Text
~S Rfoy
~4
~o
Cy
O
I
C
Cl
0
Cy
~O
++*++
In Reply Refer To:
RII:CRM
50"400/80-08
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
APR
4 1980
Carolina Power and Light Company
ATTN: J. A. Jones
Senior Executive Vice President
and
Chief Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
This refers to the inspection
conducted
by C. R. McFarland of this office on
March 19-21,
1980 of activities authorized by NRC Construction Permit No. CPPR-158
for the Shearon Harris Nuclear Power Plant facility, and to the discussion of our
findings held with R.
M. Parsons at the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
One
new unresolved
item resulted
from this inspection
and is discussed
in the
enclosed report.
This item willbe examined during subsequent
inspections.
In accordance
with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold such
information from public disclosure.
Any -such application
must
include
a full statement of the reasons
on the basis of which it is claimed that
the information is proprietary,
and should be prepared
so that proprietary infor-
mation identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report willbe placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E. Murphy,
xe
Reactor Construction
and Engineering
Support, Branch
Enclosure:
See
Page
2
8 0052101 11
Carolina Power and light Company
APR
< ><SO
Enclosure:
Inspection Report No. 50-400/80-08
cc w/encl:
R. Parsons,
Site Manager
P. 0. Box 101
New Hill, NC
27562