ACCELERATED DI RIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9112170075 DOC. DATE: 91/11/30 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.
Carolina Power
& Light Co.
RICHEY,R.B.
Carolina Power
& Light Co.
RECIP.NAME RECIPXENT AFFXLXATION DOCKET 05000400
SUBJECT:
Monthly operating rept for Nov 1991 for Harris Unit 1.W/
911211 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL i SIZE:
TXTLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
D 05000400 /
RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.
INTERNAL ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPXENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR D
LPEB10 FILE 01 NRC PDR COPXES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
Carolina Power & Light Company P. O. Box 165 ~ New Hill,N. C. 27562 R. B. RICHEY Vice President Harris Nuclear Project DEC j f i99)
File Number:
SHF/10-15505 Letter Number:
HO-913025 (0)
Document Control Desk United States Nuclear Regulatory Commission Vashington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of November 1991.
Yours very truly, R.
B. Richey Vice President Harris Nuclear Project APC:svm Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP)
~ V il~
MEM/DATAREP/OS4 91'12170075 911130 PDR ADOCK 05000400 R
1
~"4 f
DOCKET NO.:
050-400 UNIT:
Harris Unit 1 DATE:
November 1991 COMPLETED BY:
Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 97.75 percent Capacity Factor.
There was one event.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
, There are 157 fuel assemblies in the reactor vessel, 675 spent fuel assemblies stored in the Spent Fuel Pools.
413 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
98 of the spent fuel assemblies are from CPGL's Robinson Plant.
MEM/DATAREP/1/OS4
I 1k
,CPaL CO RUH DATE 12/85/91
~,. 'RUN TIME
> 5: 27: 00 PLAHT PERFORMANCE DATA SYSTEM t
OPERATING DATA REPORT HARRIS UNIT 1
PAGE RPD36-000 OPERATING STATUS DOCKET NO. 058-400 COMPI ETED BY AMANDA CRENBHAW TELEPHONE (919)362-2888 UNIT NAME:
HARRIS UNIT 1
HOTES 2.
REPORTIHG PER10D:
NOVENBER I See Operations Summary.
3.
LICENSED THERMAL POWER (MWT): 2775 I
4.
NAMEPLATE RATING (GROSS MWE): 950.'9 I
5.
DESIGN ELECTRICAL RATING (NET MWE): 900.0 I
6.
NAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.
MAX DEPENDABLE CAPACITY (NET MWE): 860.0
- 8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): None 30.
REASONS FOR RESTRICTION IF ANY:
H/A THIS MONTH YR TO DATE CUMUL ATIVE HOURS IH REPORTIHG PERIOD 3 2.
NUMBER OF HOURS REACTOR CRITlCAL 13.
REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR OH LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEH.
(MWH) 17.
GROSS ElEC.
ENERGY GEH.
(MWH)
<8.
HET ELEC.
EHERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 2f. UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS None.
728.00 720.80
.00 720.00
.80 1989828.26 6462)1.88 605284.00 388.88
$ 88.88 97.75 93.4<
.00 (TYPE,
- DATE, 883 6.00 6397.93
.08 6337.75
.00 16888481.28 5659834.08 5275550.00 79.06 79.06 76.53 73.f3
.88 AND DURATION 48177.88 32244.80
.00 31818.10
.00 83943725.58 27931768.88 25952720.80 79.37 79.<7 75.11 71.77 3.94 OF EACH):
- 25. IF SHUTDOWH AT EHD OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IH TEST STATUS (PRIOR TO COMNERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1
~ 16 9
MEM/DATAREP/2/OS4
I Y
P IJ
..CPb,l CO PLANT PERFORHANCE DATA SYSTEN RUN DATE 12/05/93 APP~(X B AVERAGE DAILY POWER LEV
%UN -TINE 15: 26: 59
~
HARRIS UNIT 1
V PAGE RPD39-090 HOVENBER 1991 DAY AVG. DAILY POWER LEVEL (HWE-NET)
DOCKET HO. 058-400 COHPLETED BY ANANDA CRENSHAW TELEPHONE (919)362-2808 DAY AVG. DAILY POWER LEVEL (AWE-NET) 884 878 890 891 17 20 2$
884 887 880 868 847 10 888 877 359 22 26 873 880 884 888 856 889 882 886 882 28 30 880 874 16 880 877 1.16 8
MEM/DATAREP/3/084
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:
Harris DATE:
12/05/91 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 REPORT MONTH: November 1991 No.
91%18 Date 911108 Tl y
P e
Duration (Hours) 0.0 R~
e a
s 0
n Method of Shutting Down Reactor~
Licensee Event Report ¹ N/A System Code 4 CH Component Code 5 HTEXCH Cause 5 Corrective Action to Prevent Recurrence Reduced unit power to 46% to repair tube leaks in the "4B" feedwater heater.
A total of 23 tubes were plugged.
Before returning the unit power to 100%, a turbine valve test was performed and maintenance work was done on both the
'A and 'B'ondensate booster pumps.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
K-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other
'4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit 1 - Same Source
~
0