ACCELERATED gggTRIBUTION DEMOY "RATIONSYSTEM REGULAlMY INFORNATIQN DISTRIBUTIO SYSTEN (RIDS>
FACIL: 50-400 Shearon Harris Nuclear Poeer Planti Unit 1~ Carolina AUTH. MANE AUTHOR AFFILIATION CRENSHAN> A.
Carolina Poeer Sc Light Co.
VAUGHNiG. E.
Carolina Poeer 8c Light Co.
REC IP. MANE RECIPIENT AFFILIATION DOCKET 05000400 I
0 OSOOO400~
NOTES: Application for permit reneeal filed.
SUBJECT:
Nonth 1g rept for Jul 1992 for Harris Nuclear Poeer unit
.IRI/'F20827 1
DISTRIBUTION CODE:
ISSUED COPIES RECEIVED: LTR ENCL i SIZE:
TITLE: Nonthlg Operating Report (per Tech Specs)
RECIPIENT ID CODE/NAME PD2-1 LA LEi N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OE*B RGN2 EXTERNAL: EQM BRYCE> J. H NSIC COPIEB LTTR ENCL 3
3 1
10 10 1
1 1
1 1
1 1
RECIPIENT ID CODE/MANE PD2-1 PD AEOD/DOA RRsi9 PEB10 REG FILE 01 NRC PDR COP IEB LTTR ENCL 1
1 1
1 1
1 1
1 1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (DT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!.
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
COLL Carolina Power & Light Company P.O. Box t65 ~ New HIII,NC 27562 G. E. VAUGHN Vice President Harris Nuciear Project r AUG 3'I 1992 File Number:
SHF/10-15505 Letter Number:
HO-923025 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power 6r Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1992.
Yours very truly, APC:bsh Enclosure err.
G.
E. Vaughn Vice President Harris Nuclear Project cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP)
MEM/DATAREP/1/OS4 9208i902i3 92073i
',Pg fj,'
~~
PDR ADDCK 05000400 R
4 N
H ly
DOCKET NO.:
UNIT DATE COMPLETED BY:
050-400 Harris Unit 1 July 1992 Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 71.75 percent Availability Factor for the referenced month and a 63.89 percent Capacity Factor.
There were three significant power reductions in July and one reactor trip signal that was received while the-unit was shutdown.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel, 731 spent fuel assemblies stored in the Spent Fuel Pools:
413 of the spent fuel assemblies are BWR and were shipped to Harris from.CP&L's Brunswick Plant.
154 of the spent fuel assemblies are from CP6L's Robinson Plant.
In addition to the spent fuel, 60 new fuel assemblies were received from Westinghouse and are in dry storage racks.
MEM/DATAREP/1/OS4
E
~
Yg
)
b
CPbL CO
~LANT PERFORMANCE DATA SYSTEM Al)t< DATE 08/07/92
~ ~
OPERATIHG DATA REPORT RUH TIME 13:OS:29 HARRIS UNIT 1
" PAGE RPD36-000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY AMANDA CREHSHAW TELEPHONE (919)362-2808 oj
- 3 4 4,
5.
6.
7 4 8.
UNIT NAME:
HARRIS UNIT t
NOTES REPORTING PERIOD:
JULY 92 I
CEH E
E MA WE MW See Operations Summary NAt1EPLATE RATING (GROSS MME): 950.'9 DESIGN ELECTRICAL RATING (NET MME): 900.0 MAX DEPENDABLE CAPACITY (GROSS MME): 920.0 t
MAX DEPENDABLE CAPACITY (NET MWE): 860.0 IF CHANGES OCCUR IH CAPACITY RATINGS,(ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
None.
10.
POt)ER LFVEL TO MHICH"RESTRI'CTED'F" AHY (HET'*MME >:
~ None REASOHS FOR RESTRICTION IF ANY:
N/A THIS MONTH YR TO DATE CUMUL ATIVE HOURS IN REPORTING PERIOD 744.00 5111.00 46032.00 12.
NUMBER OF HOURS REACTOR CRITICAL S53.33 4793.95 37781.9S 13.
REACTOR RESERVE SHUTDOWN HRS
.00
.Oe i
.00 14.
HOURS GENERATOR ON LINE 533.81 4764.83 37318;93 15.
UNIT RESERVE SHUTDOWN HOURS
.00
.00
,. 00 16.
GROSS THERMAL EHERGY GEH.
(MWH) 1365812.82 12795285.24 98771409.72 17.
GROSS ELEC.
ENERGY GEH.
<MWH) 445437.00 4286822.00 32888185.00 18.
HET ELEC.
EHERGY GEHERATED (MWH) 408765.00 4006312.00 30684975.00 UNIT SERVICE FACTOR 71.7S
~ 93.23 81.07 20.
UNIT AVAILABILITYFACTOR 71.75 93.23
- 81. 07 21.
UNIT CAP.
FACTOR (USING MDC NET.>
63.89 91.15
- 77. 31 22.
UNIT CAP.
FACTOR (USING DER HET) 61.05 87.10 73.87 23.
UNIT FORCED OUTAGE RATE 28.25 6.77 4.23 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS (TYPE,
- DATE, AND DURATIOH OF EACH):
Refueling Outage Number 4 scheduled to begin September 12, 1992 and be completed November 21;,
1992..
2S.
IF SHUTDOWN'T EHD OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IH TEST STATUS
< PRIOR TO COMMERCIAL OPERATION>:
FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9
MEN/DATAREP/2/OS4
CPbL CO PLANT PERFORMANCE DATA SYSTEM RUN DATE, 08/07/92 APP~~IX B AVERAGE DAILY POWER LEV
'lJN TIME
$ 3: 05: 27 M
HARRIS UNIT (
PAGE RPD39-000 DOCKET NO. 050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2808 JULY 1992 DAY AVG. DAILY POWER LEVEL (MWE"NET) 860 DAY AVG. DAILY POWER LEVEL (MWE-NET) 860 862 868
-'79 868 864 856
-24 238 832 (0
858 854 28 858 857 8
3e I5 286 1.16 8
MEM/DATAREP/3/OS4
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:
Harris DATE:
08/07/92 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 REPORT MONTH: July 1992 No.92-010 Date 920712 T
y
'P e
Duration (Hours) 62.12 R~
e a
s-0 n
A Method of Shutting Down Reactor'icensee Event Report 0'2-007 System Code 4 Component Code 5 XXXXXX Cause & Corrective Action to Prevent Recurrence Reactor trip after loss of condenser vacuum due to a ruptured LP turbine exhaust boot seal.
The ruptured potion of the boot seal was repaired by splicing in a new section at the failed area.
Unit back on line at 16:15 on 7-14-92.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-01 61) 5 Exhibit 1 - Same Source H-Other (Explain)
1 J
l t,
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:
Harris DATE:
08/07/92 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 REPORT MONTH: July 1992 No.
Date Tl y
P e
Duration (Hours)
~
Rz e
a s
0 n
Method of Shutting Down Reactor'icensee Event Report ¹ System Code 4 Component Code 5 Cause 5 Corrective Action to Prevent Recurrence 92-01 1 920713 F
0.0 92-008 ZZ XXXXXXX Reactor trip from 0% power due to "B" steam generator Low-Low level trip signal.
Level decreased below setpoint while starting "A" condensate booster pump.
Trip signal was received while unit was offline.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error (Explain).
H-Other (Explain)
'Duration hours equaled zero due to unit not online.
3'ethod:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load
'-Other 4
Exhibit G-Instructions for Preparation 'of Data Entry Sheets for Licensee Event Report (LER) File (NUREG%161) 5 Exhibit 1 - Same Source
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:
Harris DATE:
08/07/92 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 REPORT MONTH: July 1992
'I No.
Date Tl y
P e
Duration (Hours)
Rz e
a s
0 n
Method of Shutting Down Reactor~
Licensee Event Report ¹ System Code 4
,Component Code 5 Cause S.Corrective Action to Prevent Recurrence 92-012 920715 19.62 A
92-009 zz xxxxxx Manual reactor trip initiated due to loss of "B" Main Feed Pump.
Suction pressure could not be maintained after de-energizing BUS -"1 D-2 to prevent E-18 exhaust fan from becoming a fire hazard when it's circuit breaker failed to open and dampers were closed.
Unit back online at 22:27 on 7-15-92.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-01 61) 5 Exhibit 1 - Same Source
F t
V t
Ir II
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: July 1992 UNIT NAME:
Harris DATE:
08/07/92 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 No.
Date Tr y
P e
Duration (Hours)
R~
e a
s 0
n Method of Shutting Down Reactor'icensee Event Report ¹ System Code 4 Component Code 5
~ Cause & Corrective Action to Prevent Recurrence 92-013 920717 F
128.45 A
92-010 CH XXXXXX Reactor trip after loss of condenser vacuum due to ruptured LP turbine exhaust boot seal.
The entire boot seal on both LP turbines was replaced.
Unit back online at 20:45 on 7-22-92.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other-4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit 1 - Same Source
0 4
I
~
A