Forwards IE Insp Repts 50-400/79-09,50-401/79-09, 50-402/79-08 & 50-403/79-08 on 790425-26.No Noncompliance Noted
ML18017A558
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/22/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017A557 List:
References
NUDOCS 7907110589
Download: ML18017A558 (3)


See also: IR 05000400/1979009

Text

i~1 P,A Rfg~

4y*~4

In Reply Refer To:

RII:ALC

50"400/79-9

50-401/79"9

50-402/79"8

50-403/79-8

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

MAY 2 2 1S79

Carolina Power and Light Company

ATTN: Mr. J. A. Jones

Executive Vice President

and

Chief Operating Officer

411 Fayetteville Street

Raleigh,

N C

27602

Gentlemen:

This refers

to the inspection

conducted

by A. L. Cunningham of this office on

April 25-26,

1979,

of activities

authorized

by

NRC Construction

Permit Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Shearon Harris Nuclear Pover

Plant, Unit 1, 2,

3 and

4 facilities, and to the discussion of our findings held

with G. L, Forehand at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined

actions

you have

taken with regard to previously identified

enforcement matters.

These are discussed in the, enclosed inspection report.

In accordance

vith Section 2.790 of the

NRC's

"Rules of Practice",

Part 2,

Title 10,

Code of Federal

Regulations,

a

copy of this letter and the enclosed

inspection report vill be placed in the

NRC's Public Document

Room. If this"

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information, from public disclosure.

Any such

application

must include

a full statement

of the reasons

on the basis of vhich

it is claimed that the information is proprietary,

and

should

be prepared

so

that proprietary information identified in the application is contained

in a

separate

part of the document.

If we do not hear

from you in this regard within

the specified period, the report will be placed in the Public Document Room.

0yyxo 5

gAY 8 8 19>9

Carolina Power and Light Company

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosure:

Inspection Report Nos.

50"400/79-9) 50"401/79-9)

50-402/79-8

and 50-403/79-8

cc w/encl:

R. Parsons,

Site Manager

P. 0.

Box 101

New Hill, NC

27562

J. T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

'I