Monthly Operating Rept for Jul 1991 for Harris Nuclear Power Plant Unit 1
ML18010A368
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/31/1991
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-913021-(O), NUDOCS 9108200228
Download: ML18010A368 (10)


Text

ACCELERATED DI REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9108200228 DOC.DATE: 91/07/31 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.

Carolina Power

& Light Co.

RICHEY,R.B.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 R

SUBJECT:

Monthly operating rept for Jul 1991 for Harris Nuclear Power Plant Unit 1.W/910815 ltr.

DISTRIBUTION CODE'E24D COPIES RECEIVED'LTR U ENCL L SIZE'ITLE:

Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

D 05000400 /

A RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.

INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NMP-'DSBQ LPEB10 EG FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTEr CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

~ ~

Carolina Power & Light Company P. O. Box 165 ~ New Hill,N. C. 27662 R. B. RICHEY Vice President Harris Nuclear Project AUG 1

5 1991 File Number'SHF/10-15505 Letter Number:

HO-913021 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO+ 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with,Technical, Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1991.

Yours very truly, R.

B. Richey Vice President Harris Nuclear Project MWH:svm Enclosure ccMr. S.

D. Ebneter (NRC-RII)

Mr. R.

G. Oehl (DOE)

Mr. J.

E. Tedrow (NRC-SHNPP)

(

910S200228 910731 PDR ADOCK O~i000400 R

PDR MEM/DATAREPa/1/OS4

~ups<

I

~ ~

fp Ikp a'

1 II pf

. ~PaL CO RUH DATE 88/89/91 RUN 'rINE t4: <<:23 t.ANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 3

PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY NARK W.

HALE TELEPHONE (919)362"2944 2 k 3.

4, 5.

6.

7 4 8.

UNIT NAME:

HARRIS UNIT 1

NOTES REPORTIHG PERIOD:

JULY 91 I

LICENSED THERMAL POWER (NWT): 277S l See Operations Summary.

NAMEPLATE RATING (GROSS NWE): 950.9 I

DESIGN ELECTRICAL RATING (NET MWE): 900.0 NAX DEPEHDABLE CAPACITY (GROSS NWE): 920.0 NAX DEPENDABLE CAPACITY (NET MWE): 860.0 IF CHANGES OCCUR IH CAPACITY RATINGS

( ITEMS 3 THRU 7)

SIHCE LAST REPORT I GIVE REASONS:

N/A 9.

10.

POWER LEVEL TO WHICH RESTRICTED IF AHY (HET MWE):

N/iA REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUNUL ATIVE f2 ~

13.

14.

35.

16.

t7.

18.

19.

20.

21.

22.

23.

24.

HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEH.

(NWH)

GROSS ELEC.

ENERGY GEH.

(MWH)

NET ELEC.

ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAP.

FACTOR (USING NDC NET)

UNIT CAP.

FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS NONE.

744.00 744.00

.00 744.80

.00 2048023.26 682231.88 639S56.80 308.88 380.00 99.96 95.51

.00 (TYPE,

DATE, 5087.00 3468.9<

.00 3408.75

.08 8946604.44 2994468.08 2775938.00 67.81 67.83 63.45 60.63 3.63 AND DURATION 37248.80 29315.88

.08 28881.10

.00 76801848.74 25246394.00 23453188.08 77.54 77.54 73.21 69.96 4,32 OF EACH):

25.

26.

IF SHUTDOWN AT END OF REPORT

PERIOD, ESTIMATED DATE OF START UP:

UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MEM/DATAREPa/2/OS4

OPAL. CO RUN DATE 08/09/9$

RUN 7IHE 14:11:22

,ANT PERFORHANCE DATA SYSTEH APPWh.i DIX B AVERAGE DAILY POWER LEV~t.~

HARRIS UNIT 1

PAGE RPD39-000 JULY

> 993 DAY AVG. DAILY POWER LEVEL (HWE-NET) 862 855 855 DOCKET NO. 050-400 COHPLETED BY HARK W.

HALE TELEPHONE (9/9)362-2944 DAY AVG. DAILY POWER LEVEL (HWE-NET) 868 867 864 857 20 861 30 856 855 858 866 864 23 25 27 85'9 857 861 864 869 f2 867 28 864 773 865 868 30 865 865 3.16 - 8 MEM/DATAREPa/3/OS4

I ~

l

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

July 1991 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1

operated at 100.00 percent Availability Factor for the referenced month and a 99.96 percent Capacity Factor.

There was one event.

Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel, 570 spent fuel assemblies stored in the Spent Fuel Pools.

378 of the spent fuel assemblies are BMR and were shipped to Harris from CP&L's Brunswick Plant.

28 of the spent fuel assemblies are from CP&L's Robinson Plant.

MEM/DATAREPa/1/OS4

4 I

I

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

July 1991 UNIT NAME:

Harris DATE:

7/06/91 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Ti y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 91-014 910714 0.0 8

N/A HA Valve Reduced unit power to 705 to perform turbine valve test.

Unit was returned to-1005 power on 7/14/91.

I F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I

Same Source MEM/DATAREPa/4/OS4

4

~.

4 ~

t