Text
~8 REGS
~ ~h
~o
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 2055&0001 CAROLINA POWER
& LIGHT COMPANY et al.
DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 MENDMENT TO FACI ITY OPERATING LICENS Amendment No. 74 License No.
NPF-63 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power
& Light Company, (the licensee),
dated February 21,
- 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No.
NPF-63 is hereby amended to read as follows:
97i0060ii9 970930 PDR ADQCK 05000400 P
3.
(2) Technical S ec'fications and Environmental P otection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached
- hereto, as revised through Amendment No. 74, are hereby incorporated into this license.
Carolina Power 5 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications es E.
Lyon
, Di ector oject Direct a
II-I vision of Reac r Projects - I/II fice of Nuclear Reactor Regulation Date of Issuance:
September 30, 1997
ATTACHMENT TO LICENSE AMENDMENT NO.
ACILITY OPERATING LICENSE NO.
NPF-63 DOCK T NO. 50-400 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised area is indicated by a marginal line.
Remove Pa e
3/4 3-26 Insert Pa e
3/4 3-26
TABLE 3.3-3 Continued TABLE NOTATIONS
'The provisions of Specification 3.0.4 are not applicable.
ITrip function may be blocked in this MODE below the P-11 (Pressurizer Pressure Interlock) Setpoint.
- During CORE ALTERATIONS or movement of irradiated fuel in containment, refer to Specification 3.9.9.
- ~Trip function automatically blocked above P-11 and may be blocked below P-ll when Safety Injection on low steam line pressure is not blocked.
ACTION STATEMENTS ACTION 14 -
With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />;
- however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.
ACTION 15 -
With the number of OPERABLE channels one less than the Total-Number of Channels, operation may proceed until performance of the next required CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
ACTION 16 -
With the number of OPERABLE channels one less than the Total Number of Channels.
operation may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and the Minimum Channels OPERABLE requirement is met.
One additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1.
ACTION 17 -
With less than the Minimum Channels OPERABLE requirement, operation may continue provided the Containment Purge Makeup and Exhaust Isolation valves are maintained closed while in MODES 1, 2.
3 and 4 (refer to Specification 3.6.1.7).
For MODE 6, refer to Specification 3.9.4.
ACTION 18 -
With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SHEARON HARRIS - UNIT 1 3/4 3-26 AMENDMENT NO. 74
0