ML18011A178

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1993 for Harris Nuclear Power Plant,Unit 1.W/930914 Ltr
ML18011A178
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/31/1993
From: Crenshaw A, Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO931035, NUDOCS 9309200171
Download: ML18011A178 (9)


Text

ACCELERA"I'4g DOCUMENT DIST ~UTION SYSTEM REGULARLY INFORMATION DISTRIBUTI SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH. NAME 'UTHOR Carolina AFFILIATION 05000400 CRENSHAW,A. Power a Light Co.

ROBINSON,W.R. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operat'or Plant, Unit l., 930914 ltr. Aug 1993 for Harris Nuclear Power D

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. osooo4oo 1 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 3 3 PD2-1 PD 1 1 LE,N 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DORS/OEAB 1 1 NRR/DRIL/RPEB 1 1 :EG- 01 1 1 RGN2 1 1 EXTERNAL EG6tG BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT TI IE DOCUMEN'I'ON1'ROL DESV ~

ROOM Pl-37 (EXT. 504-206S) TO ELIMINATEYOUR NA)AE Fl<OM DIS fRIIIU'I'ION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

~Ef' 4 1995 Carolina Power & Light Company PO Box 1551 Raleigh, NC 27602 File Number: SHF/10-15505 Letter Number: H0931035 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company heiewith submits the report of operation statistics and shutdown experience for the month of August 1993.

Yours very truly, W. R. Robinson General Manager Harris Nuclear Plant APC:bdd Enclosure c: Mr. S. D. Ebneter (NRC-RII)

Mr. J. E. Tedrow (NRC-SHNPP)

MIS/MTH-OPR.RPT/1/OS4

,930920017l 930831' PDR;, ADOCK 05000400

) PDR

r J

tsF w

~ l I f qp

DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: August 1993 COMPLETED BY: Amanda Crenshaw OPERATIONS SULTRY Harris Unit 1 operated at 100 percent Availability Factor for the referenced month and a 99.01 percent Capacity Factor. There was one significant power reduction.

There are 157 fuel assemblies in the reactor vessel and 997 spent fuel assemblies stored in the spent fuel pools. 549 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant. 224 of the spent fuel assemblies are from CPKL's Robinson Plant.

MISNMTH-OPR.RPTX2%0S4

CPbl CO .~LANT PERFORMANCE DATA SYSTEM PAGE RUN DATE 69/16/93 OPERATING DATA REPORT RPD36-000 RUN TIME 69: 40: 56 HARRIS UNIT 1 DOCKET HO. 050-400 COMPLETED BY AMAHDA CRENSHAM OPERATING STATUS TELEPHONE (939)362-2868 UNIT NAME: HARRIS UNIT 3 NOTES

2. REPORTIHG PERIOD: AUGUST 93 I See Operations Summary.
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9 I
5. DESIGH ELECTRICAL RATING (NET MME): 960.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (HET MWE): 860.6
8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7) SIHCE LAST REPORTS GIVE REASONS: None.

POWER LEVEL TO WHICH RESTRICTED IF AHY (NET MWE): None.

16, REASONS FOR RESTRICTION IF ANY: N/A TH1S YR TO CUMUL MONTH DATE ATIVE HOURS IH REPORTIHG PERIOD 744.00 5833 .00 55536.00

12. NUMBER OF HOURS REACTOR CRITICAL 744.60 5864.43 45373.31
13. REACTOR RESERVE SHUTDOWN HRS .00 .06 .00
34. HOURS GENERATOR OH LINE 744.00 5792.45 44848.63
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00

$ 6. GROSS THERMAL ENERGY GEH. (MWH) 2050427.52 15896446.98 $ 19243552.42

$ 7. GROSS ELEC. ENERGY GEH. (MWH) 675226.00 5333002.80 39747843.66

$ 8. HET ELEC. ENERGY GENERATED (MWH) 633523.68 5085660.00 37636736.66

19. UNIT SERVICE FACTOR 166.66 99.34 80.76
20. UNIT AVAILABILITYFACTOR $ 66.66 99.34 80.76
21. UNIT CAP. FACTOR (USING MDC HET) 99.6$ 99.83 77.49
22. UNIT CAP. FACTOR (USING DER HET) 94.63 95.37 74.05
23. UNIT FORCED OUTAGE RATE .00 .60 3.55
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATIOH OF EACH):

None.

25. IF SHUTDOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IH TEST STATUS (PRlOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 MIS /MTH-OPR. RP T/3/OS 4

r CPhL CO LANT PERFORMANCE DATA SYSTEM PAGE RUH DATE 09/10/93 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUH TIME 09:40:56 HARRIS UNIT f DOCKET HO. 050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2808 AUGUST 3993 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-HET) (MWE-HET) 857 853 854 858 857 859 856 720 866 862 867 24 861 30 859 27 859 862 858 817 855 857 852 1.16 8 MIS/MTH-OPR. RPT/4/OS4

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: September 09, I

BY: A. P. Crenshaw 1993'OMPLETED O

ra TELEPHONE: (919) 362-2808 REPORT MONTH: August 1993 O

R~

e T' a s Method of P Duration 0 Reactor'icensee Shutting Down Event System Component Cause and Corrective Action No. Date e (Hours) n Report ¹ Code 4 Code 5 to Prevent Recurrence 93%04 930822 0.0 A N/A HH Valve Unit power reduced to 85% to perform the monthly turbine valve test. During performance of the test, a leak was detected on 1HD-325, Moisture Separator Reheater Drain Tank "B" Outlet to Condenser Level Control Valve, and power was further reduced to 80% for repairs to the valve. The turbine valve test and 1HD-325 repairs were satisfactorily completed and the unit was returned to 100%.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-01 61)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 -Same Source H-Other (Explain)

I I t,