Monthly Operating Rept for May 1991 for Harris Unit 1
ML18009A941
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1991
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-913018-(O), NUDOCS 9106200265
Download: ML18009A941 (15)


Text

.,

~~g ACCELERATED DIS UTION DEMON 4

A TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9106200265 DOC.DATE: 91/05/31 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.

Car'olina Power

& Light Co.

RICHEY,R.B.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating rept for May '1991 for Harris Unit 1.

W/910617 ltr.

DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL 4 SIZE:

TITLE: Monthly'perating Report (per Tech Specs NOTES:Application for permit renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-'1 LA MOZAFARI,B.

INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL EG &G BRYCE iJ ~ H NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1' 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD'EOD/DOA N~&XrP.

PEB1 0 EG FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACfTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

~ h I

li I

a 4

r l

~s e

ls 1

5 s

~

I

~

g f C

~

~

I J

U "Il 4 a

t 4

~

Carolina Power & Light Company P.Q. Box165 ~ New Hill,N. C.27562 R. B. RICHEY Vice President Harris Nuclear Project JU) 1 7

1991 File'umber:

SHF/10-15505 Letter Number'HO-913018 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT Dear Sirs-'n accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1991.

Yours very truly, R. B. Richey Vice President Harris Nuclear Project MWH:svm Enclosure cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. R.

G. Oehl (DOE)

Mr. J.

E. Tedrow (NRC-SHNPP) 9106200265 910531 PDR ADOCK 05000400I R

PDR MEM/DATAREPa/1/OS4

'1

',K %

'0 t hr,

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

May 1991 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

II Harris Unit 1 'operated at 29.95 percent Availability Factor for the referenced month and a 13.21 percent Capacity Factor.

There was one refueling outage and three events.

Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel, 498 spent fuel assemblies stored in the Spent Fuel Pools.

306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.

Twenty eight of the spent fuel assemblies are from CP&L's Robinson Plant.

MEM/DATAREPa/1/OS4

CPaL CO RUH DATE 06/10/91 RUH TIME 11:57:42 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY MARK W.

HALE TELEPHONE

<919)362-2944 1.

UNIT NAME:

HARRIS UNIT 1

NOTES 2.

REPORTIHG PERIOD:

MAY 91 I

3.

LICENSED THERMAL POWER

<MWT): 2775 See Operations 4.

NAMEPLATE RATING (GROSS MWE): 958.9 I

5.

DESIGN ELECTRICAL RATING (NET MWE): 968.0 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.

MAX DEPENDABLE CAPACITY (HET MWE): 860.0

8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE GIVE REASONS: N/A I

I Surnrnary.

I I

I I

LAST REPORT, POWER LEVEL TO WHICH RESTRICTED IF AHY (HET MWE): None.

10.

REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATIVE HOURS IN REPORTING PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR ON LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GEH.

<MWH) 17.

GROSS ELEC.

ENERGY GEH.

<MWH) 18.

HET ELEC.

ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 21.

UNIT CAP.

FACTOR (USING MDC NET) 22.

UNIT CAP.

FACTOR (USING DER HET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS 744.00 271.17

.80 222.80

.00 340812.18 106247.00 84517.00 29.95 29.95 13.21 12.62

.00 (TYPE,

DATE, None.

3623.60 2049.89

.00 2601.17

.00 5151649.86 1729727.60 1593498.00 55.24 55.24 51.14 48.87

.00 AND DURATION 35784.00 27895.98

.06 27473.52

.00 72206894.16 23981661.60 22270668.66 76.78 76.78 72.37 69.15 4.34 OF EACH):

25. IF SHUTDOWN AT EHD OF REPORT
PERIOD, ESTIMATED DATE OF START UP:

N/A 26.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MEM/DATAREPa/2/OS4 1.16 9

r P

N 51 i

)

CPbL CQ PLANT PERFORHANCE DATA SYSTEM RUN DATE 06/38/93 APPENDIX B AVERAGE DAILY POWER LEVEL RUN TIME 11:57:42 HARRIS UNIT 1

PAGE RPD39-000 HAY DOCKET NO. 050-400 COMPLETED BY MARK W.

HALE TELEPHONE (919)362-2944 DAY AVG. DAILY POWER LEVEL (HWE-NET)

DAY AVG. DAILY POWER LEVEL (HWE-NET)

-15 20 22 155 127 28 383 604

-28 30 620 815 1.16 8

MEM/DATAREPa/3/OS4

N V"

l I

V

UIIIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

May 1991 UNIT NAME:

Harris DATE:

6/10/91 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date TI y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee EvenT Report /I System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 91-006 910316 518.05 N/A N/A Unit was shutdown for the scheduled cycle 4 refueling outage.

The reactor went critical on 5-20-91 and synchronized to the grid at 14:03 on 5-22-91.

I F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II, License Examination F-Administrative G-Operational Error (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG;0161) 5 Exhibit I Same Source MEM/DATAREPa/4/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

May 199)

UNIT NAME:

Harris DATE:

6/10/91 COMPLETED BY:

M. W. Hale TELEPHONE:

(919). 362-2944 Date Tl y

p e

Duration (Hours)

Method of Shutting Down Reactor Licensee Event Report II System Code 4

Component Code 5

Cause 8 Corrective Action to Prevent Recurrence 91-007 910522 0.0 N/A N/A N/A Ramping up and testing unit following cycle 4 refueling outage.

I F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/5/OS4

h

'E Q

l V

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

May 1991 UNIT NAME:

Harris DATE:

6/10/91 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report //

System Code 4

Component Code 5

Cause 4 Corrective gction to Prevent Recurrence 91-008 910525

3. 15 N/A N/A N/A Unit went offline to perform ihe Turbine Overspeed Trip Test'nd returned to service on 05-25-91 at 07:39.

I

  • F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training 8, License Examination F-Administrative G-Operational Error (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I Same Source MEM/DATAREPa/6/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

May 1991 UNIT NAME:

Harris DATE:

6/10/91 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 91-009 910525 0.0 N/A N/A N/A Ramping up and testing following Turbine Overspeed Trip Test.

Unit reached 100$ on 06-01-91.

I F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training 4 Licens'e Examination F-Administrative G-Operational Error (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit 1

Same Source MEM/DATAREPa/7/OS4