Forwards IE Insp Rept 50-400/80-08 on 800319-21.No Noncompliance Noted
ML18017B080
Person / Time
Site: Harris 
Issue date: 04/04/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017B079 List:
References
NUDOCS 8005210111
Download: ML18017B080 (3)


See also: IR 05000400/1980008

Text

~S Rfoy

~4

~o

Cy

O

I

C

Cl

0

Cy

~O

++*++

In Reply Refer To:

RII:CRM

50"400/80-08

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

APR

4 1980

Carolina Power and Light Company

ATTN: J. A. Jones

Senior Executive Vice President

and

Chief Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

This refers to the inspection

conducted

by C. R. McFarland of this office on

March 19-21,

1980 of activities authorized by NRC Construction Permit No. CPPR-158

for the Shearon Harris Nuclear Power Plant facility, and to the discussion of our

findings held with R.

M. Parsons at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

One

new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item willbe examined during subsequent

inspections.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any -such application

must

include

a full statement of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy,

xe

Reactor Construction

and Engineering

Support, Branch

Enclosure:

See

Page

2

8 0052101 11

Carolina Power and light Company

APR

< ><SO

Enclosure:

Inspection Report No. 50-400/80-08

cc w/encl:

R. Parsons,

Site Manager

P. 0. Box 101

New Hill, NC

27562