Text
~S RE0y
~4
~o
Cy
I
nO
+0
+0"
++*++
In reply Refer To:
RII:RDB
50-400/80-07
50-401/80-07
50-402/80-07
50-403/80-07
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
gpR l5 $980
gooSS00008
Carolina Power and Iight Company
ATTN:
J. A. Jones
Senior Executive Vice President
and
Chief Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
This refers to the inspection
conducted
by R. D. Bradley of this office on
March 4-7,
1980 of activities authorized
by NRC Construction Permit Nos.
CPPR-158,
CPPR-159,
CPPR-160
and CPPR-161 for the Shearon Harris Nuclear Power Plant
facility, and to the discussion of our findings held with R.
M. Parsons
at the
conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
within these areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Ve have examined actions you have taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed
inspection report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
This item and references
to pertinent requirements
are listed in the Notice of Violation enclosed
here"
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal
Regulations.
Section 2.201 requires
you to submit to this office, within 20
days of your receipt of this notice,
a written statement
or explanation in reply
including:
(1) corrective steps
which have been taken by you and the results
achieved;
(2) corrective steps
which will be taken to avoid further noncompli"
ance;
and (3) the date
when full compliance will be achieved.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should be prepared
so
.,/
Carolina Power and Light Company
APR 15 1980
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document
Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them,with you.
Sincerely,
Charles
E. Murphy, Chief
Reactor Construction
and
Engineering Support Branch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-400/80-07,
50-401/80-07,
50-402/80-07
and
50-403/80-07
~
~