ML18010A605
| ML18010A605 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/16/1992 |
| From: | Adensam E Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML18010A606 | List: |
| References | |
| NPF-63-A-028 NUDOCS 9204220225 | |
| Download: ML18010A605 (7) | |
Text
~p,P REQog,p 0
I 0
Cy Cy t7 +**++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555 CAROLINA.POWER 8
LIGHT-COMPANY et al.
OOCKET.NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
28 License No.
NPF-63 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
B.
The application for amendment by Carolina Power 5 Light Company, (the licensee),
dated August 26,
- 1991, compl,ies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set-forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules an'd regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities wi 11 be conducted in compliance with the Commission's regulations; D.
The issuance of this amen'dment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part
'1 of the COIImission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-63 is hereby amended to read as follows:
(
9204220225 920416 PDR ADOCK 05000400 P
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix 8, both of which are attached
- hereto, as revised through Amendment No. 28, are hereby incorporated into this license.
Carolina Power 5 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.
fOR THE NUCLEAR REGULATORY COMMISSION zg=
A'linor G. Adensam, Director Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical
'Specifications Date of Issuance:
April i6, ]992
ATTACHMENT TO LICENSE AMENDMENT NO.
FACILITY OPERATING LICENSE. NO.
NPF-63 DOCKET NQ. 50-400 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised areas are indicated by marginal lires.
Remove Pa es 3/4 8-1 3/4 8-11
~i<
and b. Two separate and independent diesel generators, each with: 1 ~ A separate day tank containing a minimum of 1457 gallons of fuel, which is equivalent to a minimum indicated level of 40X-.-, 2. A separate main fuel oil storage tank containing a minimum of 100,000 gal.lons of fuel, and 3. A separate fuel oil transfer pump-APPLICABILITY: MODES 1, 2, 3 and 4. ACTION: a. With one offsite circuit of 3.8.l.l.a inoperable, demonstrate the OPERABILITY of the remaining'.C. sources by performing Surveillance Requirement 4.8. 1. 1. l.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If either emergency diesel generator (EDG) has not been successfully tested within the 24-hours preceding entry into this ACTION, demonstrate its OPERABILITY by performing Surveillance Requirement 4.8.1 ~ 1 '.a.4 and a.6 separately for each such EDG within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours and COLD SHUTDOWN within the following 30 bourse'. With one diesel generator of 3.8 ~ 1.1.b inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.l.l.l.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter', and if the EDQ became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE EDG performing Surveillance Requirement 4.8.1.1.2.a.4 and a.6 within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*f; restore the 5I
- This test is required to be compl.eted regardless of when the inoperable EDG is restored to OPERABILITY.
4Activities that normally support testing pursuant to 4.8.1.1.2.a.4 and a.6> which would render the diesel inoperable (e.g., air rol,l), shall not be per" formed for testing required by this ACTION statement. '~Minimum indicated level with a fuel oil specific gravity of 0.83 and the level instrumentation calibrated to a reference specific gravity of 0.876. SHEARON HARRIS " UNIT 1 3/4 8-1 Ame'ndment No. 28 ELECTRICAL POWER SYSTEMS A.C. SOURCES SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE: a. One circuit between the offsite transmission network and the onsite Class 1E distribution system, and b. One diesel generator with: 1. Day tank containing a minimum volume of 1457 gallons of fuel, which is equivalent to a minimum indicated level of 40X>>-, 2. A separate main fuel oil storage tank containing a minimum volume of 100,000 gallons of fuel, and 3. A fuel oil transfer pump. APPLICABILITY: MODES 5 and 6. ACTION: With less than the above minimum required, A.C. electrical power sources OPERABLE, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity changes, movement of irradiated fuel, or crane operation with loads over irradiated fuel and within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, depressurize and vent the Reactor Coolant. System through a vent of greater than or, equal to 2.9 square inches. In addition, when in MODE 5 with the reactor coolant loops not filled, or in MODE 6 with the water level less than 23 feet above the reactor vessel
- flange, immediately initiate corrective action to restore the required sources to OPERABLE status as soon as possible.
SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the requirements of Specifications 4.8.1.1.1 and 4.8.1.1.2. Minimum indicated level with a fuel oil specific gravity of 0.83 and the level instrumentation calibrated to a reference specific gravity of 0.876. SHEARON HARRIS - UNIT 1 3/4 8-11 Amendment No.