ML18010A383
| ML18010A383 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/31/1991 |
| From: | Hale M, Richey R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HO-913022-(O), NUDOCS 9109190119 | |
| Download: ML18010A383 (10) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9109190119 DOC.DATE: 91/08/31 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.
Carolina Power
& Light Co.
RICHEY,R.B.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILXATXON DOCKET 05000400 R
SUBJECT:
Monthly operating rept for Aug 1991 for Harris Nuclear Power Plant, Unit 1.W/910916 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
D NOTES:Application for permit renewal filed.
05000400 y
RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.
XNTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/J3LPQ/LPEB10
~~ILE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 A
D D
NOTE TO ALL"RIDS" RECIPIENTS:
A D
D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUXRED:
LTTR 24 ENCL 24
Carolina Power & Light Company P. O. Box 165 ~ New Hill,N. C. 27562 R. B. RICHEY Vice President Harris Nuclear Project SEP 1
6 1991 File Number'SHF/10-15505 Letter Number'HO-913022 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of August 1991.
Yours very truly, R. B. Richey Vice President Harris Nuclear Project APC:smh Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP) c 9109190119 910331 iPDR ADQCK 05000400
'i','DR MEM/DATAREPa/1/OS4
1 l
L I
DOCKET NO.:
050-400 UNIT:
Harris Unit 1
DATE:
August 1991 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Harris Unit 1
operated at 100.00 percent Availability Factor for the referenced month and a 99.43 percent Capacity Factor.
There was one event.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel, 605 spent fuel assemblies, stored in the Spent Fuel Pools.
413 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
28 of the spent fuel assemblies are from CP&L's Robinson Plant.
MEM/DATAREPa/1/OS4
CPbL CO
'RUN DATE 09/05/91 RUN TIME 16:24:65 NT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1
PAGE RPD36-060 OPERATING STATUS DOCKET NO. 056-406 COMPLETED BY MARK W.
HALE TELEPHONE (919)362-2944 UNIT NAME:
HARRIS UNIT 1
NOTES 2.
REPORTING PERIOD:
AUGUST I
3.
LICENSED THERMAL POWER (MWT): 2775
[ See Operations Summary.
4.
NAMEPLATE RATING <GROSS MWE): 950.9 I
5.
DESIGN ELECTRICAL RATING (NET MWE): 900.8 I
6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 926.0 7.
MAX DEPENDABLE CAPACITY (NET MWE): 860.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS
< ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET WE): None 10.
REASONS FOR RESTRICTION IF ANY:
NA THIS MONTH YR TO DATE CUMUL ATIVE 11.
HOURS IN REPORTING PERIOD 12.
NUMBER OF HOURS REACTOR CRITICAL 13.
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR ON LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEN.
(MWH) 17.
GROSS ELEC.
ENERGY GEN.
(MWH) 18.
NET ELEC.
ENERGY GENERATED (MWH)
UNIT SERVICE FACTOR 20.
UNIT AVAIIABILITY FACTOR 21.
UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS None.
744.00 744.00
.80 744.00
.60 2045765.52 679068.60 63618'9.00 100.00 100.08 99.43 95.61
.60 (TYPE,
- DATE, 5831.06 4212.91
.00 4152.75
.60 10992369.96 3673528.00 3412127.00 71.22 71.22 68.04 65.02 1.34 AND DURATION 37992.00 38059.00
.00 29625.10
.08 78047614.26 25925462.66 24689297.08 77.98 77.98 73.73 70.45 4.22 OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
NA 26.
UNITS IN TEST STATUS
<PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 " 9 MEM/DATAREPa/2/OS4
M, I 4
'Ill4, 4',t
'\\"
t(tt MK<<
M t I( MTK, 4
I, I
V
(
kl I
M M
I
'I 4(
K k
Kit
~
~
CPhL $O
~NT PERFORHANCE DATA SYSTEH
%UN MTE 09/05/91 APPROX B AVERAGE DAILY POWER LEV~
RUN TIHE
) 0: 24: 03 HARRIS UNIT 3
PAGE RPD39-080 AUGUST 3993 DAY AVG. DAILY POWER LEVEL (HWE-NET) 867 866 857 DOCKET NO. 050-400 COHPLETED BY HARK W.
HALE TELEPHONE (919)362-2944 DAY AVG. DAILY POWER LEVEL (HWE-NET) 38 858 857 862 863 859 20 859 868 868 865 864 10 858 859 862 867 28 861 858 t4 86f 863 30 860 1.16 "8 MEM/DATAREPa/3/OS4
4 0
c
(
II
)
ll
~,
'i I e'P Y
K M
N,
UNIT SHUTDOWNS ANO POWER REDUCTION REPORT MONTH:
August 1991 UNIT NAME:
Harris DATE:
9/04/91 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 No.
Date Tl y
P e
Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report g System Code 4
Component Code 5
Cause 8, Corrective Action to Prevent Recurrence 91-015 910803 0.0 N/A Valve Reduced unit power to 70$ to perform turbine valve test.
While power was
- reduced, repairs were made to the primary bus duct cooling and to the "B" Heater Drain Pump seal flow switch.
Unit was returned to 100$ on Aug. 5, 1991 at 04:00.
I F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/4/OS4
'll E
C 1