ML18009A866
| ML18009A866 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/31/1991 |
| From: | Hale M, Richey R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HO-913011-(O), NUDOCS 9104180317 | |
| Download: ML18009A866 (13) | |
Text
ACCELERATED DISTRIBUTION DEMONSATION SYSTEM
~ ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9104180317 DOC.DATE: 91/03/31 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.
Carolina Power 6 Light Co.
RICHEY,R.B.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET g
05000400
SUBJECT:
Monthly operating rept for Mar 1991 for Harris Nuclear Unit 1.W/910415 ltr.
DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR E ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Speck)
NOTES:Application for permit renewal filed.
D 05000400 /
A RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL EGGG BRYCE iJ ~ H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD DOA
'GAP PEB10 G FILE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
'C Carolina Power & Light Company P. O. Box 165 ~ New Hill~ N.C. 27562 R. B. RICHEY Vice President Harris Nuclear Project APR 1 5 l99l File Number.'HF/10-15505 Letter Number'.
HO-913011 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical. Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1991.
Yours very truly, C.s R. B. Richey Vice President Harris Nuclear Project MWH:smh Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP)
MEM/DATAREPa/1/OS4 9i04180317 9i033i PDR ADOCK 05000400 R
C s
P I'~
I I'
DOCKET NO.:
050-400 UNIT:
Harris Unit 1
DATE:
March 1991 COMPLETED BY:
Mark Hale, OPERATIONS
SUMMARY
Harris Unit 1
operated at a 48.71 percent Availability Factor for the referenced month and a 47.39 percent Capacity Factor.
There were two events and one refueling outage.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor
- vessel, 438 spent fuel assemblies, and 60 new fuel assemblies stored in the Spent Fuel Pools.
306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
Twenty eight of the spent fuel assemblies are from CP&L's Robinson Plant.
MEM/DATAREPa/1/OS4
CP$ L CQ PLANT PERFORMANCE DATA STEM gUN DATE 84/89/91 OPER*TING DATA REPQ RUN TIME 05': 35': 57 HARRIS UNIT PAGF Rr D36-eee QPER*TXNG STATUS DOCKET HO. 050-400 COMPLETED BY MARK W.
HAI E TELEPHONE (915')362-2944 A
2 J 3 4 5 k 6.
7
- 8 ~
UNIT NAME:
HARRXB UHXT NOTES REPORTIHG PERIOD:
MARCH 91 I See operations summary.
LXCENBED THERMAL POWER
<MWT): 2775 I
NAMEPLATE RATXHG (GROSS NWE): 958.5' DESIGN ELECTRXC*L RATING (HET MME): 900.0 I
MAX DEPENDABLE CAPACXTY (GROSS MWE): 920.0 MAX DEPENDABI E CAPAClTY (NET NME>: 860.8 IF CH*HGEB OCCUR IN CAPACITY RATlHGB (ITEMS 3 THRU 7)
$ 1HCE LAST REPORT, GXVE REASONS:N/A
<e.
POWER LEVEL TO WIIXCH RESTRICTED IF ANY (HET MWE): N/A REASONS FOR RESTRICTION lF AHY:N THIS MONTH YR TO DATE CUMUL
- TIVE 12 13.
14.
15.
16.
17 ~
18.
19*
20, HOURS IH REPQRTXNG PERIOD NUMBER OF HOURS REACTOR CRXTlCAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR OH LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEN*
(NMH)
GROSS ELEC.
EHERGY GEN.
(NWH)
NET ELEC.
ENERGY GENERATED
<NMH)
UH IT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAP.
FACTOR
<USING NDC HET>
UNIT CAP.
FACTOR (USING DER HET>
UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.
OVER NEXT 6 NOHTHS Refueling Outage 3/16/91 5/18/91 744.00 362.72
.80 362.37
.08 978254.18 3385'79.88 38323<.ee 48.71 48.7$
47.39 45.29
.08 (TYPE,
- DATE, 2<68.88 1778.72
.80 1778.37
.ee 4818837.68
<623488.88 1514927.88 82.33 82.33 81.55 77.93
.00 AND DURATION 34321 00 27624.81 F 00 27250.72
.08 71866881.98 23875414.88 2219285'7.88 75'. 48 79.40 75.19 71.84 4.38 QF EACH):
IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIM*TED DATE OF START UP: 5/18/91 UHXTS IH TEST STATUS (PRXOR TO COMMERCIAL OPERATXOH):
FORECAST ACHIEVED IHITXAL CRlTXCALITY INlTXAL ELECTRXCXTY COMMERCIAL OPERATION MEM/DATREPa/2/OS4
Wka'I tali
. t*
C.P ka '('
'I h VW W
"I h
H W
I I,W till a
.a It v
h
~
'll II" k
a I
Il I
(
W!
Y(
aq I
I'll I
h tt
't Ia II W) p'pa W I
- vtr, I!I
, tl W ,
IW!
W>>
I qlt q>>a ry
'tt p','q (W
q
~ 'k; I
I tf',Ir ',,]
P,'(I It, Itr II>>
l'W't(a, a
w 'lor'k"ri!Wwt',"(h "r'Ij
-;,,;war tttl,'a p 'I W,+>>,
q q>>P "t
tkl
(
jj, q,>>c rha 'j Pl>>
'rj w I "
'r!,,a lp' g
tr'vr,>>v Wp'
!I W
a W
jp(
h'It I"
a(
a vw pq>>jrk $
'i "I 9 (wgt'jka w "t w 'l (j raq!
hl I
r,kr I
tt vk a'j ii t!
ak It
>>arkk
CF'b L'O PLANT PERFORHANCE DATA STEH l3UN DATE 84/89/93 I='PENDIX B AVERAGE DAlLY WER I EVEL RUN TIHE 89: 39: 55 HARRIS UNlT PAGE RPD 39-888 DOCKET NO. 050-488 COHPI ETED BY HARK W.
HALE TELEPHONE (919)362-2944 HARCH DAY AVG.
DAII Y POWER LEVEL
<HWE-NET) 872 866 DAY AVG. DAlLY POWER LEVEL (HWE-NET) 873 747 28 877
<8 877 874 867 822
$.16 8
MEM/DATREPa/3/OS4
~
,I I
tt
/'I lt '~
$ I,'I I
kt
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
March 1991 UNlj'AME:
Harris DATE:
4/8/91 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 No.
Date Tl y
P e
Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report S
System Code 4
Component Code 5
Cause II, Corrective Action to Prevent Recurrence 91-004 910305 0.0 91-002 INSTRU Reduced power to approximately 405 due to a failed test of the A Reactor Coolant Pump underfrequency trip device.
The cause was found to be disconnected cables to the A II C Reactor Coolant pump breakers.
The cables were reconnecied and a test of the System was performed satisfactorily.
Unit was then returned to 1005 power.
1 F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 1I, License Examination F-Administrative G-Operational Error (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4
4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/4/OS4
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
March 1991 UNIT NAME:
Harrls-DATE:
4/8/91 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 No.
Date Tl y
p e
Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report /f System Code 4
Component Code 5
Cause 8, Corrective Action to Prevent Recurrence 91-005
. 910314 0.0 N/A ZZ ZZZZZ Unit ramped down in preparation for refueling outage 3 which commenced on 3/16/91 at 02:22.
I F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/5/OS4
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
March 1991 UNIT NAME:
Harris DATE:
4/8/91 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 No.
Date Tl y
P e
Duration (Hours)
Method of Shutting Down Reactor Licensee Event Report S
System Code 4
Component Code 5
Cause 1I Corrective Action to Prevent Recurrence 91-006 910316 381.63 N/A N/A N/A Unit was shutdown for the scheduled cycle 4 refueling outage.
I F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I Same Source IIEM/D~'PRFPa/6/OS4