ML18009A814

From kanterella
Jump to navigation Jump to search
Annual Operating Rept for 1990,including Number of Personnel & man-rem by Work & Job Function,Primary Coolant Iodine Spikes & Primary Safety & Relief Valve Challenges
ML18009A814
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1990
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-910012-(O), NUDOCS 9102250244
Download: ML18009A814 (7)


Text

ACCELERATED DISQUBUTION DEMONS'TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~ACCESSION NBR:9102250244 DOC.DATE: 90/12/31 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION RICH?i'8,R.B.

Carolina Power

& Light Co.

mz. Z4'.

RECIP. NAME RECIPIENT AFFILIATION w//yy

SUBJECT:

Annual operating rept for 1990,including number of personnel

& man-rem by work

& job function,primary coolant iodine spikes

& primary safety

& relief valve challenges.W/910215 ltr.

DISTRIBUTION CODE IE56D COPIES RECEIVED LTR ENCL SIZE TITLE: 20.407 Annual Personnel Monitoring Rpt/Annual Rad Exposure Rpt by Fun NOTES:Application for permit renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACNW NRR/f304

.OEA-R

-LE 0

RG 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1

0 1

0 6

6 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DSP/TPAB NRR/DREP/PRPB11 RES BROOKS,B NSIC COPIES LTTR ENCL 5

5 1

1 2

2 2

2 1

1 D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 23 ENCL 21

/jL A

D D

COLL Carolina Power 8 Light Company P. O. Box t65 ~ New Hill,N. C. 27562 R. B. RICHEY Vice President Harris Nuclear Project FEB 1

5 j99j Letter Number:

HO-910012 (0)

Document Control Desk United States Nuclear Regulator Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.

50-400 LICENSE NO. NPF"63 ANNUAL OPERATING REPORT Gentlemen'.

In accordance with Technical Specification 6.9.1.2 for the Shearon Harris Nuclear Power Plant, Unit No.

1, Carolina Power and Light Company herewith submits the annual report of (a) individuals receiving exposures greater than 100 mrem/yr and their associated man-rem exposure according to work and job functions, (b) primary coolant iodine

spikes, and (c) challenges to the pressurizer power-operated relief valves (PORVs) and primary safety-valves for 1990.

Very truly yours, R. B. Richey Vice President Harris Nuclear Project MGW:mbr Enclosure cc'Mr. S.

D. Ebneter (NRC-RII)

Mr. J.

E. Tedrow (NRC-SHNPP) 9102250244 901231 PDR ADOCK 05000400 R

PDR MEM/HO 9100120/1/OS1

t1

~

~

RIMS II NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB

FUNCTION, 1990 HARRIS PLANT NUMBER OF PERSONNEL 100 MREM I

TOTAL MAN-REM

'ORK ANO JOB FUNCTION STAT UTIL CNTR i

STAT UTIL CNTR REACTOR OPERATIONS AND SURVEILLANCE MAINTENANCE PERSONNEL 0

OPERATING PERSONNEL 14 HEALTH PHYSICS PERSONNEL 19 SUPERVISORY PERSONNEL 0

ENGINEERING PERSONNEL 0

0 I

0 0

~

13 0

0 0

0 0 ~ 221 4.954 5.317 0, 125 0.789 0.000 0.000 0.000 0.010

0. 180 0.475 1 '87 3.841 0.010 0.207 ROUTINE MAINTENANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL INSERVICE INSPECTION MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL SPECIAL MAINTENANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL WASTE PROCESSING MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL REFUELING MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 4

1 19 0

0 1

0 0

0 0

0 0

0 0

0 2

0 1

0 2

0 0

2 D

0 D.

0 0

0 38 1

74 5

0 2

18 0

23 0

0 0

8' 13 0

0 0

1 0

0 4

0 2

0 0

0 0

0 0

0 0

0 0

0 0

0 0

'0.

0 0

0 0

0 2.918 0.005

0. 194 0.000

, 0.182 0.694

'O. 218 0.280 0 010

0. 092 16.847 2.661 7.067 0.000 3.568 0.485 0'25' a 291 0'. 000 0.010 0 000 0 000 0.000 0.000 0.000
0. 180 0.000 0.000 0.000 0.005 0.000 0.000 0.000 0.000 0.020 0.533 0.000 0.000 0.000
0. 145 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 8 ~

233'.230 0.296 0.000 0.084 0.431 0.570 0.683 0.000 0.075 32.652 0.500 7.945 0'25 3.710 0 ~ 175 0.000 0.541 0.000

0. 135 0.000 0.000 0.000 0.000 0.000 TOTAL MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 44 21 4'1 0

8 2

94 0

6 0

40 0

0 1

14 21

~ 163

~ 8.063

14. 149
0. 135 4.641 0.713 0.000 0.000 0.010 0.350 39 '66 2.367 13 ~ 306 0.035 4.211 GRAND TOTAL 114 3

154

48. 151 1 '73 '9.885 Notes:

(1) Dose based on pocket dosimeters (2) Stat ~ Har'ris Plant Staff Util ~ CP&L non-Harris personnel Cntr Contractors

1990 ANNUAL REPORT PRIMARY COOLANT IODINE SPIKES During 1990, the primary coolant did not exceed 1.0 pCi/gram dose equivalent I-131 or 100/E-bar pCi/gram gross radioactivity as set forth in Technical Specification 3.4.8.

MEM/HO-9100120'/OS1

~

~

1990 ANNUAL REPORT PRIMARY SAFETY AND RELIEF VALVE CHALLENGES On July 26,

1990, pressurizer power-operated relief valve (PORV) 1-PCV-444B was inadvertently opened by a reactor operator.

The PORV was immediately reshut.

Approximately 34 gallons of primary coolant was discharged to the Pressurizer Relief Tank during the cycling of the PORV.

The event occurred while performing prerequisites for a surveillance test.

The operator was to move the control switch for 1-PCV-444B from the automatic control position to the closed position but instead moved, the switch in the wrong direction to the open position.

The event was reviewed with each of the operating shifts.

MEM/HO-91001'70/4/OS1