does not contain a specific requirement that material test reports or other documentation be provided with a longhand signature.
On this basis, several of the suppliers provide initialed, stamped or similarly annotated documentation, particularly when the supplier has a large volume of documentation to process.
ANSI N45.2.10-73 requires'ertificates of Conformance, Certificates of Compliance, and Certified Test" Reports to be written and signed.
Due to this situation, CP&L has recently experienced problems in procurement of affected items, primarily steel.
In view of the above, CP&L requests an interpretation of ANSI N45.2.10,.
as invoked'by Regulatory Guide 1.74, as to whether or not Certificates of Conformance, Certificates of Compliance, and Certified Test Reports must contain a longhand signature.
Since this matter is currently impacting our procurement program, it is respectfully requested that a response to this question be provided's soon as practicable.
If the NRC's response is that ANSX N45.2.10 requires a longhand signature (above and beyond the ASME Section IXI requirements), it is recommended that action be initiated to make the ASME and NRC requirements consistent in this area.
TIds would greatly reduce current problems and misunder-'tandings that may now exist.
CP&L'illappreciate your assistance with regard to clarification of this matter.
NJC/gea (5052) cc:
Mr. V. Stello Mr. J. P. O'Reilly Yours very truly, M. A. McDuffie Senior Vice President O.",i.
Engineering and Construction 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602 80 0 V 150$ 3Z'
I' 1,
0 0
IVl
+~
~O UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, o. C. 20S55 June 30, 1980 TO ALL APPLICANTS FOR CONSTRUCTION PERMITS, POMER REACTOR LICENSEES, ARCHITECT/ENGINEERS AND REACTOR VENDORS I am encIosing for your information a notice which has been forwarded to the Office of the Federal Register for publication.
This notice relates to regional meetings which will be held, beginning July 14, 1980, to address the portion of the Commission's Memorandum and Order dated May 23, 1980, which describes requirements pertaining to environmental qualification of electrical equipment installed in safety systems.
Sincerely,
Enclosure:
Notice cc w/encl:
Service Lists rrell G.
- senhut, Director Division o fcensing
7590-01 FEDERAL REGISTER NOTICE IMPLY>ENTATION OF RE)UIREMENTS FOR ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT AGENCY:
U. S.
Nucl ear Regulator g Comniss i on ACTION:
NOTICE OF MEETING SUR~ARY:
On May 23,
- 1980, the NRC issued a Memorandum and Order tha defines Comnission's requirements with r espect to the environmental qualification of electrical equipment at nuclear power plants.
In connection with these new requirements, the NRC will hold regional meetings to explain in more detail each of the require-ments..
Dates and Locations of Re ional Meeti n s to be Held from 8:30 A.M. to 3:OO P.M.
July T4, 1980 - Region [
Holiday Inn 260 Goodard Boulevard King of Prussia, Pennsylvania July 15, 1980 - Region II Hyatt Regency Lancaster Room 265 Peachtree Str et, N.E.
Atlanta, Georgia July 16, 1980 - Region III P
July 17, 1980 - Region IV 5 V
Marriott O'Hare Motel 8535 M. Higgins Road Chicago, Illinois Holiday Inn North Irving, Texas
7590-01 FOR FURTHER INFORMATION CONTACT:
Robert A. Purple, Oivishon of Licensing U.S. Nuclear Regulatory Coamssion Washington, O.C.
20565 (301) 492-7672 SUPPL~>>NTAL INFO@STION:
The primary purpose. of these meetings will be to:
(I) provide a more detailed technical explanation of the new NRC, requiremenu; (2) provide a description of the NRC approach, schedule,.
and administrative procedures to be followed in implenenting these requirements; and (3) provide a forum for discussion of the requirements.
Persons. other than the NRC staff and licensee representatives may observe. the proceedings but will be permitted ta participate in the discussions.
only as: time will aIIow.
Registration of attendees will be conducted prior to. each meeting at the designated locations.
Oated at Bethesda maryland, this 27'h day of June 1980.
FOR T'rlE NUCLEAR REGULATORY COMMISSION arre G.
is mu, rector Oivision of Licensing Office of Nuclear Reactor Regulation