ACCELERATED D TRIBUTION DEMONS TION SYSTEM r4>
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9107170234 DOC.DATE: 91/06/30 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.
Carolina Power
& Light Co.
RICHEY,R.B.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATXON DOCKET 05000400
SUBJECT:
Monthly operating rept for June 1991 for Harris Unit 1.W/
910711 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR $ ENCL Q SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
D 05000400 /
RECXPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.
XNTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPXES LTTR ENCL 3
3 1
1
" 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NR~R.DLPQ/LPEB10 EG 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D R
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
Carolina Power 8 Light Company P.O. Box 165 ~ New Hill,N.C. 27562 R. B. RICHEY Vice President Harris Nuclear Project JUL 1
1 1991 File Number:
SHF/10-15505 Letter Number:
HO-913019 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of June 1991.
Yours very truly, R. B. Richey Vice President Harris Nuclear Project MWH:svm Enclosure cc.'Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP) 9i07170234 9i0630 PDR ADOCK 05000400 PDR
~-~
MEM/DATAREPa/1/OS4
DOCKET NO.:
050-400 UNIT:
Harris Unit 1
DATE:
June 1991 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at 92.16 percent Availability Factor for the referenced
month and a 87.68 percent Capacity Factor.
There were four events.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel, 534 spent fuel assemblies stored in the Spent Fuel Pools.
342 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
Twenty eight of the spent fuel assemblies are from CP&L's Robinson Plant.
MEM/DATAREPa/1/OS4
t I'
CPAL CO RUN DATE 67/69/91 RUN TIME 11:16:26
, LANT PERFORMANCE DATA SYSTEM OPERATlHG DATA REPORT HARRIS UNIT 1
PAGE RPD36-000 OPERATING STATUS DOCKET NO. 050-400 COMPI ETED BY MARK W.
HALE TELEPHONE (919)362-2944 UNIT NAME:
HARRIS UNIT f I
NOTES 2.
REPORTIHG PERIOD:
JUNE 91 I
3.
LICENSED THERMAL POWER (MWT>: 2775 I See Operations Summary.
4.
NAMEPLATE RATING
<GROSS MWE): 950.5' 5.
DESIGH ELECTRICAL RATING (HET MWE>: 900.0 I
6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 5'20.0 7.
MAX DEPENDABLE CAPACITY <NET MWE): 860.0
- 8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS: N/A 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): N/A 16.
REASOHS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATIVE 11.
HOURS IH REPORTIHG PERIOD 12.
NUMBER OF HOURS REACTOR CRITICAL 13.
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR OH LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEH.
(MWH) 17.
GROSS ELEC.
ENERGY GEH.
(MWH)
$ 8.
NET ELEC.
ENERGY GENERATED (MWH) f9. UNlT SERVICE FACTOR 26.
UNIT AVAILABILITYFACTOR 21.
UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS NONE.
720.00 675.02
.00 663.58
.66 174693$.32 582502.00 542884.00 92.f6 92.16 87.68 83.78 7.84 (TYPE, DATEI 4343.06 2724.9)
.00 2664.75
.00 6898581.18 2312229.66 2336382.66 61.36 61.36 57.20 54.66 2.07 AHD DURATION 36504.00 28573.66
.06 28137.16
.00 73953825.48 24564163.66 22813552.66 77.68 77.08 72.67 65'. 44 4.43 OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IH TEST STATUS (PRlOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY IHITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 MEM/DATAREPa/2/OS4
4 4
t C
i I"
s l'
~ CPAL CO LANT PERFORHANCE DATA SYSTEH RUN DATE 07/09/93 APPENDIX B AVERAGE DAILY POWER LEVEL RUN TINE 30:30:i9 HARRIS UNIT 1
PAGE RPD39-600 JUNE DAY AVG. DAILY POWER LEVEL (HWE-NET) 855 DOCKET NO. 050-400 COHPLETED BY HARK W.
HALE TELEPHONE (9)9)362-2944 DAY AVG. DAILY POWER LEVEL (HWE-NET) 852 868 551 852 854 721 772 20 23 851 849 10 f5 675 857 852 849 27 28 29 30 876 879 872 869 868 862 860 3.16 8
MEM/DATAREPa/3/OS4
k Hl
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
June 1991 UNIT NAME:
Harris DATE:
7/03/91 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 No.
Date Tl y
P e
Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report I System Code 4
Component Code 5
Cause 8, Corrective Action to Prevent Recurrence 91-010 910603 19.67 91-010 IB INSTRU Reactor trip from "99.7$ power due to low RCS loop flow.
The trip was caused by the performance of a
surveillance test on I of the 3 loop transmitters.
The root cause was attributed to procedural and maintenance methodology.
The procedures were revised to prevent recurrence.
During the trip the "A" reactor trip breaker did not open on the auto trip signal.
The breaker was manually tripped by the operator.
I F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/4/OS4
~ 4
\\
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
June 1991 UNIT NAME:
Harris DATE:
7/03/91 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 No.
Date Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report -f System Code 4
Component Code 5
Cause 8, Corrective Action to Prevent Recurrence 91-011 910604 0.0 N/A N/A N/A Ramping up unit following reactor trip.
I F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training S License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 60ther 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I Same Source MEM/DATAREPa/5/OS4
~-
~
~
J 4
I
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
June 1991 UNIT NAME:
~
Harris DATE:
7/03/91 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 No, Date Tl y
P e
Duration (Hours)
Method of Shutting Down Reactor Licensee Event Report f System Code 4
Component Code 5
Cause II, Corrective Action to Prevent Recurrence 91-012 910608 36.75 N/A IA Instru Unit removed from service to test the manual reactor trip switch.
The reactor trip switch had been replaced on May 18,
- 1991, and it was determined at this time that the post maintenance testing was inadequate to prove circuit operability The switch was appropriately tested with satisfactory
- results, The unit was ramped to 99$ power.
I F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training I, License Examination F-Administrative G-Operational Error (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load
.6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161 )
5 Exhibit 1 - Same Source MEM/DATAREPa/6/OS4
S:,,
t
~
~
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
June 1991 UNIT NAME:
Harris DATE:
7/03/91 COMPLETED BY:
M.. W. Hale TELEPHONE:
(919) 362-2944 Date Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report S
System Code 4
Component Code 5
Cause 8 Corrective Action to Prevent Recurrence 91-013 910609 0.0 N/A N/A N/A Ramping up unit following the repair of the "A" reactor trip breaker/circuit.
Reactor power is limited to 995 power due to a high flow alarm on "C" Steam Generator Main Feedwater flow.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I Same Source MEM/DATAREPa/7/OS4