ML18010B014

From kanterella
Jump to navigation Jump to search
Annual Operating Rept, Consisting of Info Re Number of Personnel & man-rem by Work & Job Function & Primary Coolant Iodine Spikes
ML18010B014
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1992
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-930049, NUDOCS 9302220334
Download: ML18010B014 (8)


Text

ACCEI E D DOCUMENT DIS UTION SYSTEM REGULA RY INFORMATION DISTRIBUTI SYSTEM (RIDS)

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME

'UTHOR AFFILIATION VAUGHN,G.E.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 0500040(

D

SUBJECT:

"Annual Operating Re t," consisting of info re number of I

personnel

& ma-rk

& job function

& primary coolant

=

iodine spikes W/930211 r.

DISTRIBUTION CODE:

IE56D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 20.407 Annual Personnel Monitoring Rpt/Annual Rad Exposure Rpt by Fur.

S NOTES:Application for, permit renewal filed.

0500040t:

RECIPIENT ID CODE/NAME PD2-1 LA LE,N COPIES RECiPIENT LTTR ENCL ID CODE/NAME 1

0 PD2-1 PD 1

0 COPIES LTTR ENCL 5

5 D

INTERNAL: ACNW NMSS/SCDB/SSSS NRR/DREP/PRPB11 RES RADDATZ,C EXTERNAL: NRC PDR 6

6 1

1 2

2 1

1 1

1 AEOD/DSP/TPAB NR /DOEA/OEABll REG~IlggQ 0 2 RGN2 01 NSIC 1

1 1

1 1

1 1,

1 1

1 D

R D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 23 ENCL'1

Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G.E. VAUGHN Vce President Harris Nudear Plant FEB 1

1 1993 Letter Number:

HO-930049 Document Control Desk United Stat:es Nuclear Regulatory Commission Washington, DC 20555 II SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO.

50-400 LICENSE NO. NPF-63 ANNUAL OPERATING REPORT Gentlemen In accordance with Technical Specification 6.9 '.2 for the Shearon Harris Nuclear Power Plant, Unit No.

1, Carolina Power and Light Company herewith submits the annual report of (a) individuals receiving exposures greater than 100 mrem/yr and their associated man-rem exposure according to work and j ob functions, (b) primary coolant iodine

spikes, and (c) challenges to the pressurizer power-operated relief valves (PORVs) and primary safety valves for 1992.

Very truly yours, Vice President Harris Nuclear Plant MGW:dtp Attachment cc:

Mr. S.

D. Ebneter (NRC

- RII)

Ms.

C. T. Raddatz (NRC - REIRS Project Manager)

Mr. J.

E. Tedrow (NRC -

SHNPP) 1S0130 MEM/HO-930049/1/OS1

'rt302220334

'tt21231 PDR ADOCK 05000400 R

PDR

Document Control Desk Page 2

RZMS ZZ NUMBER OF PERSONNEL AND HAN REM BY WORK AND JOB FUNCTION, 1992 HARRIS PLANT

. NUMBER OF'PERSONNEL,>

100 HREM I'OTALHAN"REH WORK,AND JOB FUNCTION STAT UTIL CNTR I

STAT CNTR REACTOR OPERATZONS AND SURVEILLANCE MAINTENANCE PERSONNEL 3

OPERATING PERSONNEL 48 HEALTH PHYSICS PERSONNEL 27 SUPERVISORY PERSONNEL 0

ENGINEERING PERSONNEL 4

0 1

0 0

0 33 0

1

'0 2

2.264 12.746 8.425 0.258 1.986 0.000 o.eeo 0.010 o.e50 0.340 0.603

  • 1.026 9.812 0.415-0.966 ROUTINE MAINTENANCE MAINTENANCE'PERSONNEL OPERATZNG PERSONNEL HEALTH PHYSICS. PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL ZNSERVICE ZNSPECTION MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL SPECIAL MAZNTENANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERZNG PERSONNEL WASTE PROCESSING HAINTENANCE P ERSONNEL OPERATING PERSONNEL.

HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL REFUELING HAINTENANCE P ERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL TOTAL HAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGZNEERZNG PERSONNEL 55 7

190 2

0 2

16 0

34 1

0 0

6 0

48 6

~

2 28 0

0 0

0 0

0 0

0 0

4 0

28 23 0

27 2

0 0

15 0

1 0

0 0

4 0

3 0

0 0

0 0

0 3

0 0

0 0

0 0

0 1

1 0

0 0

0 0

0

.1 0

0 0

0 1

0 88 9

250 44 0

2 61 0

69 1

0 1

18 1

82 27.253 1.876 5;746, 0.448 3.542

2. 106 0.448 0.530 0.055 1

~ 461 6.111 0.518 5.250 0,056 1.078 0.385 0.045 1.475 0.000 0.015 0.350 0

~ 495 0.090 0,025

0. 115 38.469
16. 128 21.516 0

~ 834

8. 197 3.068 0.000 e.eeo e.e70 0.430 0.440

, 0.000 e'.eeo 0.000 0.G10 0.034 e.eeo 0.000 0.000

0. 118 o.eeo 0.000 e.eoo 0.000 8.000 0.000 0.000 e.eoo 0.000 0.23G 3.534 0.000 0.010
0. 126
1. 128 72.749 0.499 10.460 6.610 22.692 9.745
0. 195 0.300 8.000 8.215
8. 929 0.045 0.425 0.025 1.111 0.270 O.OGO
0. 375 G.eeo 0.675 2.260

~

0.000 0.310 0.800 G.290 94.556 1.765 21.682 0.450 33.949 GRAND TOTAL 212 10=

404

85. 144 4.792 152.402 Not'es:

(1)

Dose based on pocket dosimeters (2)

Stat

~ Harris Plant Staff Util ~ CP&L non-Harris personnel Cntr ~ Contractor MEM/HO-930049/2/OS1

e Document Control Desk Page 3

1992 ANNUAL REPORT PRIMARY COOLANT IODINE SPIKES During 1992, the primary coolant did not exceed 1.0 pCi/gram dose equivalent I-131 or 100/E-bar pCi/gram gross radioactivity as set forth in Technical Specification 3.4.8.

MEM/HO-930049/3/OS1

e~

Document Control Desk Page 4

1992 ANNUAL REPORT PRIMARY SAFETY AND RELIEF VALVE CHALLENGES During 1992, there were no challenges to the primary power operated relief valves (PORVs)

.or the primary safety, valves.

MEM/HO-930049/4/OS1